Drawing for PRSP

USPTO serial 86261625

PRSP

Reviewed by CopyMark Law Group

Reg. 4649023Status 710
Filing date
Status date
Registration date
Dec 2, 2014
Examiner
DAHLING, KRISTIN M
Law office
TMO LAW OFFICE 113

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with PRSP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Howard L. Wernow

Howard L. Wernow SAND, SEBOLT & WERNOW CO., LPA4940 Munson Street NWAegis Tower, Suite 1100CANTON, OH 44718-3615

Goods and services

ClassDescriptionStatusFirst use
006Bars for metal railings; Beams of metal; Bolts of metal; Boxes of common metal; Braces of metal for handling loads; Building wall framing made primarily of metal; Construction elements made of metal, namely, braces; Construction elements made of metal, namely, supports; Handrails of metal; Hardware, namely, metal brackets for general use; Materials of metal for scaffolds; Metal beams; Metal bolts; Metal boxes; Metal braces for handling loads; Metal brackets for use in the construction and assembly of decking; Metal cages for HVAC units; Metal clasps for platform hardware; Metal clip for roof platforms; Metal connectors for decking and decking joists; Metal fastening anchors; Metal flanges; Metal mounting brackets for general use; Metal railings for roof platforms; Metal roofing; Metal scaffolding; Prefabricated metal platforms; Spacer brackets of metal; Steel angles for use in building construction; Steel rails; Steel rods; Structural joint connectors of metal; Structure joint connectors of metal; Transportable metal constructionsSECTION 8 - CANCELLEDJan 28, 2014

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 13, 2025CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Dec 2, 2023REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jan 2, 2021NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jan 2, 2021C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Dec 28, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 1, 2020E815TEAS SECTION 8 & 15 RECEIVED—
Dec 2, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Dec 2, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 16, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 16, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 27, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 7, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 6, 2014DOCKASSIGNED TO EXAMINER—
May 8, 2014MPMKNOTICE OF PSEUDO MARK E-MAILED—
May 7, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 28, 2014NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance