Drawing for BUILDING TEXAS... POWERING THE WORLD

USPTO serial 87180983

BUILDING TEXAS... POWERING THE WORLD

Reviewed by CopyMark Law Group

Reg. 6147688Status 700Renewal
Filing date
Status date
Registration date
Sep 8, 2020
Examiner
IN, SUNG HYUN
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with BUILDING TEXAS... POWERING THE WORLD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $3,191*

Plus Government fees of $3,825

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jake M. Gipson

Jake M. Gipson BRADLEY ARANT BOULT CUMMINGS LLP1819 Fifth Avenue NorthBirmingham, AL 35203United States

Goods and services

ClassDescriptionStatusFirst use
007Machinery for earth moving, earth conditioning, and material handling, namely, armored face conveyors, backhoe loaders, cold planers, compact track loaders, bulldozers, draglines for use in excavating, electric rope shovels, excavators, forwarders for use in commercial logging, highwall miners for use in surface mining operations, hydraulic mining shovels, knuckleboom loaders, landfill waste compacting machines, motor graders, multi terrain loaders, pipelayers, plows, pneumatic compacting machines, road reclaimers for use in compacting and stabilizing existing pavement, rotary power drills, skid steer loaders, soil compactors, tandem vibratory rollers for use in road compaction, telescoping material handlers in the nature of telehandlers and boom lifts, track asphalt paving machines, track drills, feller bunchers for use in commercial logging, track harvesters, track loaders, track skidders for use in commercial logging, underground mining loaders, waste handling dozers, wheel asphalt paving machines, wheeled bulldozers, wheel excavating machines, wheel loading machines, wheel tractor-scrapers for use in earthmoving; Attachments to such machinery for earth moving, earth conditioning, and material handling, namely, augers, backhoes, blades, brooms, brushcutters, buckets, mining shovels, cold planers, compactors, couplers, delimbers, felling heads, forks, grapples, hammers, harvestor heads, material handling arms, mulchers, multi-processors, pulverizors, rakes, rippers, saws, shears, silage defacers, snow blowers, snow plows, snow pushes, stump grinders, thumbs, tillers, trenchers, truss booms, and winches, all of the foregoing for use with machinery for earth moving, earth conditioning and material handling; electric, industrial, diesel, gas, and natural gas generators; non-land vehicle engines and motors, current generators, compressors, and pumps for machines and parts therefor, for use in agriculture, compaction, compressing gas, construction, demolition, earth conditioning, earth contouring, earth moving, forestry, landscaping, lifting, marine propulsion, material handling, mining, mulching, oil and gas distribution, oil and gas exploration, oil and gas production, paving, pipelaying, power generation, powering oil and gas drilling operations, producing power from engines and generators, pumping oil, road building and repair, site preparation and remediation, tunnel boring, and vegetation managementACTIVEJul 1, 2020
009Equipment, namely, computer hardware and software for testing, monitoring, operating, locating, positioning and controlling vehicles, engines, equipment, machines, machine tools, and parts therefor, for use in agriculture, compaction, compressing gas, construction, demolition, earth conditioning, earth contouring, earth moving, forestry, landscaping, lifting, marine propulsion, material handling, mining, mulching, oil and gas distribution, oil and gas exploration, oil and gas production, paving, pipelaying, power generation, road building and repair, site preparation and remediation, tunnel boring, and vegetation managementACTIVEJul 1, 2020
012Land and marine vehicles, namely, articulated trucks, off-highway trucks, off-highway tractors, and mining trucks, and structural parts therefor, for use in agriculture, compaction, compressing gas, construction, demolition, earth conditioning, earth contouring, earth moving, forestry, landscaping, lifting, marine propulsion, material handling, mining, mulching, oil and gas distribution, oil and gas exploration, oil and gas production, paving, pipelaying, power generation, road building and repair, site preparation and remediation, tunnel boring, and vegetation management; engines for land vehicles; brake air compressors for land vehicles and vehicle structural parts and fittings for all of the foregoing goodsACTIVEJul 1, 2020
035Retail store services and online retail store services featuring vehicles, equipment, engines, power generation equipment, and machinery, and parts therefor, for use in agriculture, compaction, compressing gas, construction, demolition, earth conditioning, earth contouring, earth moving, forestry, landscaping, lifting, marine propulsion, material handling, mining, mulching, oil and gas distribution, oil and gas exploration, oil and gas production, paving, pipelaying, power generation, road building and repair, site preparation and remediation, tunnel boring, and vegetation managementACTIVEJul 1, 2020
036Financing of vehicles, engines, equipment, machines, machine tools, power generation equipment, and parts therefor, for use in agriculture, compaction, compressing gas, construction, demolition, earth conditioning, earth contouring, earth moving, forestry, landscaping, lifting, marine propulsion, material handling, mining, mulching, oil and gas distribution, oil and gas exploration, oil and gas production, paving, pipelaying, power generation, road building and repair, site preparation and remediation, tunnel boring, and vegetation management; financing and lease-purchase financing servicesACTIVEJul 1, 2020
037Repair, installation, servicing, and maintenance of vehicles, engines, machine tools, and power generation equipment, and parts therefor, for use in agriculture, compaction, compressing gas, construction, demolition, earth conditioning, earth contouring, earth moving, forestry, landscaping, lifting, marine propulsion, material handling, mining, mulching, oil and gas distribution, oil and gas exploration, oil and gas production, paving, pipelaying, power generation, road building and repair, site preparation and remediation, tunnel boring, and vegetation managementACTIVEJul 1, 2020
039Vehicle rental and rental services; rental of equipment, machines, and machine tools for use in oil and gas distribution; product distribution in the nature of delivery of goods; logistics consulting services, namely, consulting in the field of transportation, storage and delivery of goods; rental of lifting equipment machines, and machine tools, and parts therefor, for use in loading and unloading; rental of vehicles and vehicle engines, for use in agriculture, compaction, compressing gas, construction, demolition, earth conditioning, earth contouring, earth moving, forestry, landscaping, lifting, marine propulsion, material handling, mining, mulching, oil and gas distribution, oil and gas exploration, oil and gas production, paving, pipelaying, power generation, road building and repair, site preparation and remediation, tunnel boring, and vegetation managementACTIVEJul 1, 2020
042Testing and inspection of engines and machinery for use in agriculture, compaction, compressing gas, construction, demolition, earth conditioning, earth contouring, earth moving, forestry, landscaping, lifting, marine propulsion, material handling, mining, mulching, oil and gas distribution, oil and gas exploration, oil and gas production, paving, pipelaying, power generation, road building and repair, site preparation and remediation, tunnel boring, and vegetation managementACTIVEJul 1, 2020
044Rental of, and rental services relating to, equipment, machinery, and machine tools for use in agriculture, forest habitat restoration, landscaping, mulching and vegetation managementACTIVEJul 1, 2020

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 15, 2026PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15—
Aug 28, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 19, 2026ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jun 1, 2026E815TEAS SECTION 8 & 15 RECEIVED—
Sep 8, 2025REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Sep 8, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 4, 2020SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Aug 1, 2020CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Jul 23, 2020SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jul 20, 2020IUAFUSE AMENDMENT FILED—
Jul 20, 2020EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Apr 1, 2020EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Mar 31, 2020EX5GSOU EXTENSION 5 GRANTED—
Mar 30, 2020EXT5SOU EXTENSION 5 FILED—
Mar 30, 2020EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 26, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Sep 25, 2019EX4GSOU EXTENSION 4 GRANTED—
Sep 23, 2019EXT4SOU EXTENSION 4 FILED—
Sep 23, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 5, 2019EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 4, 2019EX3GSOU EXTENSION 3 GRANTED—
Apr 4, 2019AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Apr 1, 2019EXT3SOU EXTENSION 3 FILED—
Apr 1, 2019EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 18, 2018EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Sep 14, 2018EX2GSOU EXTENSION 2 GRANTED—
Sep 14, 2018EXT2SOU EXTENSION 2 FILED—
Sep 14, 2018EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 23, 2018EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Mar 21, 2018EX1GSOU EXTENSION 1 GRANTED—
Mar 21, 2018EXT1SOU EXTENSION 1 FILED—
Mar 21, 2018EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 3, 2017NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 8, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 8, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 19, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 28, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 27, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 27, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 27, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 27, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 10, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 10, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 10, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 30, 2016DOCKASSIGNED TO EXAMINER—
Sep 28, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 27, 2016NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance