Drawing for BABCOCKPOWER

USPTO serial 86436749

BABCOCKPOWER

Reviewed by CopyMark Law Group

Reg. 4916776Status 800Registered
Filing date
Status date
Registration date
Mar 15, 2016
Examiner
DE JONGE, KATHLEEN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with BABCOCKPOWER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

David W. Nagle, Jr.

David W. Nagle, Jr. Stites & Harbison, PLLC400 West Market St.Suite 1800Louisville, KY 40202

Goods and services

ClassDescriptionStatusFirst use
035Temporary personnel services, namely, providing supplemental manpower to the nuclear and fossil generation, petrochemical and pulp and paper industry markets; Providing direct-hire construction personnel placement for new and existing plantsACTIVEJun 7, 2011
037Providing installation, maintenance and repair of flue gas desulfurization systems for power generation and industrial processes; Providing fully integrated environmental solutions, namely, installation and maintenance of environmental containment systems for utility power plants, waste-to-energy facilities and large industrial applications; Providing installation and maintenance of dual loop wet flue gas desulfurization systems; Mercury removal from coal-fired power plants; Mercury emissions control services, namely, installation of mercury emissions control plants; Providing multi-pollutant air quality control systems for power generation and industrial processes, namely, construction and installation of air quality control plants and providing technical advice concerning the repair and maintenance of air quality control plants; Providing regenerative selective catalytic reduction systems for industrial facilities and power plants, namely, installation of regenerative selective catalytic reduction systems for industrial facilities and power plants; Providing regenerative selective catalytic reduction systems for industrial facilities and power plants, namely, maintenance and field repair services; Providing fully integrated environmental solutions for utility power plants, waste-to-energy facilities and large industrial applications, namely, installation and maintenance of environmental containment systems; Providing installation services of single loop wet flue gas desulfurization systems; Providing waste removal in the nature of desulfurization reduction and removal of other acid gas emissions from power plants and industrial facilities utilizing either wet or dry technology; Providing dry scrubbing technology services to power plants and industrial facilities, namely, installation and maintenance of air scrubbers in power plants and industrial facilities; Installation of upgrades to existing emission removal systems in large industrial systems; Providing integrated and field services, namely, providing integrated maintenance and field repair of scrubbers for air pollution control for power generation and industrial processes; Providing selective catalytic reduction technology management and performance services, namely, maintenance and repair of catalytic reduction plants for utility and waste-to-energy systems; Providing technological services, namely, installation, maintenance and repair to upgrade and maintain steam generating plants; Providing on-site construction of structures, installation, repair, and alteration, namely, machinery conversion and retrofitting and maintenance of boilers and boiler-related equipment maintenance and repair services; Providing construction project management services in the field of replacement pressure parts for boilers; Providing field maintenance and repair and retrofitting services for heat recovery steam generators; Providing construction services, namely, construction of structures and installation of heat exchangers and condensers; Repair and maintenance of heat exchangers and condensers; Providing turnkey solutions, namely, installation with field maintenance and repair services and site installation of heat exchangers and condensers; Providing field machining namely, refurbishing of boilers, environmental control systems, tanks, turbines, pumps, interconnecting piping, valves, and fittings in power plants and industrial process facilities; construction services for new and existing plants using direct-hire personnel; Providing on-site installation, machinery retrofit and conversion repair and maintenance of any OEM boilers and boiler related equipment; Providing construction project management services; Providing technical advisory and consulting services about the installation, repair and maintenance of regenerative selective reduction systems for industrial facilities and power plantsACTIVEJun 7, 2011
040Providing technological services, namely, custom fabrication to upgrade and maintain steam generating plants; Providing fabrication for others of boilers and boiler-related equipment; Providing manufacturing services for others in the field of replacement pressure parts for boilers; Resurfacing of vertical spindle mill pulverizer grinding roll and table services and other fuel processing and transport equipment; Providing manufacturing services for others of heat recovery steam generators and aftermarket related services, namely, manufacturing of replacement parts and components for heat recovery steam generators; Product manufacturing for others of combustion generated solids and gases, byproducts, and water effluents from steam generating facilities; Providing welding services; Field machining, namely, machining parts for others; Providing on-site alteration of any OEM boilers and boiler related equipmentACTIVEJun 7, 2011
042New product design, engineering, and research and development in the field of combustion generated solids and gases, byproducts, and water effluents from steam generating facilities; Providing regenerative selective catalytic reduction systems for industrial facilities and power plants, namely, design of regenerative selective catalytic reduction systems for industrial facilities and power plants; Providing selective catalytic reduction technology management and performance services, namely, design and emissions testing services for utility and industrial systems; Providing technological services, namely, design and engineering to upgrade and maintain steam generating plants; Providing engineering, quality control and design in the field of replacement pressure parts for boilers; Providing design services of heat recovery steam generators and aftermarket related services, namely, design services of replacement parts and components for heat recovery steam generators; New product design, engineering, and research and development; Providing turnkey solutions, namely, site inspections and evaluations of heat exchangers and condensersACTIVEJun 7, 2011

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 9, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 9, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 9, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 9, 2026CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Mar 9, 2026COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Oct 9, 2025NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Oct 9, 2025RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Oct 9, 202589AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Oct 9, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 17, 2025E89RTEAS SECTION 8 & 9 RECEIVED—
Mar 15, 2025REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Sep 1, 2022NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Sep 1, 2022C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Aug 30, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 21, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 10, 2022E815TEAS SECTION 8 & 15 RECEIVED—
Mar 15, 2021REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Mar 15, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 25, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 29, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 29, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 9, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 6, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 6, 2015XAECEXAMINER'S AMENDMENT ENTERED—
Nov 6, 2015GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 6, 2015GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 6, 2015CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 26, 2015GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 26, 2015GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 26, 2015CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 25, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 24, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 24, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 29, 2015ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Feb 23, 2015GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 23, 2015GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 23, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 18, 2015DOCKASSIGNED TO EXAMINER—
Nov 7, 2014MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Nov 6, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 31, 2014NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance