Drawing for TRANE

USPTO serial 87201073

TRANE

Reviewed by CopyMark Law Group

Reg. 5387727Status 702Renewal
Filing date
Status date
Registration date
Jan 23, 2018
Examiner
FERRER PEREZ, PAUL ANTHONY
Law office
TMO LAW OFFICE 122

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with TRANE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*

Plus Government fees of $1,950

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeannine A Rittenhouse

Jeannine A Rittenhouse IPHORGAN LTD.195 ARLINGTON HEIGHTS ROADSUITE 125BUFFALO GROVE, IL 60089

Goods and services

ClassDescriptionStatusFirst use
007Generators, namely, electric power generators, automatic standby electric generator sets, gas-operated power generators, diesel-operated power generators, emergency power generators, mobile electric power generators, current generators; electric generating units powered by internal combustion engines; electricity generators; dynamos; electric generators; parts for all of the foregoingACTIVEApr 30, 2017
009Software for use in the management and analysis of power system requirements for energy management; power transfer switches for automatically switching between a primary power source and a back-up power source; computer-based building automation system for monitoring, controlling and reporting the use and status of lighting, energy consumption, security systems and heating, cooling and ventilation equipment comprising a computer cathode ray tube (CRT), computer operating programs, keyboard, printer, building zone area sensors and monitors, subcomputers in the nature of laptops, board level computers, and power controllers associated therewith; electrical and electronic controllers for heating, cooling and ventilating equipment; building automation computer hardware and software for integrating multiple building systems into one centralized platform; building integration and management software designed for large building applications or multiple buildings within portfolioACTIVEJan 31, 1970
011Water heaters; electrostatic air filters for air conditioning and for domestic use; refrigerating machines and installations; electric heaters for commercial use; immersion heaters; portable electric heaters; blast chillers for commercial food preparation and storage; refrigeration equipment, namely, food and beverage chilling units; installations for conditioning air; air handlers; humidifiers; energy and heat recovery ventilators; ventilating exhaust fans; diffusers for heating and air conditioning; convection ovens; air cleaning units; barometric condensers for condensing vapors by contact with liquids; cooling evaporators; external ballast and bilge water filtering and absorbing device for use in a local containment area for removing oil and other contaminants from the effluent; gas condensers, other than parts of machines; refrigerator condensers; coils as parts of distilling, heating or cooling installations; fans for air conditioning apparatus; electric fans; hot air blowers; furnaces; air conditioners; heat pumps; heat exchangers, not parts of machines, and parts for all of the aforesaidACTIVEJan 5, 1912

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 7, 2024NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Mar 7, 2024C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Mar 7, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 14, 2023E815TEAS SECTION 8 & 15 RECEIVED—
Jan 23, 2023REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jan 23, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 20, 2017SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Dec 19, 2017CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Nov 28, 2017SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Nov 27, 2017AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Nov 9, 2017IUAFUSE AMENDMENT FILED—
Nov 9, 2017EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
May 9, 2017NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Mar 14, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 14, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 22, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 3, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 25, 2017XAECEXAMINER'S AMENDMENT ENTERED—
Jan 25, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 25, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 25, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 17, 2017DOCKASSIGNED TO EXAMINER—
Oct 18, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 15, 2016NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance