Drawing for CYMIC

USPTO serial 86819277

CYMIC

Reviewed by CopyMark Law Group

Reg. 5089392Status 710
Filing date
Status date
Registration date
Nov 29, 2016
Examiner
CHHINA, KARANENDRA S
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with CYMIC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John C. Holman

400 7TH ST., NW, STE. 700WASHINGTON, DC 20004UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
011Industrial boilers; industrial boilers in the nature of circulating fluidized bed boilersSECTION 8 - CANCELLED—
037Building construction services; installation, maintenance and repair services of industrial boilers; replacement of components and parts for industrial boilers; rebuilding of industrial boilers; inspection services for monitoring the condition and function of industrial boilers in the course of construction, use and maintenance of industrial boilersSECTION 8 - CANCELLED—
042Scientific and industrial research for others in the field of industrial boilers and energy production; design and development of industrial boilers; design and development of machines and industrial processes for industrial boilers in energy production industry; engineering services and technical consultation in the field of power generation and energy production; monitoring, inspection and remote diagnosis for quality control relating to the condition and function of industrial boilersSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 9, 2023C8..CANCELLED SEC. 8 (6-YR)—
Nov 29, 2021REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Nov 29, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 25, 2016DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Oct 21, 2016AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Oct 3, 2016IUCNNOTICE OF ALLOWANCE CANCELLED—
Oct 3, 2016D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Jun 14, 2016NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Apr 19, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 19, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 30, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 11, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 8, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 7, 2016DOCKASSIGNED TO EXAMINER—
Jan 19, 2016AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Jan 9, 2016ALIEASSIGNED TO LIE—
Dec 18, 2015PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Nov 18, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 17, 2015NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance