Drawing for INDUSTRIAL SPECIALISTS

USPTO serial 87007581

INDUSTRIAL SPECIALISTS

Reviewed by CopyMark Law Group

Reg. 5230667Status 702Renewal
Filing date
Status date
Registration date
Jun 27, 2017
Examiner
EBAUGH, MICHAEL
Law office
TMEG LAW OFFICE 108

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with INDUSTRIAL SPECIALISTS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $748*

Plus Government fees of $1,300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Katherine P. Califa

Katherine P. Califa Foley & Lardner LLP3000 K Street, N.W. Suite 600Washington, DC 20007-5109United States

Goods and services

ClassDescriptionStatusFirst use
037Construction services in the field of application of paint, coatings and resins, namely, specialized industrial painting contractor services and application of specialized coatings and resin sealers for large-scale industrial site surface preparations, oil field, gas, shipyard and marine facilities; contractor services in the field of application of paint, coatings and resins, namely, application of coatings, paint and resin sealers to marine vessels, hull surfaces, above ground storage tanks, and drilling equipment and risers located on marine equipment; contractor services, namely, application of protective coatings for preventing corrosion under insulation in petrochemical facilities and chemical plants, application of protective thermal spray coatings on industrial piping, structures, and industrial operating vessels; construction services in the field of industrial facilities insulation services, namely, installation, maintenance and removal of thermal and cryogenic insulating materials at refinery, petrochemical and power generation facilities, and marine and offshore facilities; installation of insulation, cladding and jacketing for boilers, ducting and piping at refinery, petrochemical and power generation facilities, and marine and offshore facilities; construction services, namely, asbestos removal services at refinery, petrochemical and power-generation facilities, and marine and off-shore facilities; construction services, namely, lead removal services at refinery, petrochemical, power-generation facilities, and marine and off-shore facilities; construction services in the field of refractory services, namely, installation, repair, and maintenance of refractory linings in high temperature vessels, particularly fluid catalytic cracking units, reformers, hydro crackers, crude units, thermal reactors, boilers, sulfur recovery units, and industrial furnaces; demolition services, namely, demolition of refractory linings in high temperature vessels, namely, structures and industrial operating or processing vessels; installation of building scaffolds, working platforms and building platforms; repair and maintenance of building scaffolds, working platforms and building platforms; scaffolding erection; scaffolding installation management services; construction management; construction project management services; general construction contracting; construction planningACTIVEDec 31, 1985
040Abrasive blasting services, namely, robotic blasting and blasting for large-scale industrial facilities, refinery, petrochemical and power-generation facilities, and marine and offshore facilities; custom manufacture of components for industrial insulation; rapid arc weldingACTIVEDec 31, 1985

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 27, 2026REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Nov 29, 2023NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Nov 29, 2023C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Nov 28, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 13, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 13, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 13, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 13, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Sep 13, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Aug 16, 2023ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
May 31, 2023E815TEAS SECTION 8 & 15 RECEIVED—
Apr 18, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 18, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 18, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 18, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 18, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jun 27, 2022REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jun 27, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 5, 2017AOUMASSIGNMENT OF OWNERSHIP UPDATED MANUALLY—
Apr 11, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 11, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 22, 2017ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Mar 22, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 3, 2017PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 22, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 31, 2017DOCKASSIGNED TO EXAMINER—
Jan 31, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 31, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 25, 2017ALIEASSIGNED TO LIE—
Jan 6, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 5, 2016GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 5, 2016GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 5, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 4, 2016DOCKASSIGNED TO EXAMINER—
Apr 26, 2016MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Apr 25, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 23, 2016NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance