Drawing for DOMIDO

USPTO serial 86895534

DOMIDO

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
BULLOFF, TOBY ELLEN
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with DOMIDO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Anna Vishev

ANNA VISHEV LAW OFFICE OF ANNA VISHEV P.C.44 CORTELYOU AVENUESTATEN ISLAND, NY 10312UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
019Non-metallic beams; concrete; non-metallic bars for reinforcing building construction; geotextiles, namely, fabrics for use in civil engineering and building construction; clay slabs; granite; non-metallic doors; assembled houses, namely, ready-to-assemble prefabricated non-metal house kits; limestone; building stone; non-metallic door and window frames; prefabricated cement architectural columns; non-metallic structures, namely, non-metal shelter structures; mobile non-metallic structures, namely, non-metal mobile homes; non-metallic reinforced construction materials, namely, fiberglass panels and non-metal flooring materials; bitumen construction materials, namely, asphalt and roof coatings; viscous construction materials, namely, asphalt and asphalted roofing paper; non-metallic construction materials, namely, fiberglass panels and non-metal flooring materials; non-metallic wall cladding construction materials; non-metallic windows; non-metallic form-work for concrete; non-metallic supports; non-metallic wall panels; non-metallic building panels; prefabricated non-metallic platforms; slabs of cement-based materials; fireproof cement coatings; non-metallic construction coatings for roofs, walls and floors; mortars; non-metallic pillars for building; cements; concrete construction components, namely, concrete slabs and beamsACTIVE—
037Construction services, namely, sealing and insulation of buildings, providing information and advising on repairs and construction, managing and supervising construction work, providing masonry work and construction of industrial plants; building construction; installation of modular construction unitsACTIVE—
040Electroplating; providing information on materials' processing; assembly of modular construction units for othersACTIVE—
042Analysis of computer systems; architectural services; recovery of computer data; industrial design; examination of technical projects, namely, computer software and engineering project management; engineering services; software installation; research and development of new products for third parties; technical research in the field of engineering and computer software; consultation in the design and development of computer hardware; advising on software; software upgrading services; remote monitoring of computer systems; software maintenance; design of computer systems; drafting of construction plans; software development; programming for computers; industrial design services, namely, image creationACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Sep 23, 2019MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Sep 23, 2019ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Feb 23, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Feb 22, 2019EX5GSOU EXTENSION 5 GRANTED—
Feb 20, 2019EXT5SOU EXTENSION 5 FILED—
Feb 20, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Aug 25, 2018EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 23, 2018EX4GSOU EXTENSION 4 GRANTED—
Aug 23, 2018EXT4SOU EXTENSION 4 FILED—
Aug 23, 2018EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 22, 2018EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Feb 20, 2018EX3GSOU EXTENSION 3 GRANTED—
Feb 20, 2018EXT3SOU EXTENSION 3 FILED—
Feb 20, 2018EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Aug 19, 2017EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 17, 2017EX2GSOU EXTENSION 2 GRANTED—
Aug 17, 2017EXT2SOU EXTENSION 2 FILED—
Aug 17, 2017EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 26, 2017EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 25, 2017EX1GSOU EXTENSION 1 GRANTED—
Apr 16, 2017AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Mar 30, 2017NREVNOTICE OF REVIVAL - E-MAILED—
Mar 30, 2017TPEXSOU EXTENSION RECEIVED WITH TEAS PETITION—
Mar 30, 2017PETGPETITION TO REVIVE-GRANTED—
Mar 30, 2017PROATEAS PETITION TO REVIVE RECEIVED—
Mar 27, 2017MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Mar 27, 2017ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Feb 23, 2017EXT1SOU EXTENSION 1 FILED—
Aug 23, 2016NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jun 28, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 28, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 8, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 23, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 23, 2016XAECEXAMINER'S AMENDMENT ENTERED—
May 23, 2016GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 23, 2016GNEAEXAMINERS AMENDMENT E-MAILED—
May 23, 2016CNEAEXAMINERS AMENDMENT -WRITTEN—
May 19, 2016DOCKASSIGNED TO EXAMINER—
Feb 9, 2016MPMKNOTICE OF PSEUDO MARK E-MAILED—
Feb 8, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 6, 2016NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance