USPTO serial 86801025
MAKE POSSIBLE
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- May 7, 2019
- Examiner
- MITTLER,KEVIN A
- Law office
- Historical data usage
What this means
Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.
Need help with MAKE POSSIBLE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Anthony J. Malutta
Anthony J. Malutta KILPATRICK TOWNSEND & STOCKTON LLPTwo Embarcadero Center, Suite 1900San Francisco, CA 94111United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Semiconductor wafer processing equipment; Semiconductor wafer processing components, namely, epitaxial chemical reactors, chemical vapor deposition reactors, physical vapor deposition reactors, all reactors for industrial use, ion implanting machines, and operational software sold as a component of the foregoing, all for the processing and production of semiconductor substrates, thin films, silicon discs and wafers; equipment and systems comprised of manufacturing and assembling machinery for making flat panel display screens; plasma etching machines and chemical mechanical polishing devices; equipment and systems for the generation and transformation of electricity from solar energy comprised of construction and manufacturing machinery and instruments for making solar instruments and materials, namely, photovoltaic solar generators, photovoltaic solar cells, inverters, direct current cables and solar radiation-related monitoring and tracking devices | ACTIVE | — |
| 009 | Electron microscopes; integrated circuits; flat panel display screens; computer software for use in diagnostic and fault detection of semiconductor wafers and photovoltaic cells; electronic imaging platforms in the field of inspection of semiconductor materials, namely, semiconductor wafers and photovoltaic cells; electronic apparatus for measuring and testing semiconductor wafers and photovoltaic cells; solar cells; electronic sensors for measuring solar radiation; photovoltaic cells and modules | ACTIVE | — |
| 037 | Maintenance and repair of semiconductor processing and production equipment; maintenance and repair of solar production equipment | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Applied Materials, Inc.
- Other trademarks owned by Applied Materials, Inc.
- Other trademarks owned by Applied Materials, Inc.
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 037
- Similar marks named MAKE POSSIBLE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 20, 2026 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jan 20, 2026 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jan 20, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 15, 2025 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| May 7, 2024 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| May 7, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 2, 2019 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Mar 31, 2019 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Mar 30, 2019 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Mar 28, 2019 | IUAF | USE AMENDMENT FILED | — |
| Mar 28, 2019 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Oct 10, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 9, 2018 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Oct 9, 2018 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Oct 1, 2018 | EXT5 | SOU EXTENSION 5 FILED | — |
| Oct 1, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 24, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 22, 2018 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Mar 22, 2018 | EXT4 | SOU EXTENSION 4 FILED | — |
| Mar 22, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 22, 2017 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 18, 2017 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Aug 18, 2017 | EXT3 | SOU EXTENSION 3 FILED | — |
| Aug 18, 2017 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 24, 2017 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 20, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 20, 2017 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jan 20, 2017 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jan 20, 2017 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Nov 2, 2016 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 13, 2016 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 11, 2016 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Aug 11, 2016 | EXT1 | SOU EXTENSION 1 FILED | — |
| Aug 11, 2016 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 11, 2016 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 29, 2016 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Feb 2, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 2, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 13, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 25, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 16, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 30, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 30, 2015 | NWAP | NEW APPLICATION ENTERED | — |