Drawing for CUPERTINO ELECTRIC INC.

USPTO serial 86666650

CUPERTINO ELECTRIC INC.

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
LAWRENCE, SUSAN KASTRINER
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with CUPERTINO ELECTRIC INC.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Stephen R. Garcia

STEPHEN R. GARCIA FENWICK & WEST LLP801 CALIFORNIA STSilicon Valley CenterMOUNTAIN VIEW, CA 94041-1990

Goods and services

ClassDescriptionStatusFirst use
004Electrical energy; renewable energy, namely, solar energy, wind energy and geothermal energyACTIVE—
007Electrical and electronic apparatus and equipment all for use in generating energy obtained from traditional, renewable and alternative energy sources; auxiliary power units for supplying electrical power that are housed in pre-fabricated and modular electrical power roomsACTIVE—
009Computer software for displaying and monitoring energy usage; electrical integrated control systems for use in the electric energy industry comprised within pre-fabricated and modular electrical control rooms; electrical storage batteries and associated electrical components, namely, inverters, electrical disconnect switches, circuit breaker panel boards, meters, Supervisory Control and Data Acquisition (SCADA) systems comprised of remote terminal units, sensors, programmable logic controllers, input and output servers, operator clients, supervisory computers, data acquisition servers, and programmable controllers with input and output features for digital devices and with capability of being connected to external supervisory computers, and computer hardware systems integrating remote terminal units and programmable logic controllers, and relays; electrical power storage systems composed of batteries, electrical wiring and enclosure, and associated software for operating the systems; renewable battery system to provide backup power; computer software and hardware installed in pre-fabricated and modular electrical power rooms for managing and monitoring the supply of electrical powerACTIVE—
011Alternative energy generation power plants comprised of pre-fabricated and modular electrical power rooms for supplying electrical powerACTIVE—
035Business consulting services for the electric energy industry; Providing business consulting services in the field of power generation, and consulting in the field of energy consumption to improve energy efficiency; business consulting services related to facilitating the business and commercial relationships and communications between the users, operators, and owners of commercial and institutional facilities; energy management services, namely, providing a service that allows customers to purchase energy, namely, electricity, natural gas and renewable energy, at a fixed price; business venture development and formation consulting services for the renewable energy industry; consulting to consumers regarding the purchase of renewable energy generation equipment; consulting in sales techniques and sales programmes in the field of renewable energy generation equipmentACTIVE—
036Consulting regarding financing of purchases of renewable energy generation equipmentACTIVE—
037Consulting services in the field of construction planning and project management, namely, consulting regarding the building and installation of electrical systems of commercial and institutional facilities; electrical contracting; installation of electrical systems; comprehensive preventative maintenance service for electrical systems; contractor services, namely, review of and remedial recommendations for electrical systems for others; electrical repairs and installation of solar energy systems, power inverters, data centers, uninterruptible power supply (UPS) systems, gas fired power plants, cogeneration plants, low voltage generator systems, medium voltage generator systems, high voltage generator systems; installation of electrical and power-generating machinery; installation of pre-fabricated and modular electrical power and control rooms namely, proprietary configurable multi- and single- module array solutions serving primarily the data center sector with turnkey solutions or solution components in the nature of structures for generating energy, weather-tight buildings, power distribution units, and computer server hall space; construction consultancy; construction project management services; consulting services in the field of construction of renewable energy facilities and generation plants; consulting in the field of electrical construction, namely, electrical contracting and installation of electrical systems; consulting services in the field of installation of renewable energy equipment; repair and maintenance of electronic machines and apparatus; construction of telecommunication systems; construction project management services in the field of construction of renewable energy and energy generation equipment support structures; installation of renewable energy generation equipment; the installation of heating, cooling, and environmental control systems primarily using solar energy and renewable energy resourcesACTIVE—
040Technical consulting in the field of production of solar energy power generation; consulting regarding leasing of renewable energy generation equipmentACTIVE—
042Electrical systems integration services, namely, providing technological and engineering consulting services regarding the systems interface between electrical systems of users, operators and owners of commercial and institutional facilities; providing technical research and consulting services in the field of energy measurement to improve energy efficiency; electrical systems integration services, namely, providing engineering consulting services in the field of energy efficiency and electrical systems design; technology planning, evaluation, selection and consulting in the field of renewable energy; electrical engineering services; technological consulting services in the field of renewable energy generation; consulting services in the field of testing of electronic components, racking systems, performance analysis software and electronic systems; planning and development of electronic communications networks; research in the field of renewable energy; electronic and electrical systems design and consultancy services related theretoACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Nov 27, 2017MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Nov 27, 2017ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Apr 25, 2017NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Feb 28, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 28, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 8, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 26, 2017PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 13, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 24, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 23, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 23, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 24, 2016GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 24, 2016GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 24, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 9, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 9, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 9, 2016ALIEASSIGNED TO LIE—
Jun 1, 2016NREVNOTICE OF REVIVAL - E-MAILED—
May 31, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 31, 2016PETGPETITION TO REVIVE-GRANTED—
May 31, 2016PROATEAS PETITION TO REVIVE RECEIVED—
Apr 25, 2016MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Apr 25, 2016ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Sep 26, 2015GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 26, 2015GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 26, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 26, 2015DOCKASSIGNED TO EXAMINER—
Jun 24, 2015MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jun 23, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 22, 2015NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance