USPTO serial 86619970
SAFER. STRONGER. INFRASTRUCTURE.
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- DELANEY, ZHALEH SYBIL
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with SAFER. STRONGER. INFRASTRUCTURE.?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Paul I. J. Fleischut
PAUL I. J. FLEISCHUT Senniger Powers Llp100 N Broadway Fl 17Saint Louis, MO 63102-2728UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Building construction; construction consultation, planning, management and supervision; construction of structures for the production, transport and storage of crude oil, natural gas, chemicals, and renewable energy and consulting and project management services for the same; electrical contractor services; pipeline and pipeline terminal construction and maintenance; construction project management for gas plant, oil refinery, chemical plant and renewable energy plant shutdowns for the purposes of maintenance, overhaul, repair, inspection, and testing; Reinforcement of buildings, and other commercial or public building structures of masonry, concrete, steel and wood, namely, planning of installation, laying out of installation, and supervising of installation of reinforcement materials on buildings, pipes, bridges, structural columns, structural beams, structural slabs, structural walls, pipes, tanks, chimneys, structural connections, transportation infrastructure, water transmission facilities, waterfront structures, water storage facilities, and water treatment facilities; Repair and reconstruction of existing conduits and pipelines, such as sewer pipes, water mains and industrial pipelines by installing a liner within the existing conduit; lining the interior of pipelines for others by spraying on a fluid impervious epoxy-based barrier for protection from abrasion and corrosion; applying protective coatings to pipes; repairing pipes by coating with an epoxy; pipeline and cathodic protection installation and repair; laying and construction of pipelines and cathodic protection systems; construction and repair of cathodic protection systems for steel-reinforced structures | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 2, 2021 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Jul 18, 2016 | MAB6 | ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Jul 18, 2016 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Dec 15, 2015 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Nov 11, 2015 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Oct 20, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 20, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 30, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 15, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 13, 2015 | ALIE | ASSIGNED TO LIE | — |
| Aug 19, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 19, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 19, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 19, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 19, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 14, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| May 14, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 8, 2015 | NWAP | NEW APPLICATION ENTERED | — |