USPTO serial 86797007
F-WAVE
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- DINALLO, KEVIN M
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with F-WAVE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Albany Auckland, NZ
Albany Auckland, NZ
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Mark J. Diliberti
MARK J. DILIBERTI FOLEY & LARDNER LLP777 E. WISCONSIN AVE.MILWAUKEE, WI 53202UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 011 | Apparatus and equipment for lighting, heating, refrigerating, air-conditioning and drying, namely, solar reactors, solar powered lamps, solar water heaters, solar thermal installations being solar thermal modules, solar heat collection panels, solar powered cooling units, solar energy based cooling apparatus, solar thermal air systems for heating purposes, heat pumps, heat exchangers not being parts of machines, water heaters, heating systems for residential and commercial buildings comprised of boilers, valves, pipes, manifolds, solar panels, control panels, and switches all sold as a unit; solar and thermal collectors, energy receivers, reflectors in the nature of solar thermal modules and solar compound parabolic concentrators for concentrating and reflecting solar rays; solar and thermal heat collection panels for use in heating | ACTIVE | — |
| 019 | Portable non-metallic buildings; prefabricated non-metallic buildings; non-metallic building materials, namely, soffits, fascias, non-metal ceiling boards and non-metal floor boards, wall panels and building flashing; non-metallic roofing materials including those incorporating photovoltaic cells, modules, inverters, panels, wafers, reflectors and collectors, namely, flashing, trusses, coverings, gutters, tiles, panels and hips; non-metallic masonry storage tanks | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 24, 2019 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Jun 24, 2019 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Nov 15, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Nov 14, 2018 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Nov 14, 2018 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Nov 8, 2018 | EXT5 | SOU EXTENSION 5 FILED | — |
| Nov 8, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| May 25, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| May 23, 2018 | EX4G | SOU EXTENSION 4 GRANTED | — |
| May 23, 2018 | EXT4 | SOU EXTENSION 4 FILED | — |
| May 23, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Nov 14, 2017 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Nov 10, 2017 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Nov 10, 2017 | EXT3 | SOU EXTENSION 3 FILED | — |
| Nov 10, 2017 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| May 16, 2017 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| May 12, 2017 | EX2G | SOU EXTENSION 2 GRANTED | — |
| May 12, 2017 | EXT2 | SOU EXTENSION 2 FILED | — |
| May 12, 2017 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 13, 2016 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 11, 2016 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Oct 11, 2016 | EXT1 | SOU EXTENSION 1 FILED | — |
| Oct 11, 2016 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| May 24, 2016 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 29, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 29, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 9, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 22, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 16, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 28, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 27, 2015 | NWAP | NEW APPLICATION ENTERED | — |