USPTO serial 86972777
V VERTIV
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- May 31, 2022
- Examiner
- RINKER, ANTHONY MICHAEL
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with V VERTIV?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Lisa M. DuRoss
Lisa M. DuRoss HARNESS, DICKEY & PIERCE, P.L.C.5445 CORPORATE DRIVE, SUITE 200TROY, MI 48098UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | metal panel systems comprising metal walls, ceiling, floor and door panels and metal mounting accessories therefor, namely, brackets, for use in controlling the flow of cooling air in data centers and computer rooms; metal cable trays; pre-fabricated metal buildings for data center applications; metal shelter structures for computer servers and electrical and electronic equipment | ACTIVE | Nov 14, 2017 |
| 009 | electric control panels for monitoring electrical and battery back-up power system critical system alarms; amplifiers; automatic transfer switches; electrical switchboards; batteries; battery and uninterruptible electrical power supply monitoring systems, namely, microprocessor based hardware and software used to monitor and test the status of battery backup and uninterruptible electrical power supply systems; battery backup power systems; battery racks; computer hardware and peripherals for remote access and control of computers; computer hardware and peripherals, namely, keyboard-video-mouse (KVM) and serial console switches; condensers; capacitors; controllers for power supplies; cooling devices for computer hardware and telecommunication equipment, namely, internal cooling fans; computer hardware and software for data center infrastructure configuration and management; data center and computer room infrastructure management systems comprised primarily of uninterruptible power supplies, electronic controller for controlling air conditioning and temperature, air flow sensors, software for monitoring data center and computer room infrastructure equipment, and also containing a cooling system comprised primarily of air cooling apparatus, cooling evaporators, air conditioning units, electric fans, water cooling towers and associated electronic fan controls, air conditioning controls and power controllers, cabinets specially adapted for computer hardware equipment, and racks, curtains, doors and containment panels for use with computer systems, all sold together as a unit; data center monitoring and control systems, namely, microprocessor based hardware and software used to monitor and control electrical and electronic equipment, and climate conditions in a data center, telecommunication center, computer room or electronic equipment room environment; electric control switches; electric power converters; electric power monitoring and control systems, namely, microprocessor based hardware and software used to monitor the status and control electrical power systems, power transfer switches, electric power load banks, electric power distribution units, battery systems and uninterruptible electrical power supply systems; electrical power control systems, namely, paralleling switchgears; electrical power distribution units; electrical power load banks, namely, electrical power distribution units; electrical power transfer switches; electronic controls for server racks and data center cooling units; enclosures, cabinets and racks for computer servers and electrical and electronic equipment; fan trays for cooling of telecommunication devices; electronic controllers for fire pumps; electronic thermostat regulating devices for control of heat; climate control and cooling systems for telecom and data communication equipment, consisting of thermostats for cooling equipment and a programmable logic controller (PLC); inverters; microprocessor based hardware and software used to monitor and control cooling and air handler units for data centers and other computer and telecommunications equipment applications; electronic monitoring devices for fire pumps; power line conditioners; power line conditioning equipment, namely, line filters, transformers, amplifiers; electric power conversion devices; electric power converters; electrical power distribution units; power dividers, namely, electric switches; power supplies; power switches; rectifiers; regulating apparatus for electric power; electric regulating apparatus for the operation of power systems; regulators for phase shifting of communication signal regulators for phase shifting of electronic signals; remote electrical power control switches; remote controllers for power supplies; server rack monitoring systems, namely, microprocessor based hardware and software used to monitor the status of electronic and electrical equipment in a server rack; computer server racks; computer server racks incorporating integrated cooling units; electric luminescent display panels; software for data center infrastructure configuration and management; testing apparatus not for medical purposes, namely, testing apparatus for batteries; automatic transfer switches (ATS); transformers; uninterruptible electrical power supplies; voltage regulators; voltage surge protectors; voltage surge suppressors; voltmeters | ACTIVE | May 1, 2017 |
| 011 | air handlers for cooling data centers; cooling units and systems comprised of cooling units and air conditioners for computer server racks and computer data centers; cooling units for computers and computer rooms; air conditioning condensers for use in cooling data centers, computer rooms and other computer and electronic equipment applications; dehumidifiers for use in cooling data centers, computer rooms and other computer and electronic equipment applications | ACTIVE | May 19, 2017 |
| 019 | non-metal shelter structures for computer servers and electrical and electronic equipment | ACTIVE | Jun 27, 2017 |
| 037 | installation, maintenance and repair of data center cooling systems; installation, maintenance and repair of power generating, computer and telecommunications equipment; installation, maintenance and repair of computer room air conditioning (CRAC) systems; installation, repair and maintenance of batteries; installation, repair and maintenance of electrical power systems; installation, repair and maintenance of batteries and fuel cells for electrical power systems; maintenance and preventive maintenance services of air conditioning for data centers and computer rooms; installation of electrical power systems for computer and telecommunications network applications for others | ACTIVE | Dec 1, 2016 |
| 040 | manufacture of electrical power switches and controllers for computer and telecommunications network applications to the order and/or specification of others; custom manufacture of power solutions for network applications; manufacture of power supplies for computing, communications, and industrial equipment applications to order and/or specification of others; custom manufacture of electrical power solutions for network applications; custom manufacture of power supplies for computing, communications, and industrial equipment applications; manufacture of electrical power solutions for network applications for others; manufacture of power supplies for computing, communications, and industrial equipment applications for others | ACTIVE | Nov 1, 2017 |
| 041 | educational services, namely, conducting classes, seminars, and workshops in the field of electrical power systems, and data center infrastructure management, and distribution of training material in connection therewith | ACTIVE | Dec 1, 2016 |
| 042 | air conditioning maintenance assessment services for the performance and reliability of air conditioning systems for data centers and computer rooms; battery monitoring and testing; consulting services in the field of design and engineering of electrical and battery back-up power systems for data centers, computer rooms and other commercial and industrial facilities; design of electrical and battery back-up power systems for computer and telecommunications network applications for others; engineering services, namely, technical project planning and design engineering for others in the fields of electrical and battery back-up power systems, computer networks and telecommunications projects; electrical engineering services, namely, providing technical analysis, testing, studies, recommendations and drafting plans relating to the safety, efficiency, performance and reliability of electrical equipment and power systems; electrical and battery back-up power systems and data center computer and telecommunications equipment engineering services; engineering services, namely, providing technical assessment of the performance, reliability, maintenance and configuration of data center and commercial and industrial facility electrical and battery back-up power systems; engineering services, namely, providing technical assessment of the performance, reliability, maintenance and configuration of data center cooling systems; remote monitoring of the functioning and use of data center and computer room electrical equipment, electrical and battery back-up power systems, and data center and computer room heating, ventilating and air conditioning apparatus; technical consultation in the fields of engineering of electrical and battery back-up power systems | ACTIVE | Dec 1, 2016 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Vertiv Co.
- Other trademarks owned by VERTIV GROUP CORPORATION
- Other trademarks owned by VERTIV GROUP CORPORATION
- Other trademarks in Class 006
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 019
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 041
- Other trademarks in Class 042
- Similar marks named V VERTIV
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 3, 2025 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Jan 24, 2024 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| May 31, 2022 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| May 31, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 27, 2022 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Apr 26, 2022 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Mar 28, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 28, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 28, 2022 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Mar 24, 2022 | ALIE | ASSIGNED TO LIE | — |
| Mar 22, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 24, 2021 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 24, 2021 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 24, 2021 | CNRT | SU - NON-FINAL ACTION - WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 25, 2021 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Aug 20, 2021 | IUAF | USE AMENDMENT FILED | — |
| Aug 20, 2021 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Feb 9, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 8, 2021 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Feb 8, 2021 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jan 22, 2021 | EXT5 | SOU EXTENSION 5 FILED | — |
| Jan 22, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 19, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 17, 2020 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Aug 17, 2020 | EXT4 | SOU EXTENSION 4 FILED | — |
| Aug 17, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 29, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 20, 2020 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Feb 20, 2020 | EXT3 | SOU EXTENSION 3 FILED | — |
| Feb 20, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 19, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 19, 2020 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Feb 19, 2020 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Feb 19, 2020 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 19, 2020 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 19, 2020 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Aug 23, 2019 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 21, 2019 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Aug 21, 2019 | EXT2 | SOU EXTENSION 2 FILED | — |
| Aug 21, 2019 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 12, 2019 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Feb 21, 2019 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 19, 2019 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 19, 2019 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Feb 19, 2019 | EXT1 | SOU EXTENSION 1 FILED | — |
| Feb 19, 2019 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 21, 2018 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jul 11, 2018 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| May 16, 2018 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| May 1, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 1, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 11, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 23, 2018 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 16, 2018 | ALIE | ASSIGNED TO LIE | — |
| Mar 9, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 9, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 9, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 9, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 9, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 9, 2018 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Mar 8, 2018 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Dec 5, 2017 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Nov 22, 2017 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Oct 10, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 10, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 20, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 28, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 28, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 28, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 28, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 28, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 4, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 3, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 3, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 3, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 3, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 3, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 14, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 13, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 13, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 19, 2016 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 19, 2016 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 19, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 18, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 16, 2016 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Apr 15, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 15, 2016 | NWAP | NEW APPLICATION ENTERED | — |