Drawing for LEC

USPTO serial 86356502

LEC

Reviewed by CopyMark Law Group

Reg. 4746686Status 800Registered
Filing date
Status date
Registration date
Jun 2, 2015
Examiner
BENMAMAN, ALICE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with LEC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Manuel R. Valcarcel

Manuel R. Valcarcel Greenberg Traurig, P.A.333 S.E. 2nd Avenue, 44th FloorMiami, FL 33131United States

Goods and services

ClassDescriptionStatusFirst use
037Building construction; Building construction and repair; Building construction information; Building construction services; Building construction supervision; Building construction, remodeling and repair; Building inspection; Construction and renovation of buildings; Construction and repair of buildings; Construction consultancy; Construction consultation; Construction management; Construction of airports; Construction of buildings; Construction of facilities, structures, living quarters, and utility buildings, production modules and subsea modules in the oil and gas industry; Construction of structures for the production of crude oil; Construction of structures for the production of natural gas; Construction of structures for the storage of crude oil; Construction of structures for the storage of natural gas; Construction of aviation, energy, industrial and agro-industrial structures.; Construction planning; Construction project management services; Construction project management services in the field of construction of offshore oil and gas facilities; Construction project management services in the field of construction of renewable energy and energy generation equipment support structures and ancillary structures for supporting meteorological data gathering equipment; Construction services, namely, installation of environmental containment systems; Construction services, namely, planning, laying out and custom construction of commercial buildings; Construction supervision; Construction, maintenance and renovation of property; Construction, maintenance, and construction project management services in oil and gas fields; Consultation in building construction supervision; Consultation services in the field of construction of environmentally-conscious buildings; Consulting in the field of building construction; Consulting services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Consulting services in the field of construction of wind energy facilities; Consulting services in the field of offshore oil and gas facility construction; Custom construction and building renovation; Factory construction; General construction contracting; Hydro-electric factory construction; Plant construction, maintenance and construction project management services for businesses in the energy production and transmission sector; Steel structure construction works; Technical consultation in the field of building constructionACTIVEJan 1, 1995
042Architectural and engineering services; Architectural design; Architectural design in the field of aviation, energy, industrial and agro-industrial facilities.; Civil engineering; Civil engineering for the design of aviation, energy, industrial and agro-industrial industries.; Consulting in the field of designing aviation, energy, industrial and agro-industrial structures.; Consulting in the field of engineering; Consulting in the field of structural engineering; Consulting in the field of aviation, energy, industrial and agro-industrial design; Consulting in the field of structural, mechanical and civil engineering; Consulting in the fields of engineering and architecture; Consulting services for others in the field of design, planning, and implementation project management of aviation, energy, industrial and agro-industrial structures.; Consulting services in the field of architectural design; Custom design and engineering of aviation, energy, industrial and agro-industrial structures.; Design of factory buildings; Design of production facilities; Drafting of plans and engineering drawings for others; Engineering; Engineering design services; Engineering drawing services; Engineering services for building and property condition assessment; Engineering services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Engineering services in the field of energy efficiency; Engineering services in the field of environmental compliance; Engineering services in the field of reduction of operating costs, fuel blending, waste handling, quality performance of co-products and by-products, and chemical distribution; Engineering services in the field of aviation, energy, industrial and agro-industrial-related industries.; Engineering services, namely, engineering for the design and construction of aviation, energy, industrial and agro-industrial structures; Hydraulic and hydrologic engineering services, namely, design of aviation, energy, industrial and agro-industrial facilities.; Hydraulic engineering and design; Industrial design; Industrial design services; Planning and design of aviation, energy, industrial and agro-industrial facilities.; Structural engineering design services; Testing or research on civil engineeringACTIVEJan 1, 1995

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 11, 2024ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Nov 22, 2024NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Nov 22, 2024RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Nov 22, 202489AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Nov 22, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 22, 2024E89RTEAS SECTION 8 & 9 RECEIVED—
Jun 2, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Sep 24, 2021NAS8NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED—
Sep 24, 20218.OKREGISTERED - SEC. 8 (6-YR) ACCEPTEDThe USPTO accepted your Section 8 declaration showing the mark is still in use in commerce (or excusable nonuse). This satisfies the six-year maintenance requirement and keeps the registration active until the next renewal deadline.
Sep 24, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 20, 2021ES8RTEAS SECTION 8 RECEIVED—
Jun 2, 2020REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jul 10, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 10, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 29, 2017ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jun 2, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 17, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 17, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 25, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 6, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 6, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 5, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 5, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 2, 2015ALIEASSIGNED TO LIE—
Jan 22, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 18, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 18, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 18, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 18, 2014DOCKASSIGNED TO EXAMINER—
Aug 13, 2014MPMKNOTICE OF PSEUDO MARK E-MAILED—
Aug 12, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 7, 2014NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance