Drawing for SITECOVER

USPTO serial 87102448

SITECOVER

Reviewed by CopyMark Law Group

Reg. 5420060Status 701Registered
Filing date
Status date
Registration date
Mar 6, 2018
Examiner
CALIENDO, COURTNEY MICHELLE
Law office
FILE DESTROYED

What this means

Status 701 means the registration is active and the first Section 8 declaration of continued use was accepted. The next major deadline is the combined Section 8 and Section 9 filing at the 10-year anniversary. Calendar the 10-year Section 8 and 9 combined renewal.

Status 701: Status 701 means the registration is active and the first Section 8 declaration of continued use was accepted. The next major deadline is the combined Section 8 and Section 9 filing at the 10-year anniversary.

Need help with SITECOVER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Donna J. Bunton

Donna J. Bunton NIXON & VANDERHYE P.C.901 NORTH GLEBE ROAD, 11TH FLOORARLINGTON, VA 22203United States

Goods and services

ClassDescriptionStatusFirst use
006Metal Building material, namely, metal panels, composite panels composed primarily of metal, metal ceiling and floor boards, metal fascia, soffits, metal canopies, metal reinforcement materials for building, metal formwork tables, metal scaffolding; Metal building system in the nature of metal formwork, metal scaffolding; scaffolding towers of metal; metal canopies; building materials of metal or predominantly of metal, namely, composite panels composed primarily of metal, metal ceiling and floor boards, metal fascia, soffits, metal canopies, metal reinforcement materials for building, metal formwork tables, metal scaffolding; transportable buildings of metal or predominantly of metal; Prefabricated fabric covered buildings made substantially of metal that are used as a manufacturing facility; Metal scaffolding; Temporary building system in the nature of a modular building made primarily of metal which provides full coverage, shelter and protection for a wide range of construction areas, including buildings, arenas, music-event venues, and protection or shielding of cranes and overhung cranesACTIVE—
019Non-metal building material, namely, composite panels, non-metal fascia, non-metal soffits, non-metal soffits, non-metal canopies, reinforcing materials not of metal for building purposes; non-metal building system in the nature of non-metal formwork, non-metal scaffolding; non-scaffolding towers; non-metal canopies; building materials of non-metal or predominantly non-metal, namely, composite panels composed primarily of non-metal, non-metal ceiling and floor boards, non-metal fascia, non-metal soffits, non-metal canopies, non-metal reinforcement materials for building, non-metal formwork tables, non-metal scaffolding; transportable buildings of non-metal or predominantly of non-metal; Prefabricated fabric covered buildings made substantially of non-metal that are used as a manufacturing facility; non-metal scaffolding; Temporary building system in the nature of a modular building made primarily of non-metal which provides full coverage, shelter and protection for a wide range of construction areas, including buildings, arenas, music-event venues, and protection or shielding of cranes and overhung cranesACTIVE—
037Building construction, alteration, renovation, restoration, maintenance and repair, installation work; building construction supervision; Building construction information; General building contractor services; accepting and carrying out building work in the nature of general construction contracting, construction of scaffolding, construction of temporary building systems, construction of prefabricated buildings; Accepting and carrying out shielding work of buildings, sports arenas or music events in the nature of construction services to build protective buildings and modular buildings; contracting for and carrying out building work, namely, rental of construction and building equipment, rental of non-metal and metal modular buildings, and providing specialized manufacturing facilities for building construction services, construction of buildings, construction of modular buildingsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 30, 2024NAS8NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED—
Oct 30, 20248.OKREGISTERED - SEC. 8 (6-YR) ACCEPTEDThe USPTO accepted your Section 8 declaration showing the mark is still in use in commerce (or excusable nonuse). This satisfies the six-year maintenance requirement and keeps the registration active until the next renewal deadline.
Oct 30, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 27, 2024ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Mar 6, 2024ES8RTEAS SECTION 8 RECEIVED—
Mar 6, 2023REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Mar 6, 2018R.SRREGISTERED-SUPPLEMENTAL REGISTERYour mark is registered on the Supplemental Register, which is available for marks that are not yet distinctive enough for the Principal Register but can still identify a source. Protection is more limited than Principal Register registration but can later support a Principal Register application.
Feb 1, 2018PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 25, 2018CNTAAPPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER—
Jan 25, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Jan 25, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 25, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 25, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 5, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 5, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 5, 2018ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 10, 2017GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jul 10, 2017GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 10, 2017CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 9, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 9, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 8, 2017ALIEASSIGNED TO LIE—
May 24, 2017ALIEASSIGNED TO LIE—
May 1, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 31, 2016GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 31, 2016GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 31, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 24, 2016DOCKASSIGNED TO EXAMINER—
Jul 20, 2016MPMKNOTICE OF PSEUDO MARK E-MAILED—
Jul 19, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 16, 2016NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance