Drawing for TOSHIBA

USPTO serial 86580429

TOSHIBA

Reviewed by CopyMark Law Group

Reg. 5139711Status 710
Filing date
Status date
Registration date
Feb 14, 2017
Examiner
SINGH, TEJBIR
Law office
TMEG LAW OFFICE 106

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with TOSHIBA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Helen Hill Minsker

HELEN HILL MINSKER Banner-Witcoff10 S Wacker Dr Ste 3000Chicago, IL 60606-7437UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Reservoirs of metal; metal fluid storage tanks; metal storage tanks; metal storage tanks for hydrogen; reservoirs of metal for hydrogen; metal storage tanks for gas; reservoirs of metal for gas; industrial water tanks of metalSECTION 8 - CANCELLED—
007Wind-powered installations for generating electricity, namely, wind-powered electricity generators; hydrogen-powered installations for generating electricity, namely, electric generators; Solar-powered electricity generatorsSECTION 8 - CANCELLED—
009Electrolysers, namely, electrolytic cells; solar batteries; fuel cells; accumulators, namely, batteries; solar panels for production of electricity; hydrogen-based energy system featuring fuel cell technology comprised of solar batteries, fuel cells, and accumulators, namely, batteries; computer programs for estimating and controlling the most appropriate distribution of electrical power; computer programs for controlling the most appropriate supply of electrical power and hot water in case of disastersSECTION 8 - CANCELLED—
011Water supply installations for feeding water for industrial purposes; generators for electrolysis of water for industrial purposes; generators for electrolysis of water for household purposes; apparatus for generating electrolytic hydrogen by water, namely, hydrogen generatorsSECTION 8 - CANCELLED—
019Reservoirs and tanks of masonry for storing hydrogen; reservoirs and tanks of masonry for storing water; storage tanks of masonry for storing gas and waterSECTION 8 - CANCELLED—
020Reservoirs and tanks of plastic for storing hydrogen; reservoirs and tanks of plastic for storing water; reservoirs and tanks of plastic for storing gas; non-metal storage tanks for storing gas and waterSECTION 8 - CANCELLED—
037Construction services, namely, construction of wind-powered electricity power plants; installation of hydrogen-powered electricity generators; installation of solar power generation device; operation, check or maintenance of energy generating installations, namely, installation, maintenance or repair of energy generating installations; repair and maintenance of hydrogen-powered electricity generators; repair and maintenance of wind-powered electricity power plants; repair and maintenance of solar power generation device; repair and maintenance of reservoirs; repair and maintenance of water supply apparatus; repair and maintenance of generators for electrolysis water; repair and maintenance of apparatus for water electrolytic hydrogen; repair and maintenance of energy generating installationsSECTION 8 - CANCELLED—
039Distribution of gas; distribution of hydrogen; distribution of hydrogen fuel; electricity distribution; water supply distribution; hot water supply distribution; heat supply distribution; energy distributionSECTION 8 - CANCELLED—
042Architectural design; design of power plants; designing of industrial machines, apparatus, and instruments, and their parts; designing of systems composed of industrial machines, apparatus, and instruments, and their parts; design of hydrogen-powered electricity generators; design of hydrogen power generation facilities; computer software design, computer programming, or maintenance of computer software; providing computer programming services to customers that estimates and controls the most appropriate distribution of electrical power; cloud computing featuring software for estimating and controlling the most appropriate distribution of electrical power; Software as a service (SAAS) services, namely, providing computer programs for estimating and controlling the most appropriate distribution of electrical power; providing computer programming services to customers that enables for controlling of the most appropriate supply of electrical power and hot water in case of disasters; Cloud computing featuring software for controlling the most appropriate supply of electrical power and hot water in case of disasters; Software as a service (SAAS) services, namely, providing computer programs for controlling the most appropriate supply of electrical power and hot water in case of disastersSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 25, 2023C8..CANCELLED SEC. 8 (6-YR)—
Feb 14, 2022REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Feb 9, 2018COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Dec 28, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 28, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 6, 2017ES7RTEAS SECTION 7 REQUEST RECEIVED—
Feb 14, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 9, 2017DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Jan 9, 2017AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Nov 29, 2016IUCNNOTICE OF ALLOWANCE CANCELLED—
Nov 29, 2016EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Nov 8, 2016NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 13, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 13, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 24, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 9, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 3, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 3, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 2, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 2, 2016ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Feb 3, 2016GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Feb 3, 2016GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 3, 2016CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 25, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 25, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 25, 2016ALIEASSIGNED TO LIE—
Jan 12, 2016ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Oct 14, 2015GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Oct 14, 2015GNSLLETTER OF SUSPENSION E-MAILED—
Oct 14, 2015CNSLSUSPENSION LETTER WRITTEN—
Oct 13, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 12, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 12, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 14, 2015GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 14, 2015GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 14, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 14, 2015DOCKASSIGNED TO EXAMINER—
Apr 8, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 2, 2015NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance