Drawing for INNOVA

USPTO serial 86937199

INNOVA

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
ROBERTSON, DEIRDRE G
Law office
TMO LAW OFFICE 111 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with INNOVA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kimberley Cunningham

KIMBERLEY CUNNINGHAM BENNETT JONES LLP10020 - 100 ST, 3200 TELUS HOUSEEDMONTON, AB, T5J0N3CANADA

Goods and services

ClassDescriptionStatusFirst use
005Prefabricated and portable metal clad buildings used, namely, as industrial buildings to house equipment and to abate equipment noiseACTIVE—
007Combustion air intake and exhaust silencers for gas turbines; gas turbine combustion air inlet filter house; simple cycle catalyst systems for reducing carbon monoxide and nitrogen oxides emissions and minimizing ammonia slip in gas turbines used in power generation facilities comprised of combustion turbinesACTIVE—
011Inlet heating installations for modular and prefabricated buildings; ventilating intake and exhaust systems comprised of bypass stacks, diverter dampers, guillotine damper, vertical silencer ducts, exhaust stacks, bypass diverters, and exhaust diffuser and plenum, all sold as a unit; exhaust stacks and hot exhaust silencers, all part of ventilating exhaust and intake systems; waste heat recovery boilers for use in petrochemical plants and heat recovery steam generators to recover waste heat from gas turbines; diverter dampers in the nature of heat recovery steam generator of a gas turbine bypass system which allow workers at power generation facilities to perform maintenance to the heat recovery system without endangering workers to hot lethal gases, by diverting gases from the heat recovery steam generator and for controlled ramping up of the heat recovery steam generator and steam cycleACTIVE—
017Industrial acoustic noise barrier units for industrial facilities for retrofitting existing facilities, for power generation plants, for compressor, regulator, meter and pumping stations, namely, acoustic roofing panels, walls and wall barrier panels; industrial acoustic noise barrier systems for industrial facilities, for retrofitting existing facilities, for power generation plants, for compressor, regulator, meter and pumping stations, comprised of noise silencers in the nature of layered acoustical tiles, modular acoustical panels, acoustical insulation barrier panels, acoustical insulation for use in buildings, acoustical equipment enclosures, acoustical mechanical systems, acoustical doors and windows; acoustic building ventilation, namely, acoustic building heating, air conditioning and ventilation systems, comprised of acoustic noise silencers, mufflers and acoustic walls, noise and vibration dampening materialsACTIVE—
019Industrial acoustic noise barrier units for industrial facilities for retrofitting existing facilities, for power generation plants, for compressor, regulator, meter and pumping stations, namely, acoustic roofing panels, walls and wall barrier panels; industrial acoustic noise barrier systems for industrial facilities, for retrofitting existing facilities, for power generation plants, for compressor, regulator, meter and pumping stations, comprised of noise silencers in the nature of layered acoustical tiles, modular acoustical panels, acoustical insulation barrier panels, acoustical insulation for use in buildings, acoustical equipment enclosures, acoustical mechanical systems, acoustical doors and windows; acoustic building ventilation, namely, acoustic building heating, air conditioning and ventilation systems, comprised of acoustic noise silencers, mufflers and acoustic walls, noise and vibration dampening materialsACTIVE—
036Rental and leasing of acoustic equipment enclosure structures, gas compression equipment and facilities, and gas turbine systems for power generation, rental and leasing of catalytic reduction and oxidation units for treating and controlling emissionsACTIVE—
037Installation of prefabricated buildings and gas turbine systems at power plants; installation of interior acoustic and building enclosures, namely, walls, doors, roofs and windows and acoustic and modeling surveying; providing technical information about the construction of modular and prefabricated buildings, installation of building acoustics and noise reduction; maintenance of acoustic equipment enclosure structures; maintenance of catalytic reduction and oxidation units for treating and controlling emissions; turnkey services, namely, design, procurement, and construction of noise reduction systems, heat recovery systems, water delivery facilities, liquid and natural gas processing facilities, natural gas compression facilities and power generation facilities and associated infrastructure; procurement services for others; design, supply, fabrication and installation of natural gas and liquids processing facilities and infrastructure and power generation facilitiesACTIVE—
040Custom manufacture to the order and specification of others of modular and prefabricated buildings; modular and prefabricated gas processing units; modular and prefabricated power plantsACTIVE—
042Design and engineering services relating to prefabricated buildings; design of emissions management systems, waste heat recovery systems, gas turbine equipment and noise reduction systems, all for use with power plants, gas processing facilities and other industrial applications; industrial design, drafting, engineering, material testing, mechanical research, and technical research and development studies relating to silencing articles and structures, namely, layered acoustical assemblies, modular acoustical panel packages, acoustical barriers, acoustical buildings, acoustical equipment enclosures, acoustical mechanical systems, acoustical doors and windows; design of interior acoustic and building enclosures, namely, walls, doors, roofs and windows; operations services, namely, field engineering, inspection and testing of prefabricated buildings, catalytic reduction and oxidation units for treating and controlling emissions, gas processing equipment and facilities, acoustical systems, and power plant equipment and systemsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Nov 13, 2019MAB2ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Nov 13, 2019ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Apr 17, 2019GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Apr 17, 2019GNSIINQUIRY TO SUSPENSION E-MAILED—
Apr 17, 2019CNSISUSPENSION INQUIRY WRITTEN—
Oct 11, 2018GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Oct 11, 2018GNSLLETTER OF SUSPENSION E-MAILED—
Oct 11, 2018CNSLSUSPENSION LETTER WRITTEN—
Oct 10, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 10, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 5, 2018ALIEASSIGNED TO LIE—
Sep 26, 2018ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Apr 23, 2018GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Apr 23, 2018GNSIINQUIRY TO SUSPENSION E-MAILED—
Apr 23, 2018CNSISUSPENSION INQUIRY WRITTEN—
Oct 23, 2017GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Oct 23, 2017GNSLLETTER OF SUSPENSION E-MAILED—
Oct 23, 2017CNSLSUSPENSION LETTER WRITTEN—
Oct 23, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 23, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 16, 2017ALIEASSIGNED TO LIE—
Oct 4, 2017ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Apr 20, 2017GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Apr 20, 2017GNSIINQUIRY TO SUSPENSION E-MAILED—
Apr 20, 2017CNSISUSPENSION INQUIRY WRITTEN—
Apr 12, 2017ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Nov 4, 2016ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 4, 2016REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 20, 2016GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Oct 20, 2016GNSLLETTER OF SUSPENSION E-MAILED—
Oct 20, 2016CNSLSUSPENSION LETTER WRITTEN—
Oct 15, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 14, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 14, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 26, 2016LOPRLETTER OF PROTEST EVIDENCE REVIEWED-NO FURTHER ACTION TAKEN—
Aug 26, 2016LOPTLETTER OF PROTEST EVIDENCE FORWARDED—
Jun 23, 2016GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 23, 2016GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 23, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 23, 2016DOCKASSIGNED TO EXAMINER—
Mar 16, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 15, 2016NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance