Drawing for BUILDING WITHOUT THE BULLSHIT.

USPTO serial 86861578

BUILDING WITHOUT THE BULLSHIT.

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
HABEEB, MYRIAH A
Law office
TMO LAW OFFICE 113 - SENIOR ATTORNEY

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with BUILDING WITHOUT THE BULLSHIT.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Building construction; Building construction and repair; Building construction services; Building construction supervision; Building construction, remodeling and repair; Building maintenance and repair; Building of shops; Building restoration; Constructing decks; Constructing porches; Constructing sunrooms; Construction and renovation of buildings; Construction and repair of buildings; Construction consultancy; Construction consultation; Construction management; Construction of buildings; Construction of Residential Buildings and Interiors, Commercial Buildings and Interiors, Retail Spaces, Interior Renovations and Apartment Renovations; Construction planning; Construction project management services; Construction services, namely, planning, laying out and custom construction of residential and commercial communities; Construction services, namely, planning, laying out and custom construction of commercial buildings; Construction supervision; Construction, maintenance and renovation of property; Renovation and restoration of buildings; Renovation in the field of Residential Buildings and Interiors, Commercial Buildings and Interiors, Retail Spaces, Interior Renovations and Apartment Renovations; Building construction; Building construction and repair; Building construction information; Building construction services; Building construction supervision; Building construction, remodeling and repair; Building inspection; Construction and renovation of buildings; Construction and renovation of buildings; Construction and repair of buildings; Construction of buildings; Construction services, namely, planning, laying out and custom construction of commercial buildings; Construction, maintenance and renovation of property; Consultation in building construction supervision; Consultation in building construction supervision; Consultation relating to painting of buildings; Consulting in the field of building construction; Consulting in the field of building construction; Contractor services, namely, review of and remedial recommendations for building plumbing, electrical and mechanical systems for others; Custom construction and building renovation; Custom construction of homes; Custom construction and building renovation; Custom construction and building renovation; General building contractor services; General construction contracting; General construction contracting; General contractor services, namely, plumbing, heating and air conditioning, carpentry, drywall, painting, electrical, building and framing contractor services; Handyman service, namely, building repair and maintenance; House building and repair; Housing services, namely, development of real property, namely, repair, improvement, and new construction; Housing services, namely, repair, improvement, and construction of residential real property; Maintenance and repair of buildings; Real estate development and construction of commercial, residential and hotel property; Refurbishment of buildings; Repair of buildings; Residential and building construction consulting; Residential and building construction consulting; Residential and commercial building construction; Residential and commercial building construction; Self-perform construction skilled trades, namely, concrete work, carpentry and selective demolition services; Technical consultation in the field of building construction; Technical consultation in the field of building constructionACTIVESep 15, 2015

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Jan 18, 2017MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jan 17, 2017MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jan 17, 2017ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
May 15, 2016GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 15, 2016GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 15, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 23, 2016DOCKASSIGNED TO EXAMINER—
Jan 23, 2016DOCKASSIGNED TO EXAMINER—
Jan 8, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 2, 2016NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance