USPTO serial 86978065
Reviewed by CopyMark Law Group
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
San Rafael, CA, US
San Rafael, CA, US
San Francisco, CA, US
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
David M. Kelly
David M. Kelly Kelly IP, LLP1150 Connecticut Avenue, N.W., Suite 600Washington, DC 20036United States| Class | Description | Status | First use |
|---|---|---|---|
| 009 | CAD software, namely, computer-aided design software and computer-aided management software for architects, engineers, and facilities planners and managers, and instructional manuals sold together as a unit therewith; computer aided design and manufacturing software (CAD/CAM) for general use; computer aided design and manufacturing software (CAD/CAM) for use in construction, building, modeling, simulation, architecture, engineering and automated manufacturing; computer software for building, construction, engineering, simulation, modeling, prototyping, structural analysis, manipulation, testing, analysis, performance, configuration, integration, and sustainable design; computer software for generating and managing physical and functional characteristics of the building process; computer software for structural analysis and structural engineering; computer software development and exchange tools; computer software for determining material performance, stress load, and optimization in building, construction, engineering and manufacturing; computer software for building, construction, engineering and planning of mechanical, electrical, plumbing, and HVAC locations, restrictions, enhancements and customization; computer software for modeling, interoperability, scheduling, collaboration, and integration; computer software that provides web-based access to applications and services through a web operating system or portal interface; computer software for the databasing, visualization, manipulation, simulation, and virtual rendering of building design, construction, engineering, architecture, modeling, rendering, and manufacturing | ACTIVE | Feb 21, 2002 |
| 042 | Non-downloadable, cloud based computer software for building, construction, engineering, simulation, testing, analysis, performance, integration, and sustainable design; cloud based computer software for building, construction, engineering, simulation, testing, analysis, performance, configuration, and sustainable design; cloud based software development and exchange tools; design of information graphics and data visualization materials; providing an internet website portal offering information in the field of computer aided design and manufacturing | ACTIVE | Sep 10, 2010 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 19, 2026 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| May 19, 2026 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| May 19, 2026 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| May 18, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 16, 2026 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Jan 23, 2026 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 23, 2026 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 23, 2026 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 15, 2025 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Sep 6, 2022 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Sep 6, 2022 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Sep 6, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 12, 2022 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jul 12, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 12, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 12, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 12, 2022 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Mar 14, 2022 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| May 14, 2021 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| May 14, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 14, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 14, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| May 14, 2021 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| May 14, 2021 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| May 14, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 14, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 14, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| May 14, 2021 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Mar 15, 2021 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jul 31, 2018 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 15, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 6, 2016 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Feb 5, 2016 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jan 7, 2016 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jan 7, 2016 | DPCC | DIVISIONAL PROCESSING COMPLETE | — |
| Nov 19, 2015 | IUAF | USE AMENDMENT FILED | — |
| Nov 19, 2015 | DRRR | DIVISIONAL REQUEST RECEIVED | — |
| Nov 19, 2015 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| Nov 19, 2015 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Jul 17, 2015 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 16, 2015 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jul 14, 2015 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jun 16, 2015 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jun 16, 2015 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 5, 2015 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 5, 2015 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 9, 2014 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 5, 2014 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Dec 5, 2014 | EXT1 | SOU EXTENSION 1 FILED | — |
| Dec 5, 2014 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 17, 2014 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| May 2, 2014 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Jan 14, 2014 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Dec 17, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 17, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 27, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 11, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 6, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 1, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 30, 2013 | NWAP | NEW APPLICATION ENTERED | — |