Drawing for FUTURE ENERGY SOLUTIONS

USPTO serial 86247144

FUTURE ENERGY SOLUTIONS

Reviewed by CopyMark Law Group

Reg. 5261436Status 710
Filing date
Status date
Registration date
Aug 8, 2017
Examiner
RITTNER, HANNO I
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with FUTURE ENERGY SOLUTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

LILLIAN TAYLOR STAJNBAHER

LILLIAN TAYLOR STAJNBAHER LERNER GREENBERG STEMER LLPPO BOX 2480HOLLYWOOD, FL 33022UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Electronic monitors and monitor modules, namely, meters and sensors that measure lighting, temperature, and motion as parts of lighting apparatus and/or lighting apparatus installations; apparatus and instruments for switching electricity as parts of lighting apparatus and/or lighting apparatus installations, namely, a receptor to record incendent illumination; electric light dimmers; light probes, namely, light meters to a receptor to measure incendent illumination; light boxes, namely, housing for light fixtures; lighting ballasts; parts and fittings for all the aforesaid goods, namely, electrical connectors; electrical lighting transformers and armatures; lighting elements being component parts of electric luminaries, namely, casings and casing parts for electrical equipment, namely, housing for switching apparatus, lighting ballasts, Lighting controls; accessories for lighting fixtures, namely, plastic pole with electrical source in protective cover; electric cables, wires, conductors and connection fittings therefor; filters for lighting apparatus, namely, optical filters and light absorbers being composite materials in repeating patterns that manipulate to impede absorb light wavesSECTION 8 - CANCELLEDMar 23, 2010
011Electric lighting, namely, LED light bulbs, light bulbs, wall lights, induction lighting, solar light fixtures, namely, indoor and outdoor solar powered lighting units and fixtures, solar-powered all-weather lights, lighting tubes, lights for illuminating stairs, doors and other portions of buildings, lights for use in illuminating signs and displays, miniature light bulbs, and outdoor lighting, namely, paver lights; apparatus for lighting, namely, lamps for lighting purposes, electric lighting, namely, LED light bulbs; light bulbs, wall lights; induction lighting; lighting tubes; lights for illuminating stairs, doors and other portions of buildings; miniature light bulbs; light units and fixtures, and lighting apparatus and installations, namely, LED lighting fixtures for indoor and outdoor lighting applications, lighting fixtures; lighting fixtures for use in parking decks and garages; lighting fixtures for use in parking lots and walkways; lighting fixtures that integrate natural daylight and fluorescent lighting into the fixture; lighting fixtures with motion detection; indoor electrical lighting fixtures; outdoor and garden lighting, namely, solar light fixtures, namely, indoor and outdoor solar powered lighting units and fixtures, solar-powered all-weather lights and paver lights; security and emergency lighting apparatus, namely, lighting installations; installations for street lighting; lighting apparatus, namely, lighting installations; lighting fittings, being component parts of and housing for electric luminaries, namely, lamp bases, lamp casings, lamp chimneys, lamp finials, lamp glasses, lamp globes, lamp mantles, lamp reflectors, and lamp shades; display lighting being lighting fixtures for use in displays; lighting tracks; electric track lighting units; lighting louvres for directing light and protecting against glare; decorative lighting, namely, lights for use in illuminating signs and displays, landscape lighting installations, lighting devices for showcases, lighting devices for theatrical productions; lighting panels, namely, lighting panels for light diffusing and flat panel lighting apparatus; light reflectors; florescent lighting tubes and lighting apparatus; incandescent lighting fixtures; infrared lighting fixtures; electric lighting fixtures; bulbs for lighting; filters for lighting apparatus, namely, reflectors and diffusers; light diffusers and light shades; electrical discharge lighting fixtures; flat panel lighting apparatus; arc lamps; induction lamps and induction lighting fixtures; computer controlled lighting instruments and apparatus, namely, lighting installations; lighting devices for showcases and for display purposes, namely, lights for use in illuminating showcases and displays; combined lighting and ultraviolet apparatus and instruments, namely, sanitizing apparatus using ultraviolet light for sanitizing surfaces of objects, not for medical purposes; lighting fixtures for household use, namely, fixtures for incandescent light bulbs and LED (light emitting diode) lighting fixtures; tubes for lighting, namely, lighting tubesSECTION 8 - CANCELLEDMar 23, 2010
037Building construction; installation and repair of building facilities; installation, repair, and maintenance of building equipment, namely, computer hardware, electrical wiring, outlets, light fixtures, and electrical panels; repair, installation and maintenance of lighting apparatus and electrical lighting apparatus, namely, lighting control apparatus and lighting installations; installation of lighting systems; technical consultation in the field of installation of lighting apparatus, lighting instruments and lighting systems; consultation services in the field of construction of environmentally-conscious buildings, namely, energy efficiency in lighting; providing building construction information and information in the field of environmentally-conscious building construction, and in the field of light apparatus and electrical lighting installations in buildings; information and advice relating to all the aforesaid services, also provided on line, from a computer database, from a mobile telephone and by other means of communicationSECTION 8 - CANCELLEDMar 23, 2010
041Rental services in the field of electrical lighting and fixtures for theatrical sets or television studiosSECTION 8 - CANCELLEDMar 23, 2010
042Design of lighting services; information and advice relating to all the aforesaid services; all the aforesaid services also provided on line, from a computer database, from a mobile telephone or by other means of communicationSECTION 8 - CANCELLEDMar 23, 2010

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 23, 2024C8..CANCELLED SEC. 8 (6-YR)—
Aug 8, 2022REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Aug 8, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 6, 2017SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Jul 5, 2017CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Jun 18, 2017SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jun 18, 2017AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
May 19, 2017IUAFUSE AMENDMENT FILED—
May 19, 2017EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Nov 25, 2016EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Nov 23, 2016EX1GSOU EXTENSION 1 GRANTED—
Nov 23, 2016EXT1SOU EXTENSION 1 FILED—
Nov 23, 2016EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
May 24, 2016NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Mar 29, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 29, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 9, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 23, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 22, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 22, 2016XAECEXAMINER'S AMENDMENT ENTERED—
Feb 22, 2016GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 22, 2016GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 22, 2016CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 29, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 29, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 26, 2016NREVNOTICE OF REVIVAL - E-MAILED—
Jan 25, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 25, 2016PETGPETITION TO REVIVE-GRANTED—
Jan 25, 2016PROATEAS PETITION TO REVIVE RECEIVED—
Nov 30, 2015MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Nov 30, 2015ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
May 26, 2015GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
May 26, 2015GNSIINQUIRY TO SUSPENSION E-MAILED—
May 26, 2015CNSISUSPENSION INQUIRY WRITTEN—
Nov 18, 2014GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Nov 18, 2014GNSLLETTER OF SUSPENSION E-MAILED—
Nov 18, 2014CNSLSUSPENSION LETTER WRITTEN—
Oct 30, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 30, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 27, 2014ALIEASSIGNED TO LIE—
Oct 24, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 21, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 21, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 21, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 21, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 21, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 21, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 17, 2014DOCKASSIGNED TO EXAMINER—
Apr 23, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 12, 2014NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance