USPTO serial 86937199
Reviewed by CopyMark Law Group
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Kimberley Cunningham
KIMBERLEY CUNNINGHAM BENNETT JONES LLP10020 - 100 ST, 3200 TELUS HOUSEEDMONTON, AB, T5J0N3CANADA| Class | Description | Status | First use |
|---|---|---|---|
| 005 | Prefabricated and portable metal clad buildings used, namely, as industrial buildings to house equipment and to abate equipment noise | ACTIVE | — |
| 007 | Combustion air intake and exhaust silencers for gas turbines; gas turbine combustion air inlet filter house; simple cycle catalyst systems for reducing carbon monoxide and nitrogen oxides emissions and minimizing ammonia slip in gas turbines used in power generation facilities comprised of combustion turbines | ACTIVE | — |
| 011 | Inlet heating installations for modular and prefabricated buildings; ventilating intake and exhaust systems comprised of bypass stacks, diverter dampers, guillotine damper, vertical silencer ducts, exhaust stacks, bypass diverters, and exhaust diffuser and plenum, all sold as a unit; exhaust stacks and hot exhaust silencers, all part of ventilating exhaust and intake systems; waste heat recovery boilers for use in petrochemical plants and heat recovery steam generators to recover waste heat from gas turbines; diverter dampers in the nature of heat recovery steam generator of a gas turbine bypass system which allow workers at power generation facilities to perform maintenance to the heat recovery system without endangering workers to hot lethal gases, by diverting gases from the heat recovery steam generator and for controlled ramping up of the heat recovery steam generator and steam cycle | ACTIVE | — |
| 017 | Industrial acoustic noise barrier units for industrial facilities for retrofitting existing facilities, for power generation plants, for compressor, regulator, meter and pumping stations, namely, acoustic roofing panels, walls and wall barrier panels; industrial acoustic noise barrier systems for industrial facilities, for retrofitting existing facilities, for power generation plants, for compressor, regulator, meter and pumping stations, comprised of noise silencers in the nature of layered acoustical tiles, modular acoustical panels, acoustical insulation barrier panels, acoustical insulation for use in buildings, acoustical equipment enclosures, acoustical mechanical systems, acoustical doors and windows; acoustic building ventilation, namely, acoustic building heating, air conditioning and ventilation systems, comprised of acoustic noise silencers, mufflers and acoustic walls, noise and vibration dampening materials | ACTIVE | — |
| 019 | Industrial acoustic noise barrier units for industrial facilities for retrofitting existing facilities, for power generation plants, for compressor, regulator, meter and pumping stations, namely, acoustic roofing panels, walls and wall barrier panels; industrial acoustic noise barrier systems for industrial facilities, for retrofitting existing facilities, for power generation plants, for compressor, regulator, meter and pumping stations, comprised of noise silencers in the nature of layered acoustical tiles, modular acoustical panels, acoustical insulation barrier panels, acoustical insulation for use in buildings, acoustical equipment enclosures, acoustical mechanical systems, acoustical doors and windows; acoustic building ventilation, namely, acoustic building heating, air conditioning and ventilation systems, comprised of acoustic noise silencers, mufflers and acoustic walls, noise and vibration dampening materials | ACTIVE | — |
| 036 | Rental and leasing of acoustic equipment enclosure structures, gas compression equipment and facilities, and gas turbine systems for power generation, rental and leasing of catalytic reduction and oxidation units for treating and controlling emissions | ACTIVE | — |
| 037 | Installation of prefabricated buildings and gas turbine systems at power plants; installation of interior acoustic and building enclosures, namely, walls, doors, roofs and windows and acoustic and modeling surveying; providing technical information about the construction of modular and prefabricated buildings, installation of building acoustics and noise reduction; maintenance of acoustic equipment enclosure structures; maintenance of catalytic reduction and oxidation units for treating and controlling emissions; turnkey services, namely, design, procurement, and construction of noise reduction systems, heat recovery systems, water delivery facilities, liquid and natural gas processing facilities, natural gas compression facilities and power generation facilities and associated infrastructure; procurement services for others; design, supply, fabrication and installation of natural gas and liquids processing facilities and infrastructure and power generation facilities | ACTIVE | — |
| 040 | Custom manufacture to the order and specification of others of modular and prefabricated buildings; modular and prefabricated gas processing units; modular and prefabricated power plants | ACTIVE | — |
| 042 | Design and engineering services relating to prefabricated buildings; design of emissions management systems, waste heat recovery systems, gas turbine equipment and noise reduction systems, all for use with power plants, gas processing facilities and other industrial applications; industrial design, drafting, engineering, material testing, mechanical research, and technical research and development studies relating to silencing articles and structures, namely, layered acoustical assemblies, modular acoustical panel packages, acoustical barriers, acoustical buildings, acoustical equipment enclosures, acoustical mechanical systems, acoustical doors and windows; design of interior acoustic and building enclosures, namely, walls, doors, roofs and windows; operations services, namely, field engineering, inspection and testing of prefabricated buildings, catalytic reduction and oxidation units for treating and controlling emissions, gas processing equipment and facilities, acoustical systems, and power plant equipment and systems | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 13, 2019 | MAB2 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Nov 13, 2019 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Apr 17, 2019 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Apr 17, 2019 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Apr 17, 2019 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Oct 11, 2018 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Oct 11, 2018 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Oct 11, 2018 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Oct 10, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 10, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 5, 2018 | ALIE | ASSIGNED TO LIE | — |
| Sep 26, 2018 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Apr 23, 2018 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Apr 23, 2018 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Apr 23, 2018 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Oct 23, 2017 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Oct 23, 2017 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Oct 23, 2017 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Oct 23, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 23, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 16, 2017 | ALIE | ASSIGNED TO LIE | — |
| Oct 4, 2017 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Apr 20, 2017 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Apr 20, 2017 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Apr 20, 2017 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Apr 12, 2017 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Nov 4, 2016 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 4, 2016 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 20, 2016 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Oct 20, 2016 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Oct 20, 2016 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Oct 15, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 14, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 14, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 26, 2016 | LOPR | LETTER OF PROTEST EVIDENCE REVIEWED-NO FURTHER ACTION TAKEN | — |
| Aug 26, 2016 | LOPT | LETTER OF PROTEST EVIDENCE FORWARDED | — |
| Jun 23, 2016 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 23, 2016 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 23, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 23, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 16, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 15, 2016 | NWAP | NEW APPLICATION ENTERED | — |