USPTO serial 86527493
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $4,250
The Woodlands, TX, US
The Woodlands, TX, US
The Woodlands, TX, US
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Steven J Sinclair, Jr.
Steven J Sinclair, Jr. Fletcher Yoder P C11450 Compaq Center West DrBldg 9, Suite 300Houston, TX 77070-1445| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Industrial storage tanks made primarily of metal; internal floating metal lids for use with gas or liquefied gas storage tanks; gas and liquefied gas storage tanks made primarily of metal; fluid storage tanks made primarily of metal; storage tanks made primarily of metal; storage tanks made primarily of metal and metal roof coverings; metal seal systems comprised of metal seal shoes for storage tanks made primarily of metal; storage tank emissions reduction devices; metal ladders, prefabricated platforms of metal, and metal walkways for storage tanks made primarily of metal; metal drain systems comprised of metal pipes for storage tanks made primarily of metal for draining product, namely, gas or liquefied gas, from the storage tanks and draining accumulations of liquid from roofs of the storage tanks | ACTIVE | Jan 10, 2000 |
| 037 | Repair and maintenance of storage tanks; storage tank cleaning; installation of storage tanks; construction project management for storage tank installation; painting of storage tanks; construction consultation; industrial construction services, namely, general construction contracting services, building construction services, plant construction services, building restoration services, plant restoration services, storage tank equipment restoration services of industrial plants, chemical plants, mineral processing plants, power generating facilities, pipelines, mines, equipment, and industrial storage tanks; industrial cleaning | ACTIVE | Jan 10, 2000 |
| 039 | Capacity optimization, namely, optimizing storage capacity of industrial storage tanks, and inventory reduction strategy services, namely, reduction strategy services for non-productive inventory in industrial storage tanks; storage, distribution, and transportation of liquefied petroleum gas | ACTIVE | Jan 10, 2000 |
| 040 | Metal fabrication and finishing services for others; structural steel and pipe fabrication and finishing services for others; custom construction of tanks, vessels, large steel structures, equipment, namely, for metal fabrication and finishing services for others, and facilities for the exploration, production, refining, storage, transport, and processing of liquids and gases; custom fabrication of storage tanks; custom construction of ladders, platforms, or walkways of storage tanks | ACTIVE | Jan 10, 2000 |
| 042 | Conducting verticality and roundness studies of storage tanks, namely, conducting measurements on storage tanks for storage tank design considerations; engineering design services in the field of storage tanks; strapping, namely, storage tank measurement studies, and calibration services in the field of storage tanks; emissions reduction strategy studies of storage tanks, namely, monitoring of released emissions for emission reduction services in the field of storage tanks; capacity optimization and inventory reduction of storage tanks, namely, engineering services for optimizing capacity of storage tanks and limiting non-productive inventory in the field of storage tanks; safety solutions for storage tanks, namely, designing safety solutions for installation, operation, and maintenance in the field of storage tanks; engineering; engineering design services; engineering drawing services; consulting in the field of engineering; drafting of plans and engineering drawings for others; engineering surveying; inspection of storage tanks | ACTIVE | Jan 10, 2000 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 12, 2026 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Jun 12, 2026 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Jun 12, 2026 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Jun 12, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 9, 2026 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| May 14, 2025 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Apr 12, 2025 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Nov 13, 2023 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Nov 13, 2023 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Oct 23, 2023 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Apr 24, 2023 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Oct 3, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 25, 2022 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Apr 5, 2022 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Apr 12, 2021 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Aug 11, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 12, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 26, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 26, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 6, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 21, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 14, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 14, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 14, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 14, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 14, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 3, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 3, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 2, 2015 | ALIE | ASSIGNED TO LIE | — |
| Nov 13, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 13, 2015 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 13, 2015 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 13, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 13, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 21, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 10, 2015 | NWAP | NEW APPLICATION ENTERED | — |