USPTO serial 86428780
PHASORINTELLIGENCE
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- CROWLEY, PAUL
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with PHASORINTELLIGENCE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
92907 La Défense Cedex, FR
92907 La Défense Cedex, FR
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
William C. Wright
WILLIAM C. WRIGHT EPSTEIN DRANGEL LLP60 E 42ND ST STE 2410NEW YORK, NY 10165-0011UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Computers; computer hardware; data processing equipment for use in the field of power generation, power transmission, power distribution, power management, power generation surveillance, power generation data analysis, data mining, data control and electronic data reporting; diagnostic apparatus for monitoring electricity, water and gas; computer hardware, computer firmware and computer software for analyzing, surveying, monitoring and measuring, controlling, managing, and data reporting in the fields of power generation and power transmission; telemetry systems, namely, remote control telemetering machines for monitoring electricity, water and gas; diagnostic apparatus for testing electrical currents in the fields of power generation, power transmission, power distribution, power measurement; computer software used for online condition monitoring and surveillance, data mining, and intelligent data analysis and reporting, in the fields of power generating equipment and systems and scientific data processing equipment and systems; prerecorded magnetic data carriers featuring computer software for online condition monitoring and surveillance, data mining, and intelligent data analysis and reporting, in the fields of power generating equipment and systems and scientific data processing equipment and systems; automated process control systems, namely, computer hardware and computer software used to monitor power generation and power transmission; data processing apparatus; structural replacement parts for the aforementioned goods | ACTIVE | — |
| 037 | Installation of computer hardware | ACTIVE | — |
| 042 | Scientific and technological services in the field of power generation and research and design relating thereto, namely, research and design of power generation installations; industrial analysis and research services in the field of power generation; design, install, and develop computer software in the field of power generation; design and development of computer hardware for use in the field of power generation; computer services, namely, remote and on-site management of the software applications of others; engineering services; technological research and technological consultation services in the technological field of the design of electricity power systems and the design of information technology systems of electricity power systems, all in relation to utilities; technological research services in the fields of electricity, water and gas generation, transmission, distribution, measurement, analysis and control of electricity, water and gas generation systems; technological consultancy services in the field of electricity power system performance assessment, adjustment, monitoring, measurement and optimization to maintain or improve efficiency; design services for others in the field of electricity power stations; information, advisory and consultation services in relation to the design and development of computer hardware, computer software, and electricity power stations; design and development of computer software and computer hardware for digital signal processing services | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by ALSTOM Grid SAS
- Other trademarks owned by ALSTOM Grid SAS
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named PHASORINTELLIGENCE
- Prosecution event MAB6 explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 2, 2017 | MAB6 | ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Oct 2, 2017 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Feb 14, 2017 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 12, 2017 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Feb 12, 2017 | EXT2 | SOU EXTENSION 2 FILED | — |
| Feb 12, 2017 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 24, 2016 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 22, 2016 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Aug 22, 2016 | EXT1 | SOU EXTENSION 1 FILED | — |
| Aug 22, 2016 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 1, 2016 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jan 5, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 5, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 16, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 2, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 24, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 24, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 24, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 24, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 24, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 29, 2015 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jun 29, 2015 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jun 29, 2015 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jun 29, 2015 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jun 29, 2015 | PBMR | WITHDRAWN FROM PUB - MANAGING ATTORNEY REQUEST | — |
| Jun 26, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 25, 2015 | ALIE | ASSIGNED TO LIE | — |
| Jun 9, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 9, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 9, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 9, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 9, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 21, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 20, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 20, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 4, 2014 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 4, 2014 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 4, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 1, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 27, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 23, 2014 | NWAP | NEW APPLICATION ENTERED | — |