USPTO serial 86933173
GIORDANO CONSTRUCTION INC.
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jan 3, 2017
- Examiner
- KOLODNER, LOUIS FRANCIS
- Law office
- TMO LAW OFFICE 122
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with GIORDANO CONSTRUCTION INC.?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $650
Owner
Giordano Construction Incorporated
Houston, TX, US
Other trademarks owned by Giordano Construction Incorporated
Giordano Construction Incorporated
Houston, TX, US
Other trademarks owned by Giordano Construction Incorporated
Giordano Construction Incorporated
Houston, TX, US
Other trademarks owned by Giordano Construction Incorporated
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Leela Madan
Leela Madan MADAN LAW PLLC4900 Woodway Dr., Ste. 675Houston, TX 77056UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Asphalting; Building construction, remodeling and repair; Concrete polishing; Concrete pouring and forming for buildings and other commercial or public concrete structures; Foundation contractor services; Hydrodemolition services; Painting of parking lots; Pavement marking services; Pavement sealing; Pavement striping; Paving contractor services; Repair of asphalt, concrete and cement surfaces; Repair, maintenance and modification of asphalt, concrete and cement surfaces; Road construction; Road paving; Road sealing and stripping; Road stripping; Soil erosion control services; Application of concrete coatings for beautification purposes; Building construction, remodeling and repair; Cement parging of interior and exterior stone block and concrete foundations; Construction of roads, underground utilities, and housing pads; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Installation, repair and replacement of asphalt, concrete and cement surfaces; Installation, maintenance and repair of asphalt, concrete and cement surfaces; Maintenance and/or repair of asphalt, concrete and cement surfaces; Scaffolding, earthworks or concrete construction; Self-perform construction skilled trades, namely, concrete work, carpentry and selective demolition services; Technical consultation in the field of building materials, namely, cementitious materials, asphalt and aggregates | ACTIVE | Nov 8, 2001 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Giordano Construction Incorporated
- Other trademarks owned by Giordano Construction Incorporated
- Other trademarks owned by Giordano Construction Incorporated
- Other trademarks in Class 037
- Similar marks named GIORDANO CONSTRUCTION INC.
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 7, 2026 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Jun 27, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 27, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 27, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 30, 2022 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Dec 30, 2022 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Dec 30, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 22, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 22, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 22, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 15, 2022 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jan 3, 2022 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Dec 12, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 12, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 3, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 18, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 18, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 28, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 9, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 11, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 10, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 10, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 29, 2016 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 29, 2016 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 29, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 20, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 14, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 11, 2016 | NWAP | NEW APPLICATION ENTERED | — |