Drawing for E

USPTO serial 86970970

E

Reviewed by CopyMark Law Group

Reg. 6317946Status 700Renewal
Filing date
Status date
Registration date
Apr 13, 2021
Examiner
JENKINS JR, CHARLES L
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with E?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $2,493*

Plus Government fees of $2,275

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jaclyne D. Wallace

Jaclyne D. Wallace Foley & Lardner LLP321 North Clark Street, Suite 3000CHICAGO, IL 60654-4762United States

Goods and services

ClassDescriptionStatusFirst use
007fuel cell power generators; integrated fuel cell hybrid power generators; fuel cell power generators with integrated hydrogen generator; portable proton exchange membrane (PEM) fuel cell power generator with integrated hydrogen storage capacities for use in fuel management, thermal management, humidification, power conditioning, overall system monitoring and control and manufacturing; membranes for hydrogen fuel cells and water electrolyzers; hydrogen generatorsACTIVE—
009Integrated fuel cell power generating systems and subsystems comprising of fuel cell stacks, valves, pumps, compressors, pressure regulators, sensors, electronic controls, heat exchangers, hydrocarbon reformers, and fluid and heat transfer piping; hydrogen fuel cells; electricity-generating fuel cell power modules; Electrolysers; power controllers; automatic valves, electric switches and electric circuits; fuel cell test stations; automated fuel cell test stations; test stations for hydrogen generators; computer software for operating in fuel cell test stations; computer software for operating automated fuel cell test stations; computer software for operating hydrogen test stations; fuel cells; Fuel cell power systems comprised of fuel cell stacks; integrated fuel cell systems comprising fuel cells; anodes; hydrogen power storage systems; hydrogen power storage systems, namely, systems containing an electrolyzer for converting electrical energy to hydrogen gas, a means of storing the hydrogen and means for converting the hydrogen back to electrical energy; cathodesACTIVE—
011Hydrogen generators; hydrogen generator parts, namely, compressors for generators; electrolytic apparatus for generating hydrogen and oxygen; hydrogen dispensing equipment, namely, hydrogen generators; separators for use in water electrolyzers; Installations for generating hydrogen and oxygen from water and/or renewable electricity; plants for the generation of power; hydrogen purifiers; reactors for generating hydrogen as a fuel; hydrogen refuelers, namely, hydrogen refueling stations; hydrogen generator parts, namely, separators and membranes for generators, circulation frames for generators, end walls and boxes for generators, rectifying demisters for generators, gas liquid separators; rectifying demisters and parts and fittings for all the aforesaid goodsACTIVE—
035Management of energy production facilitiesACTIVE—
037Building, installation, and maintenance of hydrogen power and hydrogen powered products; installation and repair of fuel cell systems and hydrogen generators; operation of hydrogen refueling stations, namely, maintenance and installation of hydrogen refueling stationsACTIVE—
040Generation of Electricity; generation of power; custom manufacturing of industrial and commercial hydrogen systems; custom manufacturing of fuel cell systems and hydrogen generators; hydrogen generation services; manufacturing of fuel cell systems and hydrogen generatorsACTIVE—
042Engineering services in the field of electrical power and natural gas production; consulting services in the field of design and development of fuel cell test stations, fuel cells, integrated fuel cell systems and ancillary equipment; consultation, research and development and testing services related to hydrogen power and hydrogen powered products; fuel cell and hydrogen testing services; technical operation of hydrogen refueling stations; designing industrial and commercial hydrogen systems; designing, testing of fuel cell systems and hydrogen generators; designing and commissioning alternate energy systems; engineeringACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 13, 2026REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Nov 3, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 3, 2023ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Nov 3, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 3, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 3, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Nov 3, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 13, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 9, 2021DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Oct 8, 2020AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Aug 21, 2020IUCNNOTICE OF ALLOWANCE CANCELLED—
Aug 21, 2020D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Aug 19, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 19, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 19, 2020EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Aug 19, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 19, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 19, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Feb 25, 2020NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Dec 31, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 31, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 11, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 25, 2019FIXDELECTRONIC RECORD REVIEW COMPLETE—
Nov 22, 2019ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Nov 18, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 23, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 23, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 21, 2019ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Apr 27, 2019GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Apr 27, 2019GNSLLETTER OF SUSPENSION E-MAILED—
Apr 27, 2019CNSLSUSPENSION LETTER WRITTEN—
Apr 3, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 3, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 28, 2019ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Oct 9, 2018GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Oct 9, 2018GNSIINQUIRY TO SUSPENSION E-MAILED—
Oct 9, 2018CNSISUSPENSION INQUIRY WRITTEN—
Sep 17, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 17, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 14, 2018ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Mar 17, 2018GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Mar 17, 2018GNSLLETTER OF SUSPENSION E-MAILED—
Mar 17, 2018CNSLSUSPENSION LETTER WRITTEN—
Feb 21, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 21, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 20, 2018ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Oct 11, 2017GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Oct 11, 2017GNSIINQUIRY TO SUSPENSION E-MAILED—
Oct 11, 2017CNSISUSPENSION INQUIRY WRITTEN—
Sep 19, 2017RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Sep 19, 2017ALIEASSIGNED TO LIE—
Mar 6, 2017GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Mar 6, 2017GNSLLETTER OF SUSPENSION E-MAILED—
Mar 6, 2017CNSLSUSPENSION LETTER WRITTEN—
Feb 9, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 9, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 27, 2017ALIEASSIGNED TO LIE—
Jan 10, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 2, 2016GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 2, 2016GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 2, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2016DOCKASSIGNED TO EXAMINER—
Apr 16, 2016MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Apr 15, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—

Frequently asked questions

Related guidance