What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with REMSAFE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Kelmscott, Western AU, AU
Balcatta, WA, AU
Balcatta, WA, AU
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Bradley J. Luchsinger/Jessica S. Sachs
Bradley J. Luchsinger/Jessica S. Sachs Harness, Dickey & Pierce, P.L.C.5445 Corporate DriveSuite 200Troy, MI 48098Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Hydraulic, pneumatic and mechanical machines and machine parts, namely, hydraulic valves, hydraulic control valves, pneumatic valves, pneumatic control valves, power operated valves, mechanical valves, control valves, isolation apparatus, namely, locking devices, shut-off valves, clamping mechanisms, restraining devices, valves and mechanisms for de-energizing stored energy, for use in physically isolating or preventing operation of mechanical devices, namely, machinery parts, equipment parts, mining, oil and gas and material handling applications, and industrial conveyor, bulk handling equipment and fluid in pipelines | SECTION 8 - CANCELLED | — |
| 009 | Apparatus for the control of machines, namely, electronic, electrical, power, pressure, temperature and flow controllers for mechanical, hydraulic and/or pneumatic machines; control installations, namely, electric installations for the remote control of industrial operations; control apparatus, namely, electric control devices for mechanical, hydraulic and/or pneumatic machinery; industrial operations process controllers for use with hydraulic, pneumatic or mechanical machinery; automated process control system apparatus, instruments and units, comprised of logic based hardware used to monitor the status of industrial processes, namely, power generation, electrical distribution, material or fluid flow control, and pressure and temperature management in hydraulic, pneumatic or mechanical machinery; process controllers in the form of industrial process control software for use with hydraulic, pneumatic or mechanical machinery; electric automatic control valves; power supply apparatus, namely, inverters for power supply; mechanical power mechanisms, namely, power adapters, amplifiers, connectors, line conditioners, transformers, switches, controllers, regulators and circuit breakers; apparatus for managing energy supply in the form of electric control devices for energy management; electrical apparatus other than a generator for converting electronic radiation to electrical energy, namely, photovoltaic thermal module for use in energy supply; electric energy control devices and voltage regulators for use in electric power energy management; remote control devices for energy management, for the isolation of energy and power; industrial safety equipment, namely, isolation apparatus for the isolation of energy and power from machines or machine components; industrial safety equipment, namely, isolation apparatus for the isolation of machinery and industrial equipment; industrial safety equipment, namely, isolation apparatus for use with mining, oil and gas and material handling machinery and equipment; industrial safety equipment, namely, isolation apparatus for industrial conveyors, bulk handling equipment and fluid in pipelines; apparatus for the control of machines, namely, electric control panels; industrial safety equipment in the form of fault isolation units used to remotely control the isolation of conveyors and related equipment used for bulk material handling to and from mine sites and ports; none of the aforementioned used for the detection of radiation | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 25, 2025 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Oct 9, 2023 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jul 7, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 7, 2023 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jul 7, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 7, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 7, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jul 7, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Oct 9, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 30, 2018 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Aug 30, 2018 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jul 17, 2018 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Jul 17, 2018 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| Feb 2, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 31, 2018 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jan 31, 2018 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jan 31, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 29, 2017 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 27, 2017 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jul 27, 2017 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jul 27, 2017 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 31, 2017 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Dec 6, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 6, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 16, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 3, 2016 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 20, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 13, 2016 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Oct 13, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 6, 2016 | PAPER RECEIVED | — | |
| Aug 8, 2016 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Aug 8, 2016 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Aug 8, 2016 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jul 21, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 21, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 20, 2016 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| May 2, 2016 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| May 2, 2016 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| May 2, 2016 | CNSL | SUSPENSION LETTER WRITTEN | — |
| May 2, 2016 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| May 2, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 11, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 11, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 5, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 7, 2015 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 7, 2015 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 7, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 28, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 17, 2015 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Aug 6, 2015 | ALIE | ASSIGNED TO LIE | — |
| Jul 23, 2015 | PAPER RECEIVED | — | |
| Jun 26, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 25, 2015 | NWAP | NEW APPLICATION ENTERED | — |