Drawing for ENGATHER

USPTO serial 86321504

ENGATHER

Reviewed by CopyMark Law Group

Reg. 4930090Status 705Registered
Filing date
Status date
Registration date
Apr 5, 2016
Examiner
MCMORROW, RONALD G
Law office
—

What this means

Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights. Track next renewal deadlines in TSDR and WIPO records.

Status 705: Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights.

Need help with ENGATHER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Bryant E. Wade/Jessica S. Sachs

Bryant E. Wade/Jessica S. Sachs Harness, Dickey & Pierce, P.L.C.5445 Corporate DriveSuite 200Troy, MI 48098

Goods and services

ClassDescriptionStatusFirst use
009Computer software and programs for optimally managing, operating, and forecasting energy for buildings such as electric power, heat, and gas; [ Factory automation control machines and instruments, namely, industrial automation controls; ] Electricity transformers; [ Distributed Control Systems (DCS) comprised primarily of industrial automation controls, and industrial process control software; ] Computer software and programs for acquisition of data for energy consumption; Computer software and programs for optimal control of energy consumption; Remote electric meter reading machines and instruments, namely, electric meters and communication modules for measuring electric energy consumption from a remote location; Remote controlled telemetering machines and apparatuses; Electricity inverters; Electric power monitoring and controlling machines and instruments, namely, electronic monitors and monitor modules for monitoring electric current and electric signals; Electricity meters; Electric power converters; Computer software and programs for managing electric power loads; Electric power storage devices, namely, rechargeable batteries; [ Supervisory Control And Data Acquisition Systems (SCADA) comprised primarily of industrial automation controls, industrial process control software; ] Machines and instruments for controlling maximum electric power demands, namely, electronic controllers used to reduce power consumption; [ Computers; ] Control devices for electricity accumulated by electric power systems, solar power, and wind power; [ Programmable Logic Controllers (PLC); ] Circuit closers; Computer software and programs for the maintenance of systems for conserving energy for buildings such as electric power, heat, and gas; Computer software and programs for controlling and maintaining optimal production of energy such as electric power, heat, and gas; Computer software and programs for systems relating to comprehensive protection, control, and operation of electric power; Computer software and programs for managing and operating electric power storage devices; Computer software and programs for monitoring and controlling electric power systemsACTIVE—
035Consulting services in the field of energy usage management and energy efficiency relating to the use of electric power, heat, and gas in buildings; Professional consulting services relating to efficiency of energy for buildings including electric power, heat, and gas; Advisory services relating to efficiency of energy such as electric power, heat, and gasACTIVE—
039[ Utility services, namely, electric power grid load shifting ]SECTION 8 - CANCELLED—
042[ Measurement of environments within buildings, namely, measurement and verification of carbon dioxide and other greenhouse gas emission offsets; ] Remote monitoring of building installations, namely, generators, heating, air-conditioning, and ventilation apparatuses; Maintenance of computer software systems for conserving energy for buildings including electric power, heat, and gas; Development of software for use in optimally managing, operating and forecasting energy for buildings; [ Development of data processing programs by order of third parties; ] Diagnostic services in the field of systems for conserving energy for buildings such as electric power, heat, and gas; Monitoring services of energy producing systems for others for optimizing production of energy such as electric power, heat, and gas; Development of computer software systems relating to acquisition of data of energy consumption and optimal control of energy such as electric power, heat, and gas; Design and implementation of software systems relating to acquisition of data of energy consumption; Remote electric, heat, and gas meter reading services; [ Monitoring of computer systems by remote access to ensure proper functioning; ] Development of software for systems relating to comprehensive protection, control, and operation of electric power; Design and implementation of software systems relating to comprehensive protection, control and operation of electric power; Quality control for others in the field of electric power; [ Maintenance of computer software; ] Monitoring of electric power storage devices, namely, rechargeable batteries, for others to ensure proper functioning; Metering and monitoring electric power consumption by third parties for electric power providersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 5, 2025REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jul 5, 2022NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jul 5, 2022C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jun 30, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 26, 2022E815TEAS SECTION 8 & 15 RECEIVED—
Apr 5, 2021REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Apr 5, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 25, 2016DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Feb 20, 2016AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jan 20, 2016IUCNNOTICE OF ALLOWANCE CANCELLED—
Jan 20, 2016D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Jul 28, 2015NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jun 2, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 2, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 13, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 27, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 20, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 16, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 16, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 13, 2015ALIEASSIGNED TO LIE—
Apr 7, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 8, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 8, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 8, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 5, 2014DOCKASSIGNED TO EXAMINER—
Jul 2, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 30, 2014NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance