Drawing for HMT

USPTO serial 86527493

HMT

Reviewed by CopyMark Law Group

Reg. 4934968Status 800Renewal
Filing date
Status date
Registration date
Apr 12, 2016
Examiner
BENMAMAN, ALICE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with HMT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,295*

Plus Government fees of $4,250

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Steven J Sinclair, Jr.

Steven J Sinclair, Jr. Fletcher Yoder P C11450 Compaq Center West DrBldg 9, Suite 300Houston, TX 77070-1445

Goods and services

ClassDescriptionStatusFirst use
006Industrial storage tanks made primarily of metal; internal floating metal lids for use with gas or liquefied gas storage tanks; gas and liquefied gas storage tanks made primarily of metal; fluid storage tanks made primarily of metal; storage tanks made primarily of metal; storage tanks made primarily of metal and metal roof coverings; metal seal systems comprised of metal seal shoes for storage tanks made primarily of metal; storage tank emissions reduction devices; metal ladders, prefabricated platforms of metal, and metal walkways for storage tanks made primarily of metal; metal drain systems comprised of metal pipes for storage tanks made primarily of metal for draining product, namely, gas or liquefied gas, from the storage tanks and draining accumulations of liquid from roofs of the storage tanksACTIVEJan 10, 2000
037Repair and maintenance of storage tanks; storage tank cleaning; installation of storage tanks; construction project management for storage tank installation; painting of storage tanks; construction consultation; industrial construction services, namely, general construction contracting services, building construction services, plant construction services, building restoration services, plant restoration services, storage tank equipment restoration services of industrial plants, chemical plants, mineral processing plants, power generating facilities, pipelines, mines, equipment, and industrial storage tanks; industrial cleaningACTIVEJan 10, 2000
039Capacity optimization, namely, optimizing storage capacity of industrial storage tanks, and inventory reduction strategy services, namely, reduction strategy services for non-productive inventory in industrial storage tanks; storage, distribution, and transportation of liquefied petroleum gasACTIVEJan 10, 2000
040Metal fabrication and finishing services for others; structural steel and pipe fabrication and finishing services for others; custom construction of tanks, vessels, large steel structures, equipment, namely, for metal fabrication and finishing services for others, and facilities for the exploration, production, refining, storage, transport, and processing of liquids and gases; custom fabrication of storage tanks; custom construction of ladders, platforms, or walkways of storage tanksACTIVEJan 10, 2000
042Conducting verticality and roundness studies of storage tanks, namely, conducting measurements on storage tanks for storage tank design considerations; engineering design services in the field of storage tanks; strapping, namely, storage tank measurement studies, and calibration services in the field of storage tanks; emissions reduction strategy studies of storage tanks, namely, monitoring of released emissions for emission reduction services in the field of storage tanks; capacity optimization and inventory reduction of storage tanks, namely, engineering services for optimizing capacity of storage tanks and limiting non-productive inventory in the field of storage tanks; safety solutions for storage tanks, namely, designing safety solutions for installation, operation, and maintenance in the field of storage tanks; engineering; engineering design services; engineering drawing services; consulting in the field of engineering; drafting of plans and engineering drawings for others; engineering surveying; inspection of storage tanksACTIVEJan 10, 2000

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 12, 2026NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED
Jun 12, 2026RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Jun 12, 202689AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Jun 12, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Apr 9, 2026E89RTEAS SECTION 8 & 9 RECEIVED
May 14, 2025ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Apr 12, 2025REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Nov 13, 2023NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Nov 13, 2023C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Oct 23, 2023EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Apr 24, 2023PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15
Oct 3, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
May 25, 2022ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Apr 5, 2022E815TEAS SECTION 8 & 15 RECEIVED
Apr 12, 2021REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Aug 11, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Apr 12, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 26, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jan 26, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 6, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Dec 21, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Dec 14, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Dec 14, 2015XAECEXAMINER'S AMENDMENT ENTERED
Dec 14, 2015GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Dec 14, 2015GNEAEXAMINERS AMENDMENT E-MAILED
Dec 14, 2015CNEAEXAMINERS AMENDMENT -WRITTEN
Dec 3, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Dec 3, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 2, 2015ALIEASSIGNED TO LIE
Nov 13, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 13, 2015GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 13, 2015GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 13, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 13, 2015DOCKASSIGNED TO EXAMINER
Feb 21, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Feb 10, 2015NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance