USPTO serial 86675586
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $2,550
TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORP.
KAWASAKI-SHI, JP
Other trademarks owned by TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORP.
Tokyo, JP
Tokyo, JP
Tokyo, JP
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Anna King
Anna King Banner & Witcoff, Ltd.71 South Wacker Drive, 36th FloorChicago, IL 60606UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | [ Reservoirs of metal; Liquid storage tanks of metal or reservoirs of metal; Industrial water storage tanks of metal; Hydrogen storage tanks of metal and reservoirs of metal ] | SECTION 8 - CANCELLED | — |
| 007 | [ Non-electric prime movers not for land vehicles and except for water mills and wind mills, namely, internal combustion engines not for land vehicles and except for water mills and wind mills, jet engines not for land vehicles and except for water mills and wind mills, rocket engines not for land vehicles and except for water mills and wind mills; Parts for non-electric prime movers not for land vehicles and except for water mills and wind mills, namely, parts for internal combustion engines not for land vehicles and except for water mills and wind mills consisting of pistons and heads, parts for jet engines not for land vehicles and except for water mills and wind mills, namely, pistons and heads, parts for rocket engines not for land vehicles and except for water mills and wind mills, namely, pistons and heads; Turbines not for land vehicles; ] Generators, namely, generators of electricity [ ; Starters for motors and engines; Electric AC motors and DC motors for machines and parts therefor, not including those for land vehicles; Wind-power installations for generating electricity, namely, wind farms comprised of multiple wind powered electricity generators ] | ACTIVE | — |
| 009 | [ Ozonisers, namely, ozonators; Electrolysers, namely, electrolytic cells; Apparatus for generating electrolytic hydrogen by water; Rotary converters; Phase modifiers, namely, electric phase modifiers; Solar batteries; Fuel cells; Accumulators, namely, storage batteries; Solar panels for the production of electricity; ] Hydrogen-based electricity generators with fuel cell technology comprised of water-electrolysis hydrogen generators, hydrogen storage tank, fuel cell, water supply installations for feeding water for industrial purposes and accumulators, namely, Electric storage batteries [ ; Computer programs for estimating and controlling the most appropriate distribution of electrical power; Computer programs for controlling the most appropriate supply of electrical power and hot water in case of disasters ] | ACTIVE | — |
| 011 | [ Water supply installations for feeding water for industrial purposes; Generators for electrolysis of water for industrial purposes; Water-electrolysis hydrogen generators; Photovoltaic power plants; ] Hydrogen generators; [ Industrial Boilers, namely, industrial electric boilers; ] Generators for electricity, namely, generators powered by hydrogen | ACTIVE | — |
| 019 | [ Reservoirs not of metal, namely, reservoirs made of masonry for storing hydrogen; Reservoirs not of metal, namely, reservoirs made of masonry for storing water; storage tanks of masonry for storing hydrogen ] | SECTION 8 - CANCELLED | — |
| 020 | [ Reservoirs of plastic for storing hydrogen for commercial or industrial use; reservoirs of plastic for storing water for commercial or industrial use; storage tanks of plastic for storing hydrogen ] | SECTION 8 - CANCELLED | — |
| 037 | [ Construction of wind power plants; Installation of hydrogen-powered electricity generators with fuel cell technology; Installation of solar power generation device; Monitoring or maintenance of building equipment; Monitoring or maintenance of energy generating installations; Repair and maintenance of generators; Repair and maintenance of hydrogen-powered electricity generators with fuel cell technology; Repair and maintenance of wind-powered electricity power plants; Repair and maintenance of solar power generation device; Repair and maintenance of reservoirs; Repair and maintenance of water purifying units; Repair and maintenance of water supply installations; Repair and maintenance of generators for electrolysis water for industrial purposes; Repair and maintenance of apparatus for water-electrolysis hydrogen generators; Repair and maintenance of energy generating installations ] | SECTION 8 - CANCELLED | — |
| 039 | [ Electricity distribution services; Water supply distribution services; Heat supply distribution services ] | SECTION 8 - CANCELLED | — |
| 042 | [ Architectural design; Design of power plants; Designing of machines, apparatus, instruments, including their parts, in the field of electricity generators or systems composed of such machines, apparatus and instruments in the field of electricity generators; Design of hydrogen-powered electricity generators with fuel cell technology; Design of hydrogen power generation facilities with fuel cell technology; Design of power plants; Computer software design, computer programming, or maintenance of computer software; Providing computer programming services to customers that estimates and controls the most appropriate distribution of electrical power; Providing computer programming services to customers that enables for control of the most appropriate supply of electrical power and hot water in case of disasters ] | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 23, 2025 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Mar 9, 2023 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Mar 9, 2023 | C15P | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Feb 28, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 11, 2022 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Aug 23, 2021 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Nov 14, 2018 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Sep 25, 2017 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Sep 25, 2017 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Apr 5, 2017 | PRAM | POST REGISTRATION ACTION MAILED - SEC. 7 | — |
| Mar 20, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Nov 18, 2016 | ES7R | TEAS SECTION 7 REQUEST RECEIVED | — |
| Oct 26, 2016 | FIXD | ELECTRONIC RECORD REVIEW COMPLETE | — |
| Aug 23, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 20, 2016 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Jul 20, 2016 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Jul 5, 2016 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| May 10, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 10, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 20, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 25, 2015 | ERRR | ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED | — |
| Nov 24, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 24, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 24, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 24, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 24, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 17, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 17, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 17, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 29, 2015 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 29, 2015 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 29, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 7, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 6, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 6, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 28, 2015 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 28, 2015 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 28, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 15, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 3, 2015 | MPMK | NOTICE OF PSEUDO MARK E-MAILED | — |
| Jul 2, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 30, 2015 | NWAP | NEW APPLICATION ENTERED | — |