Drawing for BRACKEN ENGINEERING

USPTO serial 87154298

BRACKEN ENGINEERING

Reviewed by CopyMark Law Group

Reg. 5235454Status 710
Filing date
Status date
Registration date
Jul 4, 2017
Examiner
HENRY, NAKIA D
Law office
TMO LAW OFFICE 129 - EXAMINING ATTORNEY ASSIGNED

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with BRACKEN ENGINEERING?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Joshua M. Gerben, Esq.

Joshua M. Gerben, Esq. Gerben Perrott PLLC1050 Connecticut Ave. NW, Suite 500Washington, DC 20036UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Consulting services in the field of repair and restoration of buildings; Consulting services in the field of subsurface remediation namely, soil erosion control servicesSECTION 8 - CANCELLEDAug 8, 1997
042Engineering services in the fields of structural and geotechnical engineering, building and property condition assessments, repair and restoration, subsurface remediation, geophysical surveying; Consulting services in the fields of structural and geotechnical engineering, building and property condition assessments, geophysical surveying; Consulting services in the field of subsurface remediation namely, soil sampling for analysis purposesSECTION 8 - CANCELLEDAug 8, 1997

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 19, 2024C8..CANCELLED SEC. 8 (6-YR)—
Jul 4, 2022REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
May 11, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
May 11, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 11, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 11, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 11, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Nov 21, 2018ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jul 4, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 18, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 18, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 29, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 3, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 3, 2017XAECEXAMINER'S AMENDMENT ENTERED—
Mar 3, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 3, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 3, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 2, 2017GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 2, 2017GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 2, 2017CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Feb 28, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 27, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 27, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 30, 2017GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Jan 30, 2017GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Jan 30, 2017CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Jan 19, 2017ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jan 10, 2017PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Dec 21, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 21, 2016XAECEXAMINER'S AMENDMENT ENTERED—
Dec 21, 2016GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 21, 2016GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 21, 2016CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 12, 2016GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 12, 2016GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 12, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 1, 2016DOCKASSIGNED TO EXAMINER—
Sep 2, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 1, 2016NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance