USPTO serial 86895534
DOMIDO
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- BULLOFF, TOBY ELLEN
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with DOMIDO?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Anna Vishev
ANNA VISHEV LAW OFFICE OF ANNA VISHEV P.C.44 CORTELYOU AVENUESTATEN ISLAND, NY 10312UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 019 | Non-metallic beams; concrete; non-metallic bars for reinforcing building construction; geotextiles, namely, fabrics for use in civil engineering and building construction; clay slabs; granite; non-metallic doors; assembled houses, namely, ready-to-assemble prefabricated non-metal house kits; limestone; building stone; non-metallic door and window frames; prefabricated cement architectural columns; non-metallic structures, namely, non-metal shelter structures; mobile non-metallic structures, namely, non-metal mobile homes; non-metallic reinforced construction materials, namely, fiberglass panels and non-metal flooring materials; bitumen construction materials, namely, asphalt and roof coatings; viscous construction materials, namely, asphalt and asphalted roofing paper; non-metallic construction materials, namely, fiberglass panels and non-metal flooring materials; non-metallic wall cladding construction materials; non-metallic windows; non-metallic form-work for concrete; non-metallic supports; non-metallic wall panels; non-metallic building panels; prefabricated non-metallic platforms; slabs of cement-based materials; fireproof cement coatings; non-metallic construction coatings for roofs, walls and floors; mortars; non-metallic pillars for building; cements; concrete construction components, namely, concrete slabs and beams | ACTIVE | — |
| 037 | Construction services, namely, sealing and insulation of buildings, providing information and advising on repairs and construction, managing and supervising construction work, providing masonry work and construction of industrial plants; building construction; installation of modular construction units | ACTIVE | — |
| 040 | Electroplating; providing information on materials' processing; assembly of modular construction units for others | ACTIVE | — |
| 042 | Analysis of computer systems; architectural services; recovery of computer data; industrial design; examination of technical projects, namely, computer software and engineering project management; engineering services; software installation; research and development of new products for third parties; technical research in the field of engineering and computer software; consultation in the design and development of computer hardware; advising on software; software upgrading services; remote monitoring of computer systems; software maintenance; design of computer systems; drafting of construction plans; software development; programming for computers; industrial design services, namely, image creation | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by FOAMPAX LIMITED
- Other trademarks owned by FOAMPAX LIMITED
- Other trademarks in Class 019
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named DOMIDO
- Prosecution event MAB6 explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 23, 2019 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Sep 23, 2019 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Feb 23, 2019 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 22, 2019 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Feb 20, 2019 | EXT5 | SOU EXTENSION 5 FILED | — |
| Feb 20, 2019 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 25, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 23, 2018 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Aug 23, 2018 | EXT4 | SOU EXTENSION 4 FILED | — |
| Aug 23, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 22, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 20, 2018 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Feb 20, 2018 | EXT3 | SOU EXTENSION 3 FILED | — |
| Feb 20, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 19, 2017 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 17, 2017 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Aug 17, 2017 | EXT2 | SOU EXTENSION 2 FILED | — |
| Aug 17, 2017 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 26, 2017 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 25, 2017 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Apr 16, 2017 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Mar 30, 2017 | NREV | NOTICE OF REVIVAL - E-MAILED | — |
| Mar 30, 2017 | TPEX | SOU EXTENSION RECEIVED WITH TEAS PETITION | — |
| Mar 30, 2017 | PETG | PETITION TO REVIVE-GRANTED | — |
| Mar 30, 2017 | PROA | TEAS PETITION TO REVIVE RECEIVED | — |
| Mar 27, 2017 | MAB6 | ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Mar 27, 2017 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Feb 23, 2017 | EXT1 | SOU EXTENSION 1 FILED | — |
| Aug 23, 2016 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 28, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 28, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 8, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 23, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 23, 2016 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 23, 2016 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 23, 2016 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 23, 2016 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 19, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 9, 2016 | MPMK | NOTICE OF PSEUDO MARK E-MAILED | — |
| Feb 8, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 6, 2016 | NWAP | NEW APPLICATION ENTERED | — |