Drawing for MICHELS M

USPTO serial 86462643

MICHELS M

Reviewed by CopyMark Law Group

Reg. 4897285Status 710
Filing date
Status date
Registration date
Feb 9, 2016
Examiner
CASTRO, GIANCARLO
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with MICHELS M?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey D. Peterson

Jeffrey D. Peterson Michael Best & Friedrich LLP100 E. Wisconsin Avenue, Suite 3300Milwaukee, WI 53202UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
019Stone for building, architecture, construction, and landscaping; construction aggregates, namely stone and gravelSECTION 8 - CANCELLEDFeb 1, 2000
037Water, natural gas and petrochemical pipeline construction and repair; Water, natural gas and petrochemical pipeline repair by rehabilitation of a pipe through the relining of the pipe; construction, repair and maintenance of pipeline compressor, pumping, meter and regulator stations and water, natural gas and petrochemical pipelines; construction, repair and maintenance of water, natural gas and petrochemical pipeline storage facilities; construction, repair and maintenance of water, natural gas and petrochemical pipeline gathering systems; sewer construction, repair and maintenance; water and gas main construction, repair and maintenance; tunnel construction and repair; construction, repair and maintenance of natural gas distribution systems and underground and above ground installation and repair of pipelines and mains; drilling of tunnels, wells, oil and gas reservoirs, and water wells; drilling for the placement of pipes, lines, conduits and cables, horizontal directional drilling for the placement of pipes, lines, conduits and cables; construction, repair and maintenance of electric and power utility systems, transmission lines, distribution systems, and substations; Construction of underground utility systems and underground and above ground installation and repair of conduits, cables, lines, pipelines, poles and associated foundations; construction of wind turbines and wind energy systems; construction of earth retention services; construction of foundation systems and sheet pilings; construction or telecommunications systems, namely, tower construction and underground and above ground installation, repair and maintenance of conduits, cables and pipelines; road construction, repair and maintenance; airport construction, repair and maintenance; bridge construction, repair and maintenance; construction grading; road paving; construction dewatering, namely, removal of surface and ground water to facilitate construction; design and construction of foundations for civil construction projects; quarry services and mining extraction; stone crushing services; and by-pass plumbingSECTION 8 - CANCELLEDFeb 1, 2000
040Custom fabrication of pipelines and pipeline construction products; custom fabrication of building stoneSECTION 8 - CANCELLEDFeb 1, 2000
042Engineering services; Development, design and construction of earth retention systems; Design and construction of foundations for civil construction projects; Design, installation and operation of construction dewatering equipmentSECTION 8 - CANCELLEDFeb 1, 2000

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 19, 2022C8..CANCELLED SEC. 8 (6-YR)—
Feb 9, 2021REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Feb 9, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 24, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 24, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 4, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 21, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 20, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 20, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 19, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 19, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 12, 2015GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 12, 2015GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 12, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 20, 2015ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
May 12, 2015PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Apr 29, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 29, 2015ALIEASSIGNED TO LIE—
Apr 6, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 1, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 31, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 31, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 12, 2015GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 12, 2015GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 12, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 5, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 5, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 5, 2015DOCKASSIGNED TO EXAMINER—
Dec 3, 2014MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Dec 2, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 27, 2014NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance