USPTO serial 86580598
AMERICAN DREAM HOME IMPROVEMENT ROOFING SIDING GUTTERS
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- —
- Examiner
- KEELEY, ALISON REBECCA
- Law office
- TMO LAW OFFICE 113 - EXAMINING ATTORNEY ASSIGNED
What this means
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
Need help with AMERICAN DREAM HOME IMPROVEMENT ROOFING SIDING GUTTERS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
MICHAEL SCHLECHTWEG
MICHAEL SCHLECHTWEG Knell O'Connor Danielewicz901 W Jackson Blvd Ste 301Chicago, IL 60607-3738UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Building construction; Building construction and repair; Building construction services; Building construction supervision; Building construction, remodeling and repair; Building maintenance and repair; Building restoration; Concrete pouring and forming for buildings and other commercial or public concrete structures; Constructing decks; Constructing porches; Constructing sunrooms; Construction and construction management of tunnels and underground structures; Construction and installation of masonry walls and structures; Construction and renovation of buildings; Construction and repair of buildings; Construction and repair of movie and theatrical sets and scenery; Construction consultancy; Construction consultation; Construction dewatering, namely, the removal of surface waters and groundwater to facilitate the construction of structures and pipelines; Construction grading services; Construction management; Construction of airports; Construction of aquatics facilities; Construction of buildings; Construction of facilities, structures, living quarters, and utility buildings, production modules and subsea modules in the oil and gas industry; Construction of medical establishments; Construction of modular buildings; Construction of modular homes; Construction of roads, underground utilities, and housing pads; Construction of structures for the production of crude oil; Construction of structures for the production of natural gas; Construction of structures for the storage of crude oil; Construction of structures for the storage of natural gas; Construction of telecommunication towers; Construction planning; Construction project management services; Construction project management services in the field of construction of offshore oil and gas facilities; Construction project management services in the field of construction of renewable energy and energy generation equipment support structures and ancillary structures for supporting meteorological data gathering equipment; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Construction services, namely, installation of environmental containment systems; Construction services, namely, manhole adjusting; Construction services, namely, planning, laying out and construction of a planned residential community; Construction services, namely, planning, laying out and construction of residential and commercial communities; Construction services, namely, planning, laying out and custom construction of commercial buildings; Construction services, namely, planning, laying out and custom construction of residential and commercial communities; Construction supervision; Construction, maintenance and renovation of property; Construction, maintenance, and construction project management services in oil and gas fields; Consultation in building construction supervision | ACTIVE | Feb 1, 2015 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 2, 2016 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Feb 2, 2016 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jul 7, 2015 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 7, 2015 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 7, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 6, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 9, 2015 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Apr 8, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 2, 2015 | NWAP | NEW APPLICATION ENTERED | — |