Drawing for STRONGER. SAFER. INFRASTRUCTURE.

USPTO serial 86650410

STRONGER. SAFER. INFRASTRUCTURE.

Reviewed by CopyMark Law Group

Reg. 4924414Status 710
Filing date
Status date
Registration date
Mar 22, 2016
Examiner
DELANEY, ZHALEH SYBIL
Law office
TMO LAW OFFICE 116

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with STRONGER. SAFER. INFRASTRUCTURE.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

William D. O'Neill

William D. O'Neill STINSON LLP7700 FORSYTH BLVD., SUITE 1100St. Louis, MO 63105UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Building construction; construction consultation, planning, management and supervision; construction of structures for the production, transport and storage of crude oil, natural gas, chemicals, and renewable energy and consulting and project management services for the same; electrical contractor services; pipeline and pipeline terminal construction and maintenance; construction project management for gas plant, oil refinery, chemical plant and renewable energy plant shutdowns for the purposes of maintenance, overhaul, repair, inspection, and testing; Reinforcement of buildings, and other commercial or public building structures of masonry, concrete, steel and wood, namely, planning of installation, laying out of installation, and supervising of installation of reinforcement materials on buildings, pipes, bridges, structural columns, structural beams, structural slabs, structural walls, pipes, tanks, chimneys, structural connections, transportation infrastructure, water transmission facilities, waterfront structures, water storage facilities, and water treatment facilities; Repair and reconstruction of existing conduits and pipelines, such as sewer pipes, water mains and industrial pipelines by installing a liner within the existing conduit; lining the interior of pipelines for others by spraying on a fluid impervious epoxy-based barrier for protection from abrasion and corrosion; applying protective coatings to pipes; repairing pipes by coating with an epoxy; pipeline and cathodic protection installation and repair; laying and construction of pipelines and cathodic protection systems; construction and repair of cathodic protection systems for steel-reinforced structuresSECTION 8 - CANCELLEDJun 1, 2015

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 2, 2026CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Jun 26, 2026ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Mar 22, 2025REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Sep 16, 2022NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Sep 16, 2022C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Sep 16, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 22, 2022E815TEAS SECTION 8 & 15 RECEIVED—
Jun 2, 2021ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Mar 22, 2021REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jan 31, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 22, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 17, 2016SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Feb 16, 2016CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Feb 15, 2016SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Feb 7, 2016AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jan 4, 2016IUAFUSE AMENDMENT FILED—
Jan 4, 2016EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Dec 15, 2015NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Nov 13, 2015CHPBPOST PUBLICATION AMENDMENT - ENTERED—
Nov 13, 2015APETASSIGNED TO PETITION STAFF—
Nov 11, 2015ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Oct 29, 2015EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Oct 20, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 20, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 30, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 17, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 13, 2015ALIEASSIGNED TO LIE—
Aug 19, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 19, 2015XAECEXAMINER'S AMENDMENT ENTERED—
Aug 19, 2015GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 19, 2015GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 19, 2015CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 14, 2015DOCKASSIGNED TO EXAMINER—
Jun 9, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 6, 2015NWAPNEW APPLICATION ENTERED—