Drawing for ENER-CORE

USPTO serial 86704417

ENER-CORE

Reviewed by CopyMark Law Group

Reg. 5464930Status 710
Filing date
Status date
Registration date
May 8, 2018
Examiner
LEE RISO, LOKSYE GEORGIANA
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ENER-CORE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Lynne M.J. Boisineau

LYNNE M.J. BOISINEAU MCDERMOTT WILL & EMERY LLP18565 Jamboree Rd., Suite 250IRVINE, CA 92612UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Renewable energy systems, namely, energy generating and controlling systems comprised of apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity, turbines, and boilers; computer software for networking and controlling renewable energy systemsSECTION 8 - CANCELLEDOct 21, 2016
011Waste treatment equipment, namely, equipment for processing waste gases and volatile organic compounds, solvent and paint vapors, odors, and waste vapors, processing equipment for waste gas streams from industrial processing equipment, waste treatment systems comprised of thermal oxidation equipment, fine particulate filters, apparatus for destroying volatile organic compounds and hazardous air pollutants; apparatus for destroying liquid waste streams, namely, clarification and thickening machines for use in treatment of liquids in the nature of water, waste water and industrial water, waste liquids, solvents, and paint; heating apparatus, namely, air heating apparatus, kilns, furnaces, water and steam heating apparatus, thermal liquids heating apparatus; steam generating apparatus, namely, boilers, heat recovery steam generators, steam generating and heating apparatus for industrial purposes; drying apparatus, namely, hot air dryers, hot gas dryers, heat exchange dryers, indirect heat dryers, industrial apparatus using gas or air for drying and cleaning components in the energy industrySECTION 8 - CANCELLEDOct 21, 2016
035business consulting services in the field of renewable energy, energy generating and controlling equipment, waste treatment equipment, steam generation, and combined heat and power applications; Renewable energy services, namely, providing business information in the field of renewable energy efficiency, energy generation efficiency, and energy efficiencySECTION 8 - CANCELLEDOct 21, 2016
037Construction, installation, maintenance and repair services of renewable energy equipment, energy generating and controlling equipment, waste treatment equipment, steam generation, and combined heat and power equipment, turbines and steam turbine equipment; renewable energy services, namely, installation, operations, repairs, maintenance, and overhauls of renewable energy power plantsSECTION 8 - CANCELLEDOct 21, 2016
040generation of power and electricity; energy production; energy production, namely, co-generation and tri-generation energy production in the nature of creating combined heat and power energy and the simultaneous generation of electricity and useful heating and cooling from the combustion of a biomass fuel; production of environmentally-friendly forms of energy and power; waste processing and treatment services; contract manufacturing in the field of renewable energy related products and resources; renewable energy services, namely, generation of renewable energy, processing of gas and liquid waste streams, production of distributed energy resources in the nature of power, heat, and cooling, combined heat and power generation, steam and heat generationSECTION 8 - CANCELLEDOct 21, 2016
042Engineering services; development of new technologies for others in the field of renewable energy related products and resources; renewable energy services, namely, technical planning of renewable energy based power plants; engineering and technical services in the nature of technical consultation in the field of waste processing, renewable power generation, combined heat and power applications; power plant engineering, namely, testing and evaluation of power plant equipment to improve performance and efficiency of such equipment; software design and developmentSECTION 8 - CANCELLEDOct 21, 2016

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 22, 2024C8..CANCELLED SEC. 8 (6-YR)—
Sep 27, 2023ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
May 8, 2023REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Apr 19, 2023ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jan 11, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 8, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 31, 2018SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Mar 30, 2018CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Mar 16, 2018SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Mar 16, 2018AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Feb 28, 2018IUAFUSE AMENDMENT FILED—
Feb 28, 2018EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Aug 30, 2017EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 28, 2017EX2GSOU EXTENSION 2 GRANTED—
Aug 28, 2017EXT2SOU EXTENSION 2 FILED—
Aug 28, 2017EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 2, 2017EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Feb 28, 2017EX1GSOU EXTENSION 1 GRANTED—
Feb 28, 2017EXT1SOU EXTENSION 1 FILED—
Feb 28, 2017EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Aug 30, 2016NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 5, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 5, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 15, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 1, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 1, 2016XAECEXAMINER'S AMENDMENT ENTERED—
Jun 1, 2016GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 1, 2016GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 1, 2016CNEAEXAMINERS AMENDMENT -WRITTEN—
May 11, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 10, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 10, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 10, 2015GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 10, 2015GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 10, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 4, 2015DOCKASSIGNED TO EXAMINER—
Jul 31, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 28, 2015NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance