USPTO serial 86217836
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Stewart L Gitler
STEWART L GITLER WELSH FLAXMAN & GITLER LLC2000 DUKE ST STE 100ALEXANDRIA, VA 22314-6101UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines, power-operated mechanical devices, mechanical conveyor belts, mechanical hoisting apparatus for painting and coating of materials and surfaces; power-operated and pneumatically operated machines and mechanical devices to apply flocking materials to surfaces; machines and mechanical devices for coating and painting of surfaces with flocking material; power-operated and pneumatically operated paint supply systems, namely, machines, mechanical devices and mechanical pumps used to supply paints in painting plants; pneumatically operated high-rotation atomisers as parts of robots, machines and mechanical devices for painting and coating of materials and surfaces with paints and other liquids; industrial painting robots; machines and power-operated mechanical devices for mixing paints; pneumatically operated atomizing systems, namely, atomizing spray guns as parts of machines, robots and mechanical devices for atomizing of paints and other liquids for the application and coating of surfaces and materials; machines, mechanical devices, mechanical conveyor belts and mechanical hoisting apparatus for dipping and spraying; machines, mechanical devices, mechanical conveyor belts, mechanical hoisting apparatus used in power-operated equipment for cleaning and priming surfaces by dipping and spraying; machines, mechanical devices, mechanical conveyor belts and mechanical hoisting apparatus used for dipping; machines, mechanical devices, mechanical conveyor belts, mechanical hoisting apparatus for the cleaning and coating of surfaces by means of dipping; power-operated spray booths, namely, machines and mechanical devices for painting and coating of surfaces; power-operated and pneumatically operated powder coating plants, namely, machines and mechanical devices for painting and coating of surfaces by means of powder coating technology; cleaning machines for paint spray guns; power-operated installations for paint preparations, namely, machines and mechanical devices for mixing of painting materials; machines for electrostatic painting; machines, power-operated mechanical devices, mechanical conveyor belts as well as mechanical hoisting apparatus for coating and painting of surfaces by means of solvent-containing and solvent-free paints and other media; power-operated and pneumatically operated paint coagulation and paint sludge removal systems, namely, machines, mechanical devices, mechanical centrifuges and mechanical scraper for dividing and separating of paint sludges; power-operated conveyor systems, namely, mechanical conveyor belts, mechanical hoisting apparatus as well as mechanical devices for feeding and transporting workpieces for processing during the painting and the coating of surfaces; pigging systems, namely, pneumatically operated devices in pipes for the reduction and dosing of paint during painting processes; gas-operated flame treatment systems, namely, machines and mechanical devices for the preparation of surfaces by means of heat for the coating and application of paints and other media; heat exchangers being parts of a machine for the recovery of heat of supply air | SECTION 8 - CANCELLED | — |
| 009 | automated process control and visualisation systems comprised of logic based hardware used to control, operate, monitor and visualise the status of automatic plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units, plants composed of automatic plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units; devices, namely, dispensers of preset portions of fluids, solid granulates and powder for dosing purposes, all not for medical use; dispensers that count and measure output of fluids, solid granulates and powder in painting plants not for medical use; dosing systems composed of dispensers of preset portions of fluids, solid granulates and powder for dosing purposes and dispensers that count or and measure output for use with fluids, solid granulates and powder not for medical use | SECTION 8 - CANCELLED | — |
| 011 | Air supply filtering installations using thermal oxidation for desorption in the concentration process; heat recovery installations for the recovery of heat of supply air; industrial drying apparatus for exhaust air; exhaust air purification devices and exhaust air purification units; exhaust air purification systems composed of exhaust air purification devices and exhaust air purification units; sustainable onsite water recycling and waste water treatment filters | SECTION 8 - CANCELLED | — |
| 037 | Construction, installation, conversion, retrofitting, reconstruction, reconditioning, renovation of painting plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units; maintenance services for machines for applying surface treatments, conveyor belts, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units; maintenance services for machines for applying surface treatments, conveyor belts, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units with the aid of electronic networks, namely, by means of the use of remote maintenance | SECTION 8 - CANCELLED | — |
| 042 | Technical testing and surveying for quality control purposes of conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units; science and technology design services in connection with automatic plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units; research and development in relation to automatic plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units, plants composed of automatic plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units; industrial research in relation to automatic plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units, plants composed of automatic plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units; design and development of computer programs for automatic plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units, plants composed of automatic plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units; technical consulting services for the development and planning of conveyor belts, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units, plants composed of automatic plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units; technical consultancy in the field of painting plants, conveyor belts, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units, plants composed of automatic plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units; programming and installation of software for automatic plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units, plants composed of automatic plants of surface technology, conveyors, air supply conditioning units, industrial dryers for heating and dehumidifying, exhaust air purification units and waste water treatment units | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 13, 2023 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Jun 28, 2021 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jun 28, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 24, 2016 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| May 16, 2016 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Mar 31, 2016 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Mar 31, 2016 | EPPA | TEAS POST PUBLICATION AMENDMENT RECEIVED | — |
| Oct 20, 2015 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Aug 25, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 25, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 5, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 17, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 16, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 16, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 16, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 16, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 16, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 5, 2015 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Feb 5, 2015 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 5, 2015 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 29, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 29, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 18, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 24, 2014 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 24, 2014 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 24, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 15, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 6, 2014 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| May 23, 2014 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| May 16, 2014 | ALIE | ASSIGNED TO LIE | — |
| May 6, 2014 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| May 6, 2014 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Mar 25, 2014 | MPMK | NOTICE OF PSEUDO MARK E-MAILED | — |
| Mar 24, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 14, 2014 | NWAP | NEW APPLICATION ENTERED | — |