Drawing for DOVER ENERGY

USPTO serial 86848015

DOVER ENERGY

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
SINGLETON, RUDY
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with DOVER ENERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Cynthia Johnson Walden

CYNTHIA JOHNSON WALDEN FISH & RICHARDSON P.C.PO BOX 1022MINNEAPOLIS, MN 55440-1022UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Metal goods, namely, metal flanges, metal pipe couplings and joints, metal swivel joints, metal valves; metal pipe fittings, metal pipes and connectors; metal manually operated check valves and butterfly valves, not being parts of machines; bottom loader assemblies, namely, metal pipes that connect a movable tank to a fixed storage tank or similar to allow for the transfer of fluids; tank car loading and unloading connections, namely, metal pipes and couplings; metal piping systems for transfer of chemicals comprising swivel joints, pipes, tubes, elbows, flanges, fluid couplings; loading and unloading fluid piping systems of metal comprising swivel joints, pipes, tubes, elbows, flanges, fluid couplings; metal slide sleeve loading arms; metal swivel hose connectors; metal coupling assemblies; metal drop tubes not being equipment for treating groundwater and soil; metal dust caps used as a component part of metal piping systems; metal ventilating ducts; non-automatic gasoline dispensing nozzles and parts therefor, namely, swivels and breakaways; high and low pressure and temperature metal sealing couplings and connectors; metal pipes, metal plugs and chainsACTIVE—
007Machine parts in the nature of integral components to heat and maintain temperature in piping systems, namely, metal steam jacketing, vapor recovery fittings, namely, plates, cones and plugs, suction line strainers, all the above goods being made of metal; machinery components used for lifting, hoisting, drilling and moving large pieces of machinery and equipment, namely, hydraulic motors, brakes, winches, speed reducers and multi-disk wet brakes; fabricated and specialty planetary gear components for machines used in the utility, towing and recovering, military, construction, marine, petroleum, railroad, mining, timber, crane and truck equipment market segments, namely, combination winch and bumpers, fairleads, and highway guardrail post drivers; gear reducers; winches and structural parts therefor; gearboxes for land construction equipment other than for land vehicles; polycrystalline diamond machine tools for use in drilling, cutting, and machining, namely, cutters and compacting machines; bearings, as parts of machines; machine parts, namely, bearing housings, bearing inserts, bushings; pressure relief valves, check valves and loading and unloading valves, being parts of machines, all composed of metal, for tank cars, trucks, barges and stationary and intermodal tanks; machine parts, namely, lift assisters for manway covers; metal valve caps for machinesACTIVE—
009Automatic control valves and liquid level controllers; pneumatic and electric liquid level switches; automatic pressure control machines; temperature controllers for monitoring, controlling, and switching hydraulic or pneumatic systems; pressure relief valves for rail cars and fixed tanks; site flow indicators; pressure isolation rings; level indicators, level switches and level gauges; vacuum breaker, namely, a pressure relief valve for rail cars and fixed tanks; electronic controls used in liquid handling, liquid handling equipment, and vapor recovery equipment; electric adaptors and plugs; automatic valves; automatic gasoline dispensing nozzles not being parts of engines or machines and parts therefor, namely, swivels and breakaways; industrial control valves and electric actuators therefor for use in controlling discharge of materials from truck trailer tanks; automatic valves and control valves for regulating the flow of gases and liquids; automatic liquid level gauges, liquid level controls and liquid level alarms, all for tanks cars, trucks, barges and stationary and intermodal tanks; electronic measuring, reference and calibration apparatus and instruments for use in sensing and measuring pressure and temperature, namely, quartz pressure transducers and accessories, namely, interfaces for transducers, isolator modules, sealing cones, resonators, and temperature sensor crystals; computer monitors and flat panel display screens; electronic components for industrial machinery, namely, indicators for use in monitoring load capacity of industrial machinery; electronic capacity indicators for industrial machinery and the percentage of that capacity being used; machine operator aids and warning systems primarily comprised of emergency warning lights, electronic warning bells, mounted video display monitors, electrical, electronic, and radio-controlled switches, sensors and computerized controls for crane systems; electrical, electronic, and radio-controlled devices for signaling, monitoring and metering for crane systems, namely, load cells, angle indicators, angle transmitters, load indicators, display panels, liquid crystal displays, tensiometers, rotation indicators, anti two-block systems consisting of sensors, transmitters, receivers, alarms, motion cut relays, motion cut valves and switches, anti two-block alarms, radio signal receivers, boom head transmitting radios, motion cut valves, and electrical, electronic, and radio-operated alarmsACTIVE—
042Design and development of loading and coupling systems for loading and unloading of all types of critical hazardous fluids and hazardous bulk products; design and engineering of high-quality components used for clean energy fueling applications, such as CNG (compressed natural gas), Hydrogen and LPG (liquefied petroleum gas) on vehicles and dispensing systems; design of above ground fueling products and systems, namely, conventional, vacuum-assist, balance vapor recovery and manual dispensing nozzles, breakaways, hose swivels, and swivel breakaways; design of a wide array of below ground fueling products and systems, namely, integrated underground fuel transfer and containment systems, flexible coaxial primary pipe and fittings, tank and dispenser sumps and pans, remote fill sumps, special application sumps, quick connect dispenser sumps, spill containers, monitoring and fill pipe connection equipment, overfill prevention valves and emergency shut-off valves; design of automated fuel control systems and tank gaugesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Aug 20, 2018MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Aug 20, 2018ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Jan 20, 2018EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 18, 2018EX3GSOU EXTENSION 3 GRANTED—
Jan 18, 2018EXT3SOU EXTENSION 3 FILED—
Jan 18, 2018EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 18, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 3, 2017EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 1, 2017EX2GSOU EXTENSION 2 GRANTED—
Jun 1, 2017EXT2SOU EXTENSION 2 FILED—
Jun 1, 2017EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 6, 2017EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 4, 2017EX1GSOU EXTENSION 1 GRANTED—
Jan 4, 2017EXT1SOU EXTENSION 1 FILED—
Jan 4, 2017EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 19, 2016NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 24, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 24, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 4, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 20, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 14, 2016ALIEASSIGNED TO LIE—
Mar 29, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 29, 2016XAECEXAMINER'S AMENDMENT ENTERED—
Mar 29, 2016GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 29, 2016GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 29, 2016CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 28, 2016DOCKASSIGNED TO EXAMINER—
Jan 20, 2016TAEATEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED—
Jan 20, 2016PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Dec 18, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 17, 2015NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance