USPTO serial 87134929
S-TOM
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Mar 26, 2019
- Examiner
- SALCIDO, JOHN CHARLES
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with S-TOM?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Andrew D. Price
ANDREW D. PRICE VENABLE LLPP.O. BOX 34385WASHINGTON, DC 20043UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Containers and housings made of metal for containing and protecting electrical and electronical equipment; watertight containers and housings made of metal for containing and protecting electrical and electronical equipment; gastight containers and housings made of metal for containing and protecting electrical and electronical equipment; pressure-resistant containers and housings made of metal for containing and protecting electrical and electronical equipment; metal constructions in the nature of carrying and supporting structures of water, fluid flow, tidal, wind, solar, geothermal energy and solar heat power plants as well as power generation means and systems and structural parts thereof and therfor; metal frames as construction and support parts as well as parts thereof and therfor; fixing and mounting parts made of metal, namely, brackets, metal clamps, fasteners, joists | SECTION 8 - CANCELLED | — |
| 009 | housings for electronic and electrical controls, control modules, apparatuses, circuitry and switches as well as for measurement devices; watertight housings for electronic and electrical controls, control modules, apparatuses, circuitry and switches as well as for measurement devices; gastight housings for electronic and electrical controls, control modules, apparatuses, circuitry and switches as well as for measurement devices; pressure-resistant housings for electronic and electrical controls, control modules, apparatuses, circuitry and switches as well as for measurement devices; power supplies for electronic and electrical controls, control modules, apparatuses, circuitry and switches as well as for measurement devices; capsulated electronic, capsulated electrical controls, and capsulated control modules, for controlling water, fluid flow, tidal, wind, solar, geothermal energy and solar heat power plants as well as power generation means and systems, capsulated control apparatuses, namely, apparatuses for controlling water, fluid flow, tidal, wind, solar, geothermal energy and solar heat power plants as well as power generation means and systems, electronic and integrated circuitry and power and electric switches as well as for measurement devices; watertight electrical connectors and connection modules as well as plugs and sockets therefor; cooling elements and cooling devices for electronic and electrical controls, control modules, apparatuses, circuitry and switches as well as for measurement devices; temperature controls for electronic and electrical controls, control modules, apparatuses, circuitry and switches as well as for measurement devices; electronic and electric controls as well as computer hardware and software for controlling water, fluid flow, tidal, wind, solar, geothermal energy and solar heat power plants as well as power generation means and systems, including electricity generators and electricity generator systems, including asynchronous generators, as well as turbines, rotors, turbine impellers, turbine blades and rotor blades for fluid flow and tidal power plants; energy controller, apparatuses and instruments for the switching, transformation, storage, control and conduction of energy; uninterrupted power supply devices; power supply aggregates; power supply units; electronic power supply devices; controlled power supply apparatuses; apparatuses for the uninterrupted power supply; uninterrupted power supplies in the form of batteries; photovoltaic solar modules for production of electricity; solar cell boards in the nature of solar panels for the production of electricity; solar battery charging apparatuses; solar cells, solar batteries for industrial purposes; solar collectors for the power generation; monitoring and controlling apparatus and systems consisting thereof for condition, operation and performance of water, fluid flow, tidal, wind, solar, geothermal energy and solar heat power plants as well as power generation means and systems, including electricity generators and electricity generator systems, including asynchronous generators, as well as turbines, rotors, turbine impellers, turbine blades and rotor blades for fluid flow and tidal power plants, comprising computer software, computer hardware, sensors, transmitters and receivers, included in class 9; computer hardware and software for use with monitoring and controlling equipment of water, fluid flow, tidal, wind, solar, geothermal energy and solar heat power plants as well as power generation means and systems, including electricity generators and electricity generator systems, including asynchronous generators, as well as turbines, rotors, turbine impellers, turbine blades and rotor blades for fluid flow and tidal power plants, for receiving, storing, processing, transmitting and displaying data; computer hardware and software for monitoring and controlling the condition, operation and performance of water, fluid flow, tidal, wind, solar, geothermal energy and solar heat power plants as well as power generation means and systems, including electricity generators and electricity generator systems, including asynchronous generators, as well as turbines, rotors, turbine impellers, turbine blades and rotor blades for fluid flow and tidal power plants, on site and remote, included in class 9; error recording and storing devices for recording and storing data resulting from monitoring and controlling the condition, operation and performance of water, fluid flow, tidal, wind, solar, geothermal energy and solar heat power plants as well as power generation means and systems, including electricity generators and electricity generator systems, including asynchronous generators, as well as turbines, rotors, turbine impellers, turbine blades and rotor blades for fluid flow and tidal power plants, included in class 9; electrical and electronic sensors for measuring data for monitoring and controlling the condition, operation and performance of water, fluid flow, tidal, wind, solar, geothermal energy and solar heat power plants as well as power generation means and systems, including electricity generators and electricity generator systems, including asynchronous generators, as well as turbines, rotors, turbine impellers, turbine blades and rotor blades for fluid flow and tidal power plants, included in class 9; vibration sensors; electrical sensors; gas sensors for measuring gas concentrations; industrial calibration sensors; fluid level sensors; optical sensors; photoelectric sensors; pressure sensors; proximity sensors; sensors for the determination of temperatures, positions, distances, velocity and acceleration; timing sensors; ultrasonic sensors; all aforementioned sensors especially for installation in water, fluid flow, tidal, wind, solar, geothermal energy and solar heat power plants as well as power generation means and systems, including electricity generators and electricity generator systems, including asynchronous generators, as well as turbines, rotors, turbine impellers, turbine blades and rotor blades for fluid flow and tidal power plants or for measuring data for monitoring and controlling the condition, operation and performance of water, fluid flow, tidal, wind, solar, geothermal energy and solar heat power plants as well as power generation means and systems, including electricity generators and electricity generator systems, including asynchronous generators, as well as turbines, rotors, turbine impellers, turbine blades and rotor blades for fluid flow and tidal power plants, included in class 9; security equipment for water, fluid flow, tidal, wind, solar, geothermal energy and solar heat power plants as well as power generation means and systems, including electricity generators and electricity generator systems, including asynchronous generators, as well as turbines, rotors, turbine impellers, turbine blades and rotor blades for fluid flow and tidal power plants, namely, security sensors and cameras; environment monitoring system, comprising counters and sensors measuring pressure, humidity and temperature, as well as alarm and report functions; nautical sensor and navigation systems for positioning, setting, aligning, controlling, securing and tracing fluid flow and tidal power plants; frequency inverters; frequency converters; electric transformers; current converters; power supply converters; power supply filters; inverters for power supply devices; anodes, especially zinc anodes | SECTION 8 - CANCELLED | — |
| 037 | mounting, installation, maintenance and repair of electronic and electrical controls as well as computer hardware for control of water, fluid flow, tidal, wind, solar, geothermal energy and solar heat power plants as well as power generation means and systems, including electricity generator systems, including asynchronous generators, as well as turbines, rotors, turbine impellers, turbine blades and rotor blades, especially for fluid flow and tidal power plants as well as for power generation with the use of fluid flows and tides; mounting, installation, maintenance and repair of containers and housings made of metal, including watertight, gastight and/or pressure-resistant containers and housings made of metal, as well as of metal constructions and metal frames as construction and support parts | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by SCHOTTEL Hydro GmbH
- Other trademarks owned by SCHOTTEL Hydro GmbH
- Other trademarks owned by SCHOTTEL Hydro GmbH
- Other trademarks in Class 006
- Other trademarks in Class 009
- Other trademarks in Class 037
- Similar marks named S-TOM
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 10, 2025 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Mar 26, 2024 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Mar 26, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 8, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 8, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 19, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 4, 2018 | FIXD | ELECTRONIC RECORD REVIEW COMPLETE | — |
| Nov 30, 2018 | ERRR | ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED | — |
| Nov 26, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 26, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 26, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 26, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 26, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 16, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 16, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 15, 2018 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| May 31, 2018 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| May 31, 2018 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 31, 2018 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 29, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 29, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 25, 2018 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 25, 2018 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Nov 29, 2017 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Nov 29, 2017 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Nov 29, 2017 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Nov 28, 2017 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| May 26, 2017 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| May 26, 2017 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| May 26, 2017 | CNSL | SUSPENSION LETTER WRITTEN | — |
| May 26, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 26, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 22, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 23, 2016 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 23, 2016 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 23, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 22, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 9, 2016 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Sep 2, 2016 | ALIE | ASSIGNED TO LIE | — |
| Aug 24, 2016 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 24, 2016 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Aug 17, 2016 | MPMK | NOTICE OF PSEUDO MARK E-MAILED | — |
| Aug 16, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 15, 2016 | NWAP | NEW APPLICATION ENTERED | — |