Drawing for Serial No. 86301791

USPTO serial 86301791

Serial No. 86301791

Reviewed by CopyMark Law Group

Reg. 4771552Status 710
Filing date
Status date
Registration date
Jul 14, 2015
Examiner
CARLSEN, EMILY K
Law office
TMEG LAW OFFICE 103

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with Serial No. 86301791?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Todd A. Denys

Todd A. Denys PORZIO, BROMBERG & NEWMAN, P.C.600 Alexander Road, Suite 2-1PRINCETON, NJ 08540UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Construction of offshore drilling platforms, mooring systems, jetties, quays, off-load onshore facilities, on-load onshore facilities, subsea-structures and modules and parts for all the foregoing in the field of the offshore oil, gas and energy industry; repair of offshore drilling platforms, mooring systems, jetties, quays, off-load onshore facilities, on-load onshore facilities, subsea-structures and modules and parts for all the foregoing; offshore drilling installations in the field of the offshore oil, gas and energy industry; installation of offshore drilling platforms, mooring systems, jetties, quays, off-load onshore facilities, on-load onshore facilities, subsea-structures and modules and parts for all the foregoing in the field of the offshore oil, gas and energy industry; consultation and information on aforementioned services; advice and planning advice regarding the building, construction, installation, and repair of equipment and installations for the shipping and offshore industry at on/off shore locations on and below sea level the water, ships, floating shipping and offshore material, pipe lines, steel constructions and other civil technical and shipbuilding constructions, industrial installations and machines, or constructions for use in the energy industrySECTION 8 - CANCELLEDJan 1, 1999
039Maritime transport, namely, freight ship transport, heavy lift ship transport, barge transport; ship, barge and heavy lift transport services, including in the field of the offshore oil, gas and energy industry; maritime transport, namely, per ship, heavy lift ship or barge of ships, yachts, submarines, rolling stock, dry docks, cranes, dredging installations, parts of drilling and oil platforms, parts for refineries and the petrochemical industry, parts in the field of dock construction, parts in the field of energy industry; supply chain logistics services, namely, storage, transportation and delivery of goods for others by ship, barge or truck and consultation in the field of maritime transport; shipping of goods, project cargo, general cargo; chartering of ships, lifting cranes and floating offshore material in the context of maritime transport and storage; consultation and information on the aforementioned servicesSECTION 8 - CANCELLEDJan 1, 1999
042Engineering; engineering design for building, installation, construction and repair of apparatus and installations for the shipping and offshore industry, at onshore and offshore locations on and under the water, ships, floating shipping and offshore material, pipe lines, steel constructions and other civil technical and shipbuilding constructions, industrial installations and machines, constructions for use in the energy industry; scientific and industrial research in the field of oil, gas and energy industries, and technical studies, namely, conducting of feasibility studies in the field of new technologies as they relate to the oil, gas and energy industry; technical designs, namely, engineering design in the field of shipping and offshore industry; technical project studies, namely, conducting of feasibility studies in the field of new technologies as they relate to transport and storage of materials as well as in the field of engineering, design and planning for the building, construction and repair of apparatus and installations at onshore and offshore locations, both on and under water, ships, floating shipping and offshore material, pipe lines, steel constructions and other civil technical and shipbuilding constructions and industrial installations and machinesSECTION 8 - CANCELLEDJan 1, 1999

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 30, 2026CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Jul 14, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Dec 3, 2021NAS8NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED—
Dec 3, 20218.OKREGISTERED - SEC. 8 (6-YR) ACCEPTEDThe USPTO accepted your Section 8 declaration showing the mark is still in use in commerce (or excusable nonuse). This satisfies the six-year maintenance requirement and keeps the registration active until the next renewal deadline.
Dec 3, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 14, 2021ES8RTEAS SECTION 8 RECEIVED—
Jul 14, 2020REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jul 14, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 28, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 28, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 8, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 20, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 18, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 25, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 25, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 13, 2015ALIEASSIGNED TO LIE—
Feb 6, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 6, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 6, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 6, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 6, 2014DOCKASSIGNED TO EXAMINER—
Jun 19, 2014MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jun 18, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 9, 2014NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance