Drawing for TGES AMERICA

USPTO serial 87105893

TGES AMERICA

Reviewed by CopyMark Law Group

Reg. 5782041Status 705Registered
Filing date
Status date
Registration date
Jun 18, 2019
Examiner
LATTUCA, FRANK J
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights. Track next renewal deadlines in TSDR and WIPO records.

Status 705: Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights.

Need help with TGES AMERICA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael N. Mercanti

Michael N. Mercanti LUCAS & MERCANTI, LLP100 South Jefferson Road, Suite 202Whippany, NJ 07981United States

Goods and services

ClassDescriptionStatusFirst use
001[ Chilled water for industrial purposes; Cooling water for industrial purposes; Deionized water for industrial purposes; Purified water for industrial purposes; Compressed air for industrial purposes; Steam for industrial purposes ]SECTION 8 - CANCELLED—
035Business consulting and advisory services in the field of energy efficiency; Business consulting services in the fields of energy measurement to improve energy efficiency within residential, commercial, industrial and institutional facilities; Consulting services in the fields of energy consumption and usage conservation to improve energy efficiency; Energy management services, namely, providing a service that allows customers to purchase energy from various energy providers; Provision of information, advice and consultancy in relation to energy efficiencyACTIVE—
037Construction planning; construction consultancy; Repair and maintenance of boilers; Repair and maintenance of gas turbines other than water mills and wind mills; Repair and maintenance of gas engines (not for land vehicles); Repair and maintenance of burners; Repair and maintenance of pumps; Repair and maintenance of chillers; Repair and maintenance of electric motors; Repair and maintenance of power distribution, control machines and apparatus; Repair or maintenance of power generators used for cogeneration system; Installation, maintenance, servicing and repair of utility supply plants; Installation of energy-saving apparatusACTIVE—
039Utility services, namely, providing steam, chilled water, cooling water, deionized water, compressed airACTIVE—
040Energy generation services; production of electrical energy from renewable sources; Production of energy and transforming of energy into useful electricity; Energy recycling services, namely, conversion of waste energy into electricity, chilled water, cooling water, deionized water, and purified water; Energy recycling services, namely, conversion of waste energy into useful steam and compressed air; Leasing of energy and renewable energy generating equipment; Consultancy in the field of energy and renewable energy generation; Rental of energy and renewable energy generating equipment; Leasing of energy and renewable energy generation equipment; Waste-to-energy generation services; Energy recycling services, namely, capturing and conversion of wasted energy into electricity and useful steam and hot waterACTIVE—
042Remote monitoring of operational aspect of environmental building equipment; Technical consultancy in the field of energy saving and energy efficiency; Energy auditing; Monitoring of power generators and energy distribution networks; Consulting services in the fields of energy measurement to improve energy efficiency; Engineering services in the field of energy efficiencyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 2, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 2, 2025ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Dec 2, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 2, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 14, 2025NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Apr 14, 2025C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Apr 11, 2025EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Jan 21, 2025PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15—
Jan 15, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 21, 2024E815TEAS SECTION 8 & 15 RECEIVED—
Jun 18, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Oct 27, 2023EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Oct 27, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 27, 2023ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Oct 27, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 27, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 27, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Oct 27, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jun 26, 2019PCGRPETITION TO DIRECTOR GRANTED—
Jun 18, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 14, 2019SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
May 13, 2019CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
May 13, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 13, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 6, 2019ALIEASSIGNED TO LIE—
Apr 28, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 24, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 24, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 24, 2019CNRTSU - NON-FINAL ACTION - WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 5, 2019MREINOTICE OF REINSTATEMENT MAILED—
Apr 3, 2019APETASSIGNED TO PETITION STAFF—
Mar 30, 2019SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Mar 30, 2019RGIAREINSTATEMENT GRANTED - INADVERTENTLY ABANDONED—
Mar 25, 2019MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Mar 25, 2019ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Mar 4, 2019TPDRTEAS PETITION TO DIRECTOR RECEIVED—
Feb 21, 2019IUAFUSE AMENDMENT FILED—
Feb 21, 2019FAXXFAX RECEIVED—
Aug 16, 2018EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 14, 2018EX3GSOU EXTENSION 3 GRANTED—
Aug 14, 2018EXT3SOU EXTENSION 3 FILED—
Aug 14, 2018EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 29, 2017EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Sep 27, 2017EX2GSOU EXTENSION 2 GRANTED—
Sep 27, 2017EXT2SOU EXTENSION 2 FILED—
Sep 27, 2017EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 5, 2017EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 3, 2017EX1GSOU EXTENSION 1 GRANTED—
Apr 3, 2017EXT1SOU EXTENSION 1 FILED—
Apr 3, 2017EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 21, 2017NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Dec 27, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 27, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 7, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 17, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 16, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 16, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 16, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 28, 2016GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 28, 2016GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 28, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 26, 2016DOCKASSIGNED TO EXAMINER—
Jul 22, 2016MPMKNOTICE OF PSEUDO MARK E-MAILED—
Jul 21, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 19, 2016NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance