USPTO serial 86295754
M
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 13, 2016
- Examiner
- REEVES, APRIL ELIZABETH
- Law office
- —
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with M?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*
Plus Government fees of $1,950
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Highland Park, IL, US
Highland Park, IL, US
Highland Park, IL, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Seth I. Appel
Seth I. Appel PATTISHALL MCAULIFFE NEWBURY HILLIARD & GERALDSON125 S. Wacker DriveCHICAGO, IL 60606-4450United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | After-market components for motor vehicle engine cooling radiators, namely, radiator caps, charged air coolers, fan clutch solenoid and magnetic solenoid and surge tanks; After-market components for land vehicle engines, namely, water pumps | ACTIVE | Mar 24, 2014 |
| 009 | [ After-market electrical turn signal switches and brake light switches for vehicle electrical systems ] | SECTION 8 - CANCELLED | Mar 24, 2014 |
| 011 | After-market parts for land vehicles, namely, headlights; after-market components for HVAC units for land vehicles, namely, condensers, blower motors, compressors and valves | ACTIVE | Mar 24, 2014 |
| 012 | Automotive after-market components, namely, headlight bezels, door handles, hoods, hood latches, hood tie-down cables, windshield wiper arms, windshield washer nozzles, grills, bumpers, pedal pads, window motors, and fuel caps; After-market components for braking systems for land vehicles, namely, automatic slack adjustors, hub cap plugs, spring brakes, oil caps, service chambers, piggyback kits for brake chambers, gaskets for sealing components, vent plugs, valves and valve kits for air brakes, knobs for air brakes, pins, mounting brackets, and air dryers air brakes; After-market components for steering units and suspension systems for land vehicles, namely, valves, power steering pumps, spring pins, engine mounts, drag links, front engine isolators, bushings, latches, suspension kits for suspension systems, torque rods and assemblies for rear suspension and trailer components, air springs for rear suspension, lift axle, and trailer suspension ride components, shackles rear suspension components, and tie rods; After-market clutch mechanisms and transmission mechanisms for land vehicles, namely, clutch adjusters, clutch rod assembly, shafts, transmission boots, clutch brakes, shift knobs, shift control valves, and isolator kits; After-market trailer components, namely, couplings for connecting tractor power and air to trailers, air coils for connecting tractor air to trailer brakes, ABS brake cables, connectors plugs, and sockets | ACTIVE | Mar 24, 2014 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Shem, LLC
- Other trademarks owned by Shem, LLC
- Other trademarks owned by Shem, LLC
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 012
- Similar marks named M
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 19, 2026 | NP89 | NOTICE OF ACCEPTANCE OF PARTIAL SEC. 8 & 9 EMAILED | — |
| Mar 19, 2026 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Mar 19, 2026 | 9G8P | REGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8 | — |
| Mar 19, 2026 | 8PRT | REGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED | — |
| Mar 19, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 5, 2026 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Dec 13, 2025 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Aug 25, 2023 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Aug 25, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 25, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 25, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 25, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Aug 25, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Apr 22, 2023 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Apr 22, 2023 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Apr 21, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 12, 2022 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Dec 13, 2021 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Dec 13, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 8, 2016 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Nov 7, 2016 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Oct 25, 2016 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Oct 13, 2016 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Sep 26, 2016 | IUAF | USE AMENDMENT FILED | — |
| Sep 26, 2016 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| May 24, 2016 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 29, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 29, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 9, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 26, 2016 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jan 7, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 6, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 5, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 5, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 6, 2015 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 6, 2015 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 6, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 10, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 9, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 9, 2015 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Apr 8, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 9, 2014 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Dec 9, 2014 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 9, 2014 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 18, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 17, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 17, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 16, 2014 | GPRN | NOTIFICATION OF PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Sep 16, 2014 | GPRA | PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Sep 16, 2014 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Sep 12, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 12, 2014 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Jun 11, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 3, 2014 | NWAP | NEW APPLICATION ENTERED | — |