Drawing for CONTROLNET

USPTO serial 86340948

CONTROLNET

Reviewed by CopyMark Law Group

Reg. 5064713Status 800Renewal
Filing date
Status date
Registration date
Oct 18, 2016
Examiner
STRINGER, DANIEL
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with CONTROLNET?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $548*

Plus Government fees of $1,300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Devon E. White

Devon E. White Wyrick Robbins Yates & Ponton LLP4101 Lake Boone TrailSuite 300Raleigh, NC 27607

Goods and services

ClassDescriptionStatusFirst use
009Industrial automation protocol and network system that allows interoperable communication between devices, comprised of limit switches, photoelectric cells, automatic valves for manifolds, pneumatic valve actuators, motor starters, drives for motors, programmable logic controller and interfaces for computers, software development tools, sold as a unit, for communication for control, motion, synchronization, safety, energy and network management for electronic devices, electronic actuators, electric cables, Communication adapters and gateways in the nature of computer hardware, power controllers, electric connectors, human machine interfaces in the nature of electronic display interfaces, Energy measurement and management systems comprised of electric sensors and electric control devices for energy management, Feedback devices in the nature of in the nature of temperature, position, speed, tension sensors, Flow controllers in the nature of electrical controllers, Input/Output modules in the nature of integrated circuit modules, Light stacks and strobes, namely, electric warning lights, electric meters, Motion control systems comprised of motion detectors and electronic motion sensitive switches, Motor drives, Motor starters, network infrastructure devices, namely, physical media, namely, electrical cables and connectors, network power supplies and computer network hubs, and network gateways and routers, Optical scanners, Power Supplies, Controlled volume pumps, electrical controllers for robots, electrical controllers for safety devices and safety control systems, electric sensors, computer operating software, Day and night vision systems primarily comprising day and night sensors, day and night cameras, power sources, communication means, monitors and operating software; Industrial automation network components compliant with industrial automation network protocol, namely, limit switches, photoelectric cells, automatic valves for manifolds, software development tools for communication for control, motion, synchronization, safety, energy and network management for electronic devices, namely, electronic actuators, electric cables, Communication adapters and gateways in the nature of computer hardware, power controllers, electric connectors, human machine interfaces in the nature of electronic display interfaces, Energy measurement and management systems comprised of electric sensors and electric control devices for energy management, Feedback devices in the nature of in the nature of temperature, position, speed, tension sensors, Flow controllers in the nature of electrical controllers, Input/Output modules in the nature of integrated circuit modules, Light stacks and strobes, namely, electric warning lights, electric meters, Motion control systems comprised of motion detectors and electronic motion sensitive switches, Motor drives, Motor starters, network infrastructure devices, namely, physical media, namely, electrical cables and connectors, network power supplies and computer network hubs, and network gateways and routers, Optical scanners, Power Supplies, Controlled volume pumps, electrical controllers for robots, electrical controllers for safety devices and safety control systems, electric sensors, computer operating software, Day and night vision systems primarily comprising day and night sensors, day and night cameras, power sources, communication means, monitors and operating software; Software, namely, software with development, testing, and training tools for industrial automation and associated networks thereforACTIVE
035Subscription services, namely, providing updated electronic publications in the nature of manuals, instructional guides and reference guides detailing specifications for various industrial automation protocols and network technologiesACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 13, 2026NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED
Apr 13, 2026RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Apr 13, 202689AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Apr 6, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jan 28, 2026E89RTEAS SECTION 8 & 9 RECEIVED
Oct 18, 2025REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Jan 10, 2023NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Jan 10, 2023C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Jan 10, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jun 24, 2022E815TEAS SECTION 8 & 15 RECEIVED
Oct 18, 2021REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Oct 18, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 15, 2016SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
Sep 14, 2016CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
Sep 13, 2016EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Sep 12, 2016SUPCSTATEMENT OF USE PROCESSING COMPLETE
Sep 12, 2016EX2GSOU EXTENSION 2 GRANTED
Sep 12, 2016AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL
Aug 18, 2016IUAFUSE AMENDMENT FILED
Aug 18, 2016EXT2SOU EXTENSION 2 FILED
Aug 18, 2016EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Aug 18, 2016EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Feb 6, 2016EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Feb 4, 2016EX1GSOU EXTENSION 1 GRANTED
Feb 4, 2016EXT1SOU EXTENSION 1 FILED
Feb 4, 2016EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Aug 18, 2015NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jun 23, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jun 23, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 3, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
May 18, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
May 13, 2015ALIEASSIGNED TO LIE
Apr 22, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Apr 22, 2015XAECEXAMINER'S AMENDMENT ENTERED
Apr 22, 2015GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Apr 22, 2015GNEAEXAMINERS AMENDMENT E-MAILED
Apr 22, 2015CNEAEXAMINERS AMENDMENT -WRITTEN
Apr 13, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Apr 13, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 13, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 5, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 5, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Oct 30, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 30, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 30, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 27, 2014DOCKASSIGNED TO EXAMINER
Aug 21, 2014TAEATEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED
Aug 21, 2014PARITEAS VOLUNTARY AMENDMENT RECEIVED
Aug 1, 2014MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED
Jul 31, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jul 22, 2014NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance