USPTO serial 86615060
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $2,600
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Thomas J. Mango
Thomas J. Mango CANTOR COLBURN LLP20 CHURCH STREET22nd FLOORHARTFORD, CT 06103| Class | Description | Status | First use |
|---|---|---|---|
| 007 | [ Machines and equipment for mining, energy production and for treatment of industrial waste processing streams, and not for land vehicles, namely, steam engine boilers, waste heat boilers, heat recovery steam-operated generators, acid generation machines, electroplating machines, electric pumps, pumps for machines, electrochloration machines, power-operated sludge cleaning machines for steam generators and parts and fittings therefor; machines and equipment for the treatment, processing and galvanizing of metal, namely, stainless steel, high tensile steel and aluminum, namely, rolling mills, metal coating machines, skin pass mills, metalworking machines, continuous steel processing lines, fast quenching and cooling lines for steel ] | SECTION 8 - CANCELLED | — |
| 009 | [ Computer aided manufacturing (CAM) software for use in the industrial operation, control and optimization of industrial processes and equipment for the acid mining, steel, power generation, water treatment and energy efficiency industries; software for the industrial operation, control and optimization of industrial processes and equipment for the acid mining, steel, power generation, water treatment and energy efficiency industries, namely, database management software, computer software to monitor and control factory manufacturing processes, industrial process control software, computer software for detecting and measuring water quality ] | SECTION 8 - CANCELLED | — |
| 011 | [ Steam generators; machines for power generation, industrial waste processing and other industrial processes, namely, solar boilers, energy generation power plants, water desalination units, and water filtration units; apparatus for the treatment, processing and galvanizing of metal, including stainless steel, high tensile steel and aluminum, namely, reheating and heating treatment furnaces, annealing furnaces ] | SECTION 8 - CANCELLED | — |
| 012 | Diesel engines for land vehicles; armored vehicles; locomotives | ACTIVE | — |
| 013 | Guns; ballistic and guided missiles; targeting systems comprised of non-telescopic visible and infrared aiming lasers and illuminators which acquire targets for guns and ballistic or guided missiles for armored turrets and cupolas and armored platforms, namely, unmanned aerial vehicles (UAVs) | ACTIVE | — |
| 037 | Maintenance, repair, improvement, construction and installation of machines and equipment for mining, energy production and for treatment of industrial waste processing streams, and not for land vehicles, namely, steam engine boilers, waste heat boilers, heat recovery steam-operated generators, acid generation machines, electroplating machines, electric pumps, pumps for machines, electrochloration machines, power-operated sludge cleaning machines for steam generators; maintenance, repair, improvement, construction and installation of machines and equipment for the treatment, processing and galvanizing of metal, namely, stainless steel, high tensile steel and aluminum, namely, rolling mills, metal coating machines, skin pass mills, metalworking machines, continuous steel processing lines, fast quenching and cooling lines for steel; maintenance, repair, improvement, construction and installation of machines and equipment for steam generation, power generation, treatment of industrial waste streams and other industrial processes, namely, solar boilers, energy generation power plants, water desalination units, and water filtration units; maintenance, repair, improvement, construction and installation of machines and equipment for the treatment, processing and galvanizing of metal, including stainless steel, high tensile steel and aluminum, namely, reheating and heating treatment furnaces, annealing furnaces; maintenance, repair, improvement, construction and installation of machines and equipment, namely, diesel engines for land vehicles, armored vehicles, locomotives, guns, ballistic and guided missiles, targeting systems which acquire targets for guns and ballistic or guided missiles for armored turrets and cupolas and armored platforms, namely, unmanned aerial vehicles (UAVs) | ACTIVE | — |
| 042 | Product research, development and engineering in the fields of mining, energy production equipment, military defense systems, and flow of waste processing; design of computer systems and software in the fields of engineering, mining, energy production equipment, military and defense systems, flow of waste processing and energy measurement; scientific and technological services, namely, testing and analysis of materials in the fields of engineering, mining, energy production equipment, military defense systems, flow of waste processing; maintenance, repair, improvement, and design of computer aided manufacturing (CAM) software for use in the industrial operation, control and optimization of industrial processes and equipment for the acid mining, steel, power generation, water treatment and energy efficiency industries; maintenance, repair, improvement, and design of software for the industrial operation, control and optimization of industrial processes and equipment for the acid mining, steel, power generation, water treatment and energy efficiency industries, namely, database management software, computer software to monitor and control factory manufacturing processes, industrial process control software and computer software for detecting and measuring water quality | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 15, 2026 | PRAM | POST REGISTRATION ACTION MAILED - SEC. 7 | — |
| Jul 2, 2026 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Mar 25, 2026 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Oct 26, 2025 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Oct 7, 2025 | PRAM | POST REGISTRATION ACTION MAILED - SEC. 7 | — |
| Sep 10, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 25, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 8, 2025 | ERTR | TEAS REQUEST TO DIVIDE REGISTRATION | — |
| Sep 25, 2023 | NAS8 | NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED | — |
| Sep 25, 2023 | 8.PR | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED | — |
| Sep 25, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 14, 2023 | XXXX | POST REGISTRATION ACTION CORRECTION | — |
| Sep 14, 2023 | XXXX | POST REGISTRATION ACTION CORRECTION | — |
| Sep 14, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 25, 2023 | ES8R | TEAS SECTION 8 RECEIVED | — |
| Mar 15, 2023 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Oct 25, 2021 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Oct 25, 2016 | R.SR | REGISTERED-SUPPLEMENTAL REGISTER | Your mark is registered on the Supplemental Register, which is available for marks that are not yet distinctive enough for the Principal Register but can still identify a source. Protection is more limited than Principal Register registration but can later support a Principal Register application. |
| Sep 19, 2016 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 14, 2016 | EXPT | EXPARTE APPEAL TERMINATED | — |
| Sep 14, 2016 | CNTA | APPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER | — |
| Sep 14, 2016 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 14, 2016 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 14, 2016 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 14, 2016 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 14, 2016 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Sep 14, 2016 | CNTA | APPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER | — |
| Sep 14, 2016 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 14, 2016 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 14, 2016 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 14, 2016 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 14, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 14, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 12, 2016 | ALIE | ASSIGNED TO LIE | — |
| Jul 7, 2016 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jul 7, 2016 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| Jul 7, 2016 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Jul 7, 2016 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Jan 8, 2016 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jan 8, 2016 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 8, 2016 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 10, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 6, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 6, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 9, 2015 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 9, 2015 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 9, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 12, 2015 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 12, 2015 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 12, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 11, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| May 12, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 4, 2015 | TAEA | TEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED | — |
| May 4, 2015 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| May 4, 2015 | NWAP | NEW APPLICATION ENTERED | — |