USPTO serial 86704411
ENER-CORE
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- May 8, 2018
- Examiner
- LEE RISO, LOKSYE GEORGIANA
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with ENER-CORE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Lynne M.J. Boisineau
LYNNE M.J. BOISINEAU MCDERMOTT WILL & EMERY LLP18565 Jamboree Rd., Suite 250IRVINE, CA 92612UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Renewable energy systems, namely, energy generating and controlling systems comprised of apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity, turbines, and boilers; computer software for networking and controlling renewable energy systems | SECTION 8 - CANCELLED | Oct 21, 2016 |
| 011 | Waste treatment equipment, namely, equipment for processing waste gases and volatile organic compounds, solvent and paint vapors, odors, and waste vapors, processing equipment for waste gas streams from industrial processing equipment, waste treatment systems comprised of thermal oxidation equipment, fine particulate filters, apparatus for destroying volatile organic compounds and hazardous air pollutants; apparatus for destroying liquid waste streams, namely, clarification and thickening machines for use in treatment of liquids in the nature of water, waste water and industrial water, waste liquids, solvents, and paint; heating apparatus, namely, air heating apparatus, kilns, furnaces, water and steam heating apparatus, thermal liquids heating apparatus; steam generating apparatus, namely, boilers, heat recovery steam generators, steam generating and heating apparatus for industrial purposes; drying apparatus, namely, hot air dryers, hot gas dryers, heat exchange dryers, indirect heat dryers, industrial apparatus using gas or air for drying and cleaning components in the energy industry | SECTION 8 - CANCELLED | Oct 21, 2016 |
| 035 | business consulting services in the field of renewable energy, energy generating and controlling equipment, waste treatment equipment, steam generation, and combined heat and power applications; Renewable energy services, namely, providing business information in the field of renewable energy efficiency, energy generation efficiency, and energy efficiency | SECTION 8 - CANCELLED | Oct 21, 2016 |
| 037 | Construction, installation, maintenance and repair services of renewable energy equipment, energy generating and controlling equipment, waste treatment equipment, steam generation, and combined heat and power equipment, turbines and steam turbine equipment; renewable energy services, namely, installation, operations, repairs, maintenance, and overhauls of renewable energy power plants | SECTION 8 - CANCELLED | Oct 21, 2016 |
| 040 | generation of power and electricity; energy production; energy production, namely, co-generation and tri-generation energy production in the nature of creating combined heat and power energy and the simultaneous generation of electricity and useful heating and cooling from the combustion of a biomass fuel; production of environmentally-friendly forms of energy and power; waste processing and treatment services; contract manufacturing in the field of renewable energy related products and resources; renewable energy services, namely, generation of renewable energy, processing of gas and liquid waste streams, production of distributed energy resources in the nature of power, heat, and cooling, combined heat and power generation, steam and heat generation | SECTION 8 - CANCELLED | Oct 21, 2016 |
| 042 | Engineering services; development of new technologies for others in the field of renewable energy related products and resources; renewable energy services, namely, technical planning of renewable energy based power plants; engineering and technical services in the nature of technical consultation in the field of waste processing, renewable power generation, combined heat and power applications; power plant engineering, namely, testing and evaluation of power plant equipment to improve performance and efficiency of such equipment; software design and development | SECTION 8 - CANCELLED | Oct 21, 2016 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Ener-Core Power, Inc.
- Other trademarks owned by Ener-Core Power, Inc.
- Other trademarks owned by Ener-Core Power, Inc.
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named ENER-CORE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 22, 2024 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Sep 27, 2023 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| May 8, 2023 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Apr 19, 2023 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Jan 11, 2019 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 8, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 31, 2018 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Mar 30, 2018 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Mar 21, 2018 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Mar 16, 2018 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Feb 28, 2018 | IUAF | USE AMENDMENT FILED | — |
| Feb 28, 2018 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Aug 30, 2017 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 28, 2017 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Aug 28, 2017 | EXT2 | SOU EXTENSION 2 FILED | — |
| Aug 28, 2017 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 2, 2017 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 28, 2017 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Feb 28, 2017 | EXT1 | SOU EXTENSION 1 FILED | — |
| Feb 28, 2017 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 30, 2016 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jul 5, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 5, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 15, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 1, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 1, 2016 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 1, 2016 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 1, 2016 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 1, 2016 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 11, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 10, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 10, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 10, 2015 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 10, 2015 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 10, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 4, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 1, 2015 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Jul 31, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 28, 2015 | NWAP | NEW APPLICATION ENTERED | — |