USPTO serial 86346583
EBERL IRON WORKS, INC.
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Nov 17, 2015
- Examiner
- KERTGATE, AMY L
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
Need help with EBERL IRON WORKS, INC.?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Buffalo, NY, US
Buffalo, NY, US
Buffalo, NY, US
Buffalo, NY, US
Buffalo, NY, US
Buffalo, NY, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
David L. Principe
David L. Principe PHILLIPS LYTLE LLP125 Main StreetOne CanalsideBUFFALO, NY 14203-2887Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | rooftop duct supports in the nature of metal duct supports; rooftop solar supports in the nature of solar panel mounts made of metal; rooftop sleepers and standoffs in the nature of metal structures for mounting piping and ductwork; HVAC equipment supports in the nature of metal construction elements, namely, metal HVAC equipment supports; crossover bridges and walkways in the nature of stationary prefabricated metal bridges and walkways, rooftop seismic supports of metal for supporting piping, HVAC ducts, and cable trays; construction elements of metal, namely, rooftop cable tray supports of metal; metal sign posts, non-luminous and non-mechanical aluminum signs; non-luminous and non-mechanical roll-up signs; sign stands in the nature of metal holders for signs; guardrail barriers in the nature of metal guard barriers for highway use and crash barriers of metal; metal framing in the nature of building wall framing made primarily of metal; metal pipe clamps; metal safety grating; metal building materials, namely, prefabricated commercial storage mezzanines; rooftop safety walkways in the nature of metal building materials, namely, stationary prefabricated metal walkways and metal ceiling grids | ACTIVE | Dec 31, 1979 |
| 009 | traffic control devices, namely, safety traffic cones; lighting for traffic control, namely, electric warning lights and work zone lights in the nature of emergency warning lights, flashing and steady safety lights, and luminous beacons for safety or warning purposes; safety markers, namely, reflective fire hydrant markers in the nature of collars and shafts attached to hydrants or mounted in the ground near hydrants to indicate the position of hydrants that may be covered by snow or seasonal vegetation overgrowth; safety clothing in the nature of reflective and illuminated clothing for safety purposes | ACTIVE | Dec 31, 1979 |
| 037 | installation of medical equipment, namely, X-ray equipment, surgical lights, CT machines and medical cabinets | ACTIVE | Dec 31, 1979 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Eberl Iron Works, Inc.
- Other trademarks owned by Eberl Iron Works, Inc.
- Other trademarks owned by Eberl Iron Works, Inc.
- Other trademarks owned by Eberl Iron Works, Inc.
- Other trademarks owned by Eberl Iron Works, Inc.
- Other trademarks owned by Eberl Iron Works, Inc.
- Other trademarks in Class 006
- Other trademarks in Class 009
- Other trademarks in Class 037
- Similar marks named EBERL IRON WORKS, INC.
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 20, 2026 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Jul 20, 2026 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Jul 20, 2026 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Jul 20, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 18, 2026 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Nov 18, 2024 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Jun 1, 2023 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jun 1, 2023 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| May 30, 2023 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| May 30, 2023 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Nov 28, 2022 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Nov 28, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 17, 2022 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Nov 17, 2020 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Nov 17, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 1, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 1, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 12, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 28, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 27, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 27, 2015 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jul 14, 2015 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jun 30, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 30, 2015 | ALIE | ASSIGNED TO LIE | — |
| Jun 12, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 11, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 11, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 11, 2015 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jun 2, 2015 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jun 2, 2015 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 2, 2015 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 12, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 11, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 11, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 10, 2014 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 10, 2014 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 10, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 31, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 1, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |