Drawing for SANKYO OILLESS

USPTO serial 86485878

SANKYO OILLESS

Reviewed by CopyMark Law Group

Reg. 5096064Status 705Renewal
Filing date
Status date
Registration date
Dec 6, 2016
Examiner
RADEMACHER, APRIL LUEDERS
Law office
—

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 705: Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights.

Need help with SANKYO OILLESS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $748*

Plus Government fees of $1,300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Victoria Friedman

Victoria Friedman Dennemeyer & Associates, LLC2 North Riverside Plaza, Suite 1500Chicago, IL 60606UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Metal hardware in the nature of metal rings, namely, ring-shaped fittings of metal, screw rings of metal, rings of metal for keys, metal sealing rings, metal gasket rings; metal hardware, namely, metal washers; metal valves not being parts of machines; metal machine bolts; metal machine washers; metal plugs for use as parts of machines; washers of metal for use as parts of machines; eye bolts for use as parts of machines; metal lifting hooks for use as parts of machines; metal pins, namely, guide pins, stabilizer pins, joint pins, and assist pins for use as parts of machines; metal parts and fittings for turbines, namely, metal casings and forgings for turbines; non-electric prime movers for opening and closing dam gates, namely, metal hardware in the nature of springsACTIVEOct 6, 1997
007Metal hardware, namely, metal piston rings, metal seal rings for use with turbomachinery and centrifuges; machine parts, namely, locating keys, locating cones, plungers for siphoning fluids, plungers for absorbing shock, valve springs, spark plugs, stroke end blocks, stop blocks, shim plates, backup plates, multi-purpose high pressure washers, die fixing plates, skid brackets, air header brackets, urethane spring blocks, guide posts, bushings, machine end stops, ball sliders, guide holders, spacers, height and stock blocks, transmission chains other than for land vehicles, chains for conveyors, guide bars, spool retainers, wear plates, slide plates, cam gib plates, cam slide plates, cam guides, cam dwell plates, cam followers, cam stoppers, urethane stoppers, guide rollers, coil supports, blanking dies, punch retainers, die punches, punch strippers, lifters for elevating materials passing through machines, bearings, shafts, arm blocks, lifter arms, shaft arms, bush holders, connecting rods, pushers, pusher spring heads, connector plates, planeveyors in the nature of roller bearings for machines, embossed plates, rubber springs for vibration isolation in industrial machines of all types, cams, roller cams, keeper blocks, machine parts, namely, valves, grease rings, machine housings, guards, hoods, hangers, pulleys, bearings, cranks, shuttles, journals, journal boxes, sharpening wheels, shock absorber plungers, drilling bits, reels and guides; bearings for transmission shafts, being parts of machines; anti-friction bearings for machines; plastic molding and forming machines; metal molding and forming machines; replacement parts for power shovels, road rollers, cranes and conveyors, namely, chassis parts, bearings, guides, springs. non-electric prime movers for opening and closing dam gates, namely, machine parts in the nature of guides and bearings; machines and lines composed thereof for the production of automobile parts and steels; engine bearings for land vehicles, vessels, and aircraftACTIVEOct 6, 1997
012[ Bearings for land vehicles, vessels and aircraft, not including engine bearings for the foregoing, namely, axle bearings, wheel bearings ]SECTION 8 - CANCELLEDOct 6, 1997

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 6, 2025REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
May 19, 2023NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
May 19, 2023C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
May 19, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 7, 2022E815TEAS SECTION 8 & 15 RECEIVED—
Dec 6, 2021REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Dec 6, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 3, 2016SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Nov 2, 2016CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Oct 5, 2016SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Oct 5, 2016AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Sep 20, 2016IUAFUSE AMENDMENT FILED—
Sep 20, 2016EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Aug 23, 2016EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 19, 2016EX1GSOU EXTENSION 1 GRANTED—
Aug 19, 2016EXT1SOU EXTENSION 1 FILED—
Aug 19, 2016EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 23, 2016NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Dec 29, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 29, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 9, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 30, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 7, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 6, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 6, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 6, 2015TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 20, 2015GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 20, 2015GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 20, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 30, 2015DOCKASSIGNED TO EXAMINER—
Dec 25, 2014MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Dec 24, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 23, 2014NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance