Drawing for ACPLM ASPHALT & CONCRETE PARKING LOT MAINTENANCE

USPTO serial 86908621

ACPLM ASPHALT & CONCRETE PARKING LOT MAINTENANCE

Reviewed by CopyMark Law Group

Reg. 5194042Status 800Renewal
Filing date
Status date
Registration date
May 2, 2017
Examiner
MAKHDOOM, SAIMA
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with ACPLM ASPHALT & CONCRETE PARKING LOT MAINTENANCE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $299*

Plus Government fees of $650

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Herbert W. Larson

Herbert W. Larson LARSON & LARSON, P.A.11199 69TH STREET N.LARGO, FL 33773United States

Goods and services

ClassDescriptionStatusFirst use
037Asphalt installation, repair, maintenance and replacement services, namely, asphalt paving, asphalt overlay, asphalt sealcoating, and asphalt striping; Constructing grading services; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading and asphalt paving services; Construction services in the nature of concrete installation, repair, maintenance and replacement services, namely, road construction, road pavement, and concrete raising services; Concrete repair and asphalt repair services in the nature of installation, maintenance and repair of trenches, speed bumps, speed humps, sidewalks, curbs ramps, dumpster pads, drain boxes and parking lots; pavement stripping; paving contractor services; road sealing and stripping; road strippingACTIVEFeb 21, 2012

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 11, 2026NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED
Aug 11, 2026RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Aug 11, 202689AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Aug 11, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jun 15, 2026E89RTEAS SECTION 8 & 9 RECEIVED
May 2, 2026REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Jan 24, 2023NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Jan 24, 2023C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Jan 24, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jul 7, 2022E815TEAS SECTION 8 & 15 RECEIVED
May 2, 2022REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
May 2, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 14, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Feb 14, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 25, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jan 4, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Dec 5, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Dec 5, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 5, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 8, 2016GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 8, 2016GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 8, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 1, 2016DOCKASSIGNED TO EXAMINER
Feb 23, 2016MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED
Feb 22, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Feb 19, 2016NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance