Drawing for LIPP

USPTO serial 86275571

LIPP

Reviewed by CopyMark Law Group

Reg. 4911856Status 800Registered
Filing date
Status date
Registration date
Mar 8, 2016
Examiner
DINALLO, KEVIN M
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with LIPP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Donald S. Showalter

Donald S. Showalter GRAYROBINSON, PA401 East Las Olas Blvd., Suite 1000FORT LAUDERDALE, FL 33301United States

Goods and services

ClassDescriptionStatusFirst use
006Metal building materials, namely, sheets and pipes of metal for silo and container construction, covers of stainless steel for silo installations and bulk containers; goods of common metal, namely, containers, tanks and silos of sheet metal for treatment, storage and conservation of liquids, bulk materials and gases; metal welded and folded tanks and containers for storage of liquids, solids and gases; metal sewage tanks; metal aeration tanks for aeration and storage of liquids, solids and gases; stainless steel tanks for storage of liquids, solids and gases; final storage containers of metal for storage of liquids, solids and gases; filtrate sewage tanks of metal; fermentation residue storage containers of metal; metal containers for storage of gas; grain silos of metal; granular sludge storage tanks of metal; liquid manure storage tanks of metal; hydrolysis storage tanks of metal; sewage sludge tanks of metal; metal storage containers for storage of liquids, manure, biowaste, municipal waste, sludge, waste water and digestate; metal mixing and equalization tanks for liquids, manure, biowaste, municipal waste, sludge, waste water and digestate; post-fermentation tanks of metal for liquids, manure, biowaste, municipal waste, sludge, waste water and digestate; metal process water storage tanks; metal buffer tanks for liquids, manure, biowaste, municipal waste, sludge, waste water and digestate; SBR reactor tanks, namely, sequential batch reactor tanks of metal for use in waste water treatment; metal sludge storage tanks; metal storage tanks; metal industrial water tanks and circulation tanks for industrial and agricultural useACTIVE—
007Machines and machine tools for the forming of materials and silos; machines for operation of silos, namely, excavators, vents, blowers, mixers; machines for construction of silos, namely, silo machines, welding machines, bending machines, double-folding machines; pump machines, namely, pumps for mixing of water, biomass or sludge in tanks and for transport of same between tanks; and agitators for mixing of liquids in tanks for municipal, industrial and agricultural use; over-pressure and under-pressure safety devices for silos, namely, safety systems comprised mainly of pressure monitors and pressure control valves being parts of machinesACTIVE—
011Septic tanks; fermenters, namely, biogas fermentation reactors for producing biogas; biogas plants, namely, biogas production and treatment plants and biogas desulphurization plants; heating equipment for silos, namely, silo heaters for heating of metal storage silosACTIVE—
042Technical consultancy, namely, technical consultancy in the fields of alternative energy generation and the design of biogas plants, fermenters, tanks, silo and container installations for liquids, bulk materials and gases; engineering, namely, engineering services in the field of equipment and processes used for the production, storage and handling of biogas and engineering services for the construction of biogas plants; environmental engineeringACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 9, 2026NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
May 9, 2026RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
May 9, 202689AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
May 9, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 5, 2026E89RTEAS SECTION 8 & 9 RECEIVED—
Mar 8, 2025REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jun 30, 2022NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jun 30, 2022C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jun 30, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 26, 2022E815TEAS SECTION 8 & 15 RECEIVED—
Mar 8, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 29, 2016DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Jan 16, 2016AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Dec 7, 2015IUCNNOTICE OF ALLOWANCE CANCELLED—
Dec 7, 2015D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Jun 9, 2015NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Apr 14, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 25, 2015NPUBNOTICE OF PUBLICATION—
Mar 7, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 6, 2015CNEAEXAMINERS AMENDMENT MAILED—
Mar 5, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 5, 2015XAECEXAMINER'S AMENDMENT ENTERED—
Mar 5, 2015CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 4, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 4, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 25, 2015ALIEASSIGNED TO LIE—
Feb 16, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 25, 2014CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 22, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 22, 2014DOCKASSIGNED TO EXAMINER—
May 21, 2014MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
May 20, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 12, 2014NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance