Drawing for SAFE HAVEN

USPTO serial 86764477

SAFE HAVEN

Reviewed by CopyMark Law Group

Reg. 5080462Status 710
Filing date
Status date
Registration date
Nov 15, 2016
Examiner
FIONDA, LAURA ELIZABETH
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with SAFE HAVEN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Armored doors of metal; armoured doors of metal; Blast-resistant casement windows of metal for forced entry/ballistic resistant buildings; Blast-resistant doors and windows of metal for forced entry/ballistic resistant buildings; Blast-resistant doors of metal for forced entry/ballistic resistant buildings; fasteners of metal for blast-resistant casement windows for forced entry/ballistic resistant buildings; Fittings of metal for blast-resistant windows for forced entry/ballistic resistant buildings; Floating metal islands for commercial and industrial storage, platform, or shelter purposes; Metal components for blast-resistant metal protective and security window shutters for forced entry/ballistic resistant buildings, namely, slats, shutterboxes, side frames, end caps, crank handles, pull straps, side tracks, ball bearings and installation hardware, namely, rollers, rails, cables, carriers, pins, locks, clips, brackets and screws; blast-resistant metal interior storm windows for forced entry/ballistic resistant buildings; Metal shelter structures; Metal storage shelters; Metallic armoured doors; Metallic fire doors; Modular metallic buildings; Pre-fabricated houses of metal; Pre-fabricated metal houses for fire and blast resistant office/living quartersSECTION 8 - CANCELLEDOct 30, 1998
037Construction of facilities, structures, living quarters, and utility buildings, production modules and subsea modules in the oil and gas industry; Construction of modular buildingsSECTION 8 - CANCELLEDOct 30, 1998
040Custom manufacture of modular components for modular buildingsSECTION 8 - CANCELLEDOct 30, 1998
043Leasing of portable modular metal and modular non-metal structures for use as fire and blast resistant office/living quarters; Rental of portable modular buildingsSECTION 8 - CANCELLEDOct 30, 1998
045Analysis and consultation pertaining to job site safety; Consultation services concerning homeland safety and security issues; Consultation services in the field of the safety needs of commercial and industrial companies; Consulting in the field of workplace safety; Consulting services in the field of public safety; Consulting services in the field of state and federal regulatory compliance requirements for personnel safety; Providing information concerning homeland safety and security issuesSECTION 8 - CANCELLEDOct 30, 1998

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 26, 2023C8..CANCELLED SEC. 8 (6-YR)—
Nov 15, 2021REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Nov 15, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 30, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 30, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 10, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 26, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 24, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 19, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 19, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 13, 2016ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jun 20, 2016GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jun 20, 2016GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 20, 2016CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 13, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 13, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 9, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 11, 2016CEPECOMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED—
Jan 11, 2016ALIEASSIGNED TO LIE—
Jan 9, 2016GEANNOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Jan 9, 2016GEAPEXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Jan 9, 2016CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED—
Jan 9, 2016DOCKASSIGNED TO EXAMINER—
Sep 28, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 25, 2015NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance