USPTO serial 86246169
ETHOSENERGY
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Aug 6, 2019
- Examiner
- DOMBROW, COLLEEN M
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights. Track next renewal deadlines in TSDR and WIPO records.
Need help with ETHOSENERGY?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Julie B. Albert
Julie B. Albert BAKER BOTTS L.L.P.2001 Ross AvenueSuite 900DALLAS, TX 75201-2900Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Rotating equipment, namely, boiler feed pumps, gas operated power generators, centrifugal compressors, gas compressors, air compressors, axial flow compressors, screw compressors, steam turbines, gas turbines, power turbines, hydropower hydraulic turbines, hydro turbines, gearboxes, electric motors, alternators, industrial engines, reciprocating engines, aero- and aero derivative engines, and heat exchangers being parts of machines, all of the foregoing not for land vehicles; Ancillary equipment used in power generation, namely, skids in the nature of elevating transport work platforms and lifting work platforms used for mounting electro-mechanical process systems comprised of water injection, wet compression, fire water pump and cooling water, skids in the nature of elevating transport work platforms and lifting work platforms used for mounting hydraulic process systems comprised of a turbine starter and demineralized cooling water, skids in the nature of elevating transport work platforms and lifting work platforms used for mounting gas turbine auxiliary process systems comprised of chemical injection, fuel gas and fuel oil, steam engine boilers for power generation, electric generators, hydraulic controls for machines, hydraulic torque converters, hydraulic power units, hydraulic pumps, centrifugal pumps, and gears for machines, all of the foregoing not for land vehicles | ACTIVE | — |
| 009 | Computer software platforms for use in monitoring and controlling turbines for use by power plant owners and operators; Ancillary equipment used in power generation, namely, transformers and electric control panels, all of the foregoing not for land vehicles; Rotating equipment, namely, transformers, not for land vehicles | ACTIVE | — |
| 011 | Rotating equipment, namely, steam generators, not for land vehicles; Ancillary equipment used in power generation, namely, heat recovery steam generators, not for land vehicles | ACTIVE | — |
| 035 | [ Outsourcing services in the nature of arranging procurement of goods for others in the field of gas and steam turbines and other rotating and industrial equipment; Procurement, namely, purchasing gas and steam turbines and other rotating and industrial equipment for others; Purchasing and procurement services, namely, procuring of contracts for others for the purchase of gas and steam turbines and other rotating and industrial equipment for others; Procurement services, namely, purchasing gas turbines, steam turbines, hydro turbines, gearboxes, diesel and gas engine generator packages, alternators, electric motors, package boilers, gas compressors, heat exchangers, transformers, and air compressors for others, for the power plant, oil and gas, industrial, power, and renewable energy industries; Procurement, namely, purchasing the labor, parts and components of steam and gas turbines for others, to support power plant owners and operators with respect to the repair, maintenance and overhaul of their steam and gas turbine operations; Business consulting services to assist power plant owners and operators in complying with federal and state regulations; all of the foregoing for the power plant, oil and gas, industrial, power and renewable energy industries ] | SECTION 8 - CANCELLED | — |
| 037 | Maintenance, repair, replacement, and renovation of components, parts, or systems in steam and gas turbine generators; Maintenance, repair, replacement, and renovation of components, parts or systems in rotating equipment, including pumps, generators, compressors, steam turbines, power turbines, gearboxes, electric motors, industrial engines, reciprocating engines, aero/aeroderivative engines, compressors, and hydro turbines; Maintenance, repair, replacement, and renovation of ancillary equipment used in power generation in the nature of electro-mechanical skids, hydraulic skids, gas turbine auxiliary skids, heat recovery steam generators, steam engine boilers for power generation, electric generators, transformers, hydraulic controls for machines, hydraulic torque converters, hydraulic power units, hydraulic pumps, centrifugal pumps, gears, and electric control panels; Installation of capital spare parts for gas and steam turbines; Installation of control systems for rotating equipment; Consulting in the fields of repair and maintenance for power generation equipment and other mechanical drive rotating equipment, including ancillary systems critical to their function, to assist oil and gas facility owners, operators and maintenance providers in improving production performance through use of critical rotating equipment; Maintenance of power generation equipment and maintenance of power generation buildings; Technical support services, namely, technical advice relating to the installation of gas and steam turbines and power generation equipment; Building construction, building maintenance, and construction project management services for businesses in the power plant, oil and gas, industrial, power, and renewable energy industries; Plant construction, maintenance and construction project management services for businesses in the energy production and transmission sectors; Construction services, namely, construction of power plants and portions thereof to assist power plant owners and operators in providing gas turbine, thermal power and/or coal driven solutions; all of the foregoing for the power plant, oil and gas, industrial, power and renewable energy industries | ACTIVE | — |
| 040 | [ Custom manufacture of capital spare parts for gas and steam turbines; Custom manufacture of equipment used to increase power output in gas and steam turbines; Custom manufacture of control systems for rotating equipment; Custom manufacture of gas turbine cleaning solutions; Custom manufacture of auxiliary systems for industrial equipment; Custom manufacture of parts for gas and steam turbines and other rotating and industrial equipment; Custom manufacture of ancillary equipment used in power generation in the nature of electro-mechanical skids, hydraulic skids, gas turbine auxiliary skids, heat recovery steam generators, steam engine boilers for power generation, electric generators, transformers, hydraulic controls for machines, hydraulic torque converters, hydraulic power units, hydraulic pumps, centrifugal pumps, gears, and electric control panels; all of the foregoing for the power plant, oil and gas, industrial, power and renewable energy industries ] | SECTION 8 - CANCELLED | — |
| 041 | Consulting services in the field of training in the operation of power generation equipment and other mechanical drive rotating equipment, including ancillary systems critical to their function, to assist oil and gas facility owners, operators and maintenance providers in improving production performance through use of critical rotating equipment; all of the foregoing for the power plant, oil and gas, industrial, power and renewable energy industries | ACTIVE | — |
| 042 | [ Technology consulting services in the field of operating power generation equipment and other mechanical drive rotating equipment, including ancillary systems critical to their function, to assist oil and gas facility owners, operators and maintenance providers in improving production performance through use of critical rotating equipment; Design and development of capital spare parts for gas and steam turbines; Design and development of equipment used to increase power output in gas and steam turbines; Design and development of control systems for rotating equipment; Design and development of gas turbine cleaning solutions; Design and development of parts, accessories and systems used to optimize efficiency of gas and steam turbine equipment; Design and development of auxiliary systems for industrial equipment; Engineering services to assist power plant owners and operators in providing gas turbine, thermal power and/or coal driven solutions; Engineering services in the field of improving production performance through the use of critical rotating equipment; Design and development of ancillary equipment used in power generation in the nature of electro-mechanical skids, hydraulic skids, gas turbine auxiliary skids, heat recovery steam generators, steam engine boilers for power generation, electric generators, transformers, hydraulic controls for machines, hydraulic torque converters, hydraulic power units, hydraulic pumps, centrifugal pumps, gears, and electric control panels; all of the foregoing for the power plant, oil and gas, industrial, power and renewable energy industries ] | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Ethos Energy Group Limited
- Other trademarks owned by Ethos Energy Group Limited
- Other trademarks owned by Ethos Energy Group Limited
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 041
- Other trademarks in Class 042
- Similar marks named ETHOSENERGY
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 2, 2026 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Apr 2, 2026 | C15P | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Apr 2, 2026 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Apr 2, 2026 | C15P | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Apr 2, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 7, 2026 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Aug 6, 2024 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Aug 6, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 29, 2019 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jun 28, 2019 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jun 27, 2019 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 26, 2019 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jun 26, 2019 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jun 26, 2019 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jun 24, 2019 | IUAF | USE AMENDMENT FILED | — |
| Jun 24, 2019 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jun 24, 2019 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 24, 2019 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Dec 21, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 19, 2018 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Dec 19, 2018 | EXT1 | SOU EXTENSION 1 FILED | — |
| Dec 19, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 10, 2018 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| May 15, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 15, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 25, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 12, 2018 | ALIE | ASSIGNED TO LIE | — |
| Apr 4, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 4, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 4, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 4, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 4, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 3, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 2, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 2, 2018 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Oct 2, 2017 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 2, 2017 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 2, 2017 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 8, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 7, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 7, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 9, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 9, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 9, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 13, 2017 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Jul 20, 2016 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Jan 14, 2016 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Jul 9, 2015 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Jul 3, 2015 | ALIE | ASSIGNED TO LIE | — |
| Dec 8, 2014 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Dec 8, 2014 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Dec 8, 2014 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Nov 14, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 14, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 14, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 14, 2014 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 14, 2014 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 14, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 13, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 23, 2014 | MDSM | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Apr 22, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 11, 2014 | NWAP | NEW APPLICATION ENTERED | — |