Drawing for LIFE IS ON BY SCHNEIDER ELECTRIC

USPTO serial 86227655

LIFE IS ON BY SCHNEIDER ELECTRIC

Reviewed by CopyMark Law Group

Reg. 4986161Status 710
Filing date
Status date
Registration date
Jun 28, 2016
Examiner
YAO, GRETTA
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with LIFE IS ON BY SCHNEIDER ELECTRIC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Steven T. Shelton

STEVEN T. SHELTON COZEN O'CONNOR277 PARK AVENEW YORK, NY 10172-0003UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Light controls; electrical curtain controls; climate control systems consisting of digital thermostats, air conditioning, heating, and ventilation control devices; thermostats; temperature sensors; electrical plugs and sockets; electrical outlets; movable sockets; multi-outlet socket blocks; circuit breakers; circuit breaker panel boards; electric circuit switches; electric current switches; light switches; electric switches; light systems comprising light sensors and switches; power switches; uninterruptible electrical power supplies; battery system to provide backup power; surge protectors; voltage surge protectors; transient voltage surge suppressors with power conditioning technology; power conditioning devices; home automation systems comprising wireless and wired controllers, touch screens, controlled devices, and software for appliances, lighting, HVAC, home entertainment devices, security and other home electrical power monitoring and control applications; remote circuit breaker control switch operators; electrical apparatus, namely, charging stations for charging electric vehicles; motion detectors; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; programmable controllers and actuators that track the sun enabling concentrating optics to maximize solar energy input; security systems comprising software and hardware for providing picture, video, alarm status, building plans, and other information to a remote station; electrical and electronic burglar alarms; electronic door alarms; security products, namely, door entry systems comprising touch pads and security doors, security cameras, and recorders; fire alarm and emergency evacuation devices, namely, fire alarm control panels, smoke detectors, heat detectors, and audible and visible notification appliances; timers for controlling lighting; television antennas; dish antennas; computer network adapters, switches, routers and hubs; cable connectors; telephone and computer network outlets; computer networking hardware; electronic monitors and monitor modules for monitoring electricity consumption and greenhouse gas emission; electronic audio components for home use, namely, surround sound systems, speakers, receivers, tuners, amplifiers, pre-amplifiers, equalizers, turntables, CD players, digital-to-analog converters, and networked digital audio players; none of the foregoing having any connection to telecommunications or products for the hearing-impairedSECTION 8 - CANCELLED—
011Sockets for electric lights; LED lighting systems, namely, LED modules, power supplies, and wiring; parabolic mirrors designed for the collection of solar energy; solar energy based cooling and heating apparatus; solar energy receivers; accent lights for indoor use; ceiling lights; wall lights; solar light fixtures, namely, indoor and outdoor solar powered lighting units and fixtures; light diffusers; light bulbs; light fixtures; electric radiant heaters; water heaters; ventilation exhaust fans; bathroom exhaust fans; ceiling fans; electric heating fans; none of the foregoing having any connection to telecommunications or products for the hearing-impairedSECTION 8 - CANCELLED—
042Networking of home controls, namely, wireless and wired lighting controls, thermostat and heating controls, rolling shutters and door controls, appliance controls, namely, oven, washer, dryer, refrigerator, dishwasher, home audio and video controls; technology planning and consulting in the field of solar energy; design and inspection of fire alarm, detection and suppression systems; maintenance assessment of the performance and reliability of alarm systems; integration of computer systems and networks; design and development of wired and wireless computer networks; consultation in the field of enabling users to remotely view, monitor, program, operate and control large and small appliances, electrical systems and security systems in homes; home connectivity services, namely, design and development of wired and wireless computer networks for homes; none of the foregoing having any connection to telecommunications or products for the hearing-impairedSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 13, 2023C8..CANCELLED SEC. 8 (6-YR)—
Nov 24, 2021ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jun 28, 2021REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jun 28, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 12, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 12, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 23, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 29, 2016IUCNNOTICE OF ALLOWANCE CANCELLED—
Feb 24, 2016ATRQATTORNEY REVIEW/DECISION ON AMENDMENT REQUIRED—
Feb 24, 2016PCBGPETITION TO DIRECTOR - CHANGE BASIS - GRANTED—
Feb 23, 2016ERTITEAS RESPONSE TO PETITION INQUIRY LETTER—
Dec 2, 2015PILMPETITION INQUIRY LETTER ISSUED—
Nov 18, 2015APETASSIGNED TO PETITION STAFF—
Nov 14, 2015EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Nov 13, 2015EX2GSOU EXTENSION 2 GRANTED—
Nov 3, 2015EXT2SOU EXTENSION 2 FILED—
Nov 3, 2015EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 5, 2015AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Sep 29, 201544EP44(e) PETITION - RECEIVED—
Sep 29, 2015EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
May 2, 2015EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 30, 2015EX1GSOU EXTENSION 1 GRANTED—
Apr 30, 2015EXT1SOU EXTENSION 1 FILED—
Apr 30, 2015EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Nov 4, 2014NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 9, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 9, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 20, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 4, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 28, 2014ALIEASSIGNED TO LIE—
Jul 16, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 16, 2014XAECEXAMINER'S AMENDMENT ENTERED—
Jul 16, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 16, 2014GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 16, 2014CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 7, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 7, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 7, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 23, 2014DOCKASSIGNED TO EXAMINER—
Apr 5, 2014MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Apr 4, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 24, 2014NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance