Drawing for IOTALK

USPTO serial 86799325

IOTALK

Reviewed by CopyMark Law Group

Reg. 5201926Status 710
Filing date
Status date
Registration date
May 9, 2017
Examiner
GAGLIARDI, JEANINE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with IOTALK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael T. Smith

Michael T. Smith BIRCH STEWART KOLASCH & BIRCH LLP8110 GATEHOUSE RD SUITE 100EFALLS CHURCH, VA 22042UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Motion recognizing sensors in the nature of motion detectors; Gyro sensors using GPS functions for measuring movement; Invader detecting sensors in the nature of alarm sensors; Alarm sensors for refrigerators' operation, temperature, and humidity; Alarm sensors for washing machines' temperature and humidity; Digital sensors for detecting light, sound and motion; Sensor electric controllers; Pressure sensors; Electric or electronic instrument sensors for measuring, detecting light, sound and motion; Window opening and closing detecting sensors in the nature of motion detectors; Object detecting sensors in the nature of motion detectors; Door opening and closing detecting sensors in the nature of motion detectors; Multi-function touch buttons in the nature of computer peripherals for inputting data into computers; Battery charge devices, namely, battery chargers; Chargeable batteries; Battery compensation chargers, namely, wireless battery chargers; 3D spectacles; Digital cameras; Network monitoring cameras; Oscillation sensor devices, namely, electric or electronic sensors for detecting light, sound and motion; Range sensor, namely, electric or electronic sensors for detecting light, sound and motion; Air pollution measuring devices, namely, particle counters; Measuring and control mobile devices for air conditioning technology, namely, particle counters; Air quality measuring apparatus, namely, particle counters; Dust measuring apparatus, namely, particle counters; Weight scales not for medical purposes; Measuring apparatus not for medical purposes, namely, rain gauges, bevels, digitizers; Automatic pressure control machines and instruments; Light switches; Electric power distribution units; Apparatus for improving power efficiency, namely, testing and measuring equipment for testing efficiency of power plant equipment; Apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; Lighting control apparatus; Apparatus for diagnosing electrical power installations, namely, testing equipment for use in testing the performance and efficiency of power plant equipment; Apparatus for measuring, monitoring, and analyzing electricity consumption, namely, electric sensors; Electric wire and cable; Electric plugs; Electric connectors, namely, sockets and plugs; Solar cell wafer; Modules for photovoltaic power generation; Solar wafers; Solar batteries; Crystalline silicon solar power cells; Solar cell plates; Solar cell panels for production of electricity; Solar power panel for electricity generation; Solar panels for electricity generation; Solar panels for the production of electricity; Inverter used in solar power generation; Accumulators for photovoltaic power; Electric control devices for heating and energy managementSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 24, 2023C8..CANCELLED SEC. 8 (6-YR)—
May 9, 2022REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Aug 7, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 7, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 7, 2020EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Aug 7, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 7, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 7, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jul 9, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 9, 2017R.SRREGISTERED-SUPPLEMENTAL REGISTERYour mark is registered on the Supplemental Register, which is available for marks that are not yet distinctive enough for the Principal Register but can still identify a source. Protection is more limited than Principal Register registration but can later support a Principal Register application.
Mar 31, 2017PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 30, 2017CNTAAPPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER—
Mar 29, 2017XAECEXAMINER'S AMENDMENT ENTERED—
Mar 29, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 29, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 29, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 24, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 24, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 16, 2017ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Sep 20, 2016GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Sep 20, 2016GNSLLETTER OF SUSPENSION E-MAILED—
Sep 20, 2016CNSLSUSPENSION LETTER WRITTEN—
Sep 2, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 2, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 1, 2016ALIEASSIGNED TO LIE—
Aug 24, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 24, 2016GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 24, 2016GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 24, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 17, 2016DOCKASSIGNED TO EXAMINER—
Oct 30, 2015MPMKNOTICE OF PSEUDO MARK E-MAILED—
Oct 29, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 29, 2015NWAPNEW APPLICATION ENTERED—