USPTO serial 87184612
CANFER
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Feb 27, 2018
- Examiner
- SINGH, TEJBIR
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with CANFER?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Mark A. Oathout
3701 KIRBY DRIVESUITE 960HOUSTON, TX 77098Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction consultation; Construction of gas infrastructure facilities, electric power infrastructure facilities, foundations, and pipelines; Construction project management services; Electrical contracting; Excavation services; Installation, maintenance and repair of underground, horizontal directional drilling pipes, poly pipes, electric conduits, and steel gas pipes; Installation, maintenance and repair of electric power infrastructure facilities, overhead and underground electrical transmission systems, overhead and underground electrical distribution systems, duct bank systems, electrical substations, sub-grade electric grounding systems, electric utility network systems and telecommunication utility network systems; Installation, maintenance and repair of foundations for transmission towers, wind farms, general concrete foundations, large drill diameter foundations, and deep drill foundations; Installation, maintenance and repair of gas infrastructure facilities, pipeline infrastructure facilities, gas distribution systems for both poly and steel pipe, poly and steel pipe gas lines, and regulator stations | SECTION 8 - CANCELLED | Jan 31, 2010 |
| 042 | Design and development of gas infrastructure facilities, electric power infrastructure facilities, overhead and underground electrical transmission systems, electrical transmission lines and distribution voltage lines, electric substations, gas distribution systems, pipeline infrastructure facilities, and deep drill foundations; Electronic and electrical systems design services; Scientific and technological services, namely, analysis in the field of electric power infrastructure; Scientific and technological services, namely, analysis in the field of gas power infrastructure; Testing, analysis, and evaluation of electrical apparatus and systems to assure compliance with industry standards | SECTION 8 - CANCELLED | Jan 31, 2010 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Quanta Associates, L.P.
- Other trademarks owned by Quanta Associates, L.P.
- Other trademarks owned by Quanta Associates, L.P.
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named CANFER
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 9, 2024 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Feb 27, 2023 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Feb 27, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 12, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 12, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 22, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 3, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 2, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 2, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 2, 2017 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Aug 16, 2017 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Aug 16, 2017 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 16, 2017 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 3, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 3, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 2, 2017 | ALIE | ASSIGNED TO LIE | — |
| Aug 2, 2017 | ALIE | ASSIGNED TO LIE | — |
| Aug 2, 2017 | ALIE | ASSIGNED TO LIE | — |
| Aug 2, 2017 | ALIE | ASSIGNED TO LIE | — |
| Aug 2, 2017 | ALIE | ASSIGNED TO LIE | — |
| Jun 30, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 4, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 4, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 4, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 4, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 1, 2016 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Sep 30, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 30, 2016 | NWAP | NEW APPLICATION ENTERED | — |