USPTO serial 86294787
TEST GURU
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Mar 21, 2017
- Examiner
- SABLE, ERIC
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with TEST GURU?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Montréal, Québec, CA
Montréal, Québec, CA
Montréal, Québec, CA
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jori R Fuller
Jori R Fuller MCDONNELL BOEHNEN HULBERT & BERGHOFF LLP300 South Wacker DriveSuite 3200Chicago, IL 60606Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Computer software for building reports, charts, graphs, and digital dashboards; Software to record live radio frequency signals, manage collected data, and analyze, manipulate or play them back for testing analog and digital signals for broadcast and bidirectional radio applications; Computer hardware and software for generating public broadcast standards of radio, video and navigation signals with the ability to record live radio frequency (RF) signals and play them back for use in testing analog and digital radio, video and navigation signal receivers; Computer utility file-storage programs; Computer software for database management; Test instruments for RF device manufacturers to generate, record and play back radio, video, RF and navigation signals, ensuring complete test coverage for RF products; Embedded software and communication hardware to assist telecommunications equipment manufacturers with Internet Protocol (IP) applications that use RF, audio and video; Automated test equipment (ATE) comprising computers, software, power supplies, test instruments, data acquisition modules, wiring, fixtures, and other components required for accurately testing any or all functionality of a newly manufactured electronic product, or for testing, diagnosing and troubleshooting used or defective electronic products for repair centers and return merchandise authorization (RMA) processors; Computer software programs for managing product-manufacturing information that allows product designers and manufacturers to author, manage, report, react to and improve test activities, supply-chain and assembly activities, quality control, and communications, covering one or all stages of the product lifecycle, from product design and validation through manufacturing and repair/returns screening | SECTION 8 - CANCELLED | — |
| 035 | Test-data project management services, for electronic product manufacturing companies to collect, store, retrieve and analyze their test, quality, process, or operations data for business purposes | SECTION 8 - CANCELLED | — |
| 040 | Build-to-print manufacturing and assembly services of test equipment and test stations used for product validation, manufacturing, and repair/returns screening activities | SECTION 8 - CANCELLED | — |
| 041 | Training in the use of designed or manufactured test systems, test components, or test software, including test-data management software | SECTION 8 - CANCELLED | — |
| 042 | Manufacturing test system services, namely, the development of test engineering platforms that comprise hardware, firmware and software, allowing manufacturers to author, manage, report, react to and improve manufacturing test activities, assembly activities and communications, covering one or all stages of the product lifecycle, from product design and validation through manufacturing and repair/returns screening; Development of a computer software platform that allows manufacturers of products to author, manage, report, react to and improve test activities, assembly activities and communications, covering one or all stages of the product lifecycle, from product design and validation through manufacturing and repair/returns screening; The design and development of real-time interconnection adapters that allow system designers to create multi-computer systems without bus or cabling topology restrictions; Test engineering services, namely, designing test systems used in the development and testing of real-time embedded systems and measurement systems; computer software system architecture design; software development; system engineering; test automation, namely, designing test systems or software to automate test processes; technical verification and validation of manufactured systems or products; computer software and interface design; design and development of fixtures, thermal chambers, vibration tables, robotics, controllers and other hardware and systems essential for product testing; development of software that remotely manages the collection, transfer, storage, retrieval, and analysis of a customer's manufacturing test and supply-chain data | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by AVERNA TECHNOLOGIES INC.
- Other trademarks owned by AVERNA TECHNOLOGIES INC.
- Other trademarks owned by AVERNA TECHNOLOGIES INC.
- Other trademarks in Class 009
- Other trademarks in Class 035
- Other trademarks in Class 040
- Other trademarks in Class 041
- Other trademarks in Class 042
- Similar marks named TEST GURU
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 6, 2023 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Mar 21, 2022 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Mar 21, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 3, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 3, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 14, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 29, 2016 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 22, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 22, 2016 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 22, 2016 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 22, 2016 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 22, 2016 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 21, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 21, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 10, 2016 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| May 30, 2016 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| May 30, 2016 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| May 30, 2016 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Nov 30, 2015 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Nov 30, 2015 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Nov 30, 2015 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Nov 30, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 30, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 23, 2015 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Oct 5, 2015 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Oct 5, 2015 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Oct 5, 2015 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Oct 5, 2015 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Mar 12, 2015 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Mar 12, 2015 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Mar 12, 2015 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Mar 12, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 12, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 12, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 12, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 12, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 12, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 5, 2015 | ALIE | ASSIGNED TO LIE | — |
| Feb 25, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 17, 2015 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 17, 2015 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 17, 2014 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 17, 2014 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 17, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 11, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 12, 2014 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Jun 11, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 2, 2014 | NWAP | NEW APPLICATION ENTERED | — |